hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.8.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9 Uplink TBF, Handling of Erroneous PAN Fields,Time Based Format
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.1 Conformance Requirements
1. In the case of a PAN field, the bitmap shall be interpreted in the same way as for the case of PACKET UPLINK ACK/NACK, EGPRS PACKET DOWNLINK ACK/NACK or EGPRS PACKET DOWNLINK ACK/NACK TYPE 2 message with the following exceptions: • if the processing of a PAN would cause an element of V(B) to be changed from ACKED or...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.2 Test Purposes
1. To verify that the mobile station ignores the entire PAN field if a previously positively acknowledged data block is subsequently negatively acknowledged. 2. To verify that the mobile station ignores the entire PAN field if the PAN field positively acknowledges a data block which has yet to be transmitted. 3. To ver...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.9.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfe...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10 Downlink TBF, with Concurrent Uplink TBF, Polled FANR
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.1 Conformance Requirements
1. If the RLC endpoint transmitter is the network and the mobile station has at least one concurrent TBF in the uplink direction, the network may poll the mobile station to trigger the FANR procedure. In this case the mobile station shall answer in a reserved radio block period which is allocated with the polling as de...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.2 Test purpose
1. To verify that the mobile station shall respond to polling for PAN by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.10.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Out of Sequence Condition
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.1 Conformance requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 2. For a TBF with FANR activated, the network may poll the mobile station to tri...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition in the header of an uplink data block belonging to its concurrent uplink TBF.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.11.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12 Downlink TBF, with Concurrent Uplink TBF, Event Based FANR, Corrupted RLC Data Part with Event-based Fast Ack/Nack reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.1 Conformance requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction.. 2. For a TBF with FANR activated... if enabled at TBF establishment/reconfigura...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a sends correctly encoded PAN field into the header of an uplink data block belonging to it's concurrent uplink TBF while receiving upon receipt of an incorrect downlink RLC data ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.12.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establish...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13 Downlink TBF, with Concurrent Uplink TBF, Event Based and Polled FANR Combined
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.1 Conformance requirements
Event-based FANR may be used together with Polled FANR (see sub-clause 9.1.14.2). If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC b...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.2 Test purpose
1. To verify that the mobile station establishes a downlink TBF with event-based FANR enabled. 2. To verify that the mobile station inserts a correctly encoded PAN field in response to the out of sequence condition into the header of an uplink data block belonging to it’s concurrent uplink TBF. 3. To verify that the mo...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.13.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14 Downlink TBF, with and without Concurrent Uplink TBF, CES/P Polling Response
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.1 Conformance requirements
For EGPRS when FANR is activated or for EGPRS2, the Combined EGPRS Supplementary/Polling field describes the feedback request and specifies a single uplink block in which the mobile station shall transmit a PACKET CONTROL ACKNOWLEDGEMENT message, a PACCH block or (applicable only if FANR is activated) a radio block con...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.2 Test purpose
1. To verify that the mobile station responds with the correct polling response when polled with CES/P values 001,010,011,100,101,110 and 111 during concurrent TBF is ongoing. 2. To verify that the mobile station responds with the correct polling response when polled with CES/P values 011 and 100 after the completion...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.14.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishm...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CS REQUEST
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.1 Conformance Requirements
1. The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. The mobile station is allowed to retransmit the PACKET CS REQUEST message once while timer T3196 is running. The second sending occurrence of this message shall take place at the first suitable oppor...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.2 Test purpose
2. To verify that the mobile station shall respond to polling for PAN by PACKET CS REQUEST in PACCH when a Mobile Originated call is initiated while downlink with concurrent uplink data transfer is on going.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.15.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 activated. Specific PICS Statements - Support of Enhanced DTM CS (TSPC_Enhanced_DTM_CS) PIXIT Statement...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16 Downlink TBF, with Concurrent Uplink TBF, Transmission of Other Messages in Response to Polling for PAN, PACKET CELL CHANGE NOTIFICATION
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.1 Conformance Requirements
Whenever the mobile station receives an RLC data block addressed to one of its TBFs and with a valid RRBP field or with a valid CES/P field in the RLC data block header (i.e. is polled), the mobile station shall transmit one of the following replies in the uplink radio block specified by the RRBP field or CES/P field ,...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.2 Test purpose
3. To verify that the mobile station shall respond to polling for PAN by PACKET CELL CHANGE NOTIFICATION in PACCH when the RF level of the serving cell is lowered such that it reselects another cell while downlink with concurrent uplink data transfer is on going.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.16.3 Method of test
Initial Conditions System Simulator: 2 cells (cell A, cell B), activated at power-on, EGPRS supported, default setting, PBCCH not present, CCN supported. Cell A: RLA_C = -50 dBm Cell B: RLA_C = -65 dBm Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP context2 a...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17 Downlink TBF, with and without Concurrent Uplink TBF, PAN Reaction Time, Polled PANR Polled Fast Ack/Nack reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.1 Conformance Requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 12. If the RLC endpoint transmitter is the network and the mobile station has at...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.2 Test purpose
1. To verify that the mobile station shall respond to polling (for a PAN) from the network by including a PAN field in a radio block belonging to a concurrent uplink TBF when a concurrent uplink TBF is established and uplink data is due to be sent. 2. To verify that the mobile station shall respond to polling for PAN b...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.17.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishment...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18 Downlink TBF, with Concurrent Uplink TBF, PAN Reaction Time, Event Based FANR
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.1 Conformance Requirements
1. If the RLC endpoint receiver is the mobile station, event-based FANR is enabled for this TBF and the mobile station has at least one assigned TBF in the uplink direction, the mobile station shall insert one PAN field in an EGPRS RLC/MAC block for data transfer transmitted during a given radio block period for that u...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.2 Test Purposes
1. To verify that when event based FANR is activated for a downlink TBF and a concurrent uplink TBF is established, the MS adheres to the PAN reaction time requirement when a missing or erroneous data block has been detected.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.18.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS initiates the establishment of a downlink ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19 Concurrent Uplink and Downlink TBFs, FANR/PAN, RLC Unacknowledged Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.1 Conformance Requirements
1. The Fast Ack/Nack reporting procedure (FANR) refers to the possibility to include, in a radio block for data transfer sent in one direction, piggy-backed ack/nack information relative to a TBF with FANR activated in the other direction. 2. FANR can be activated for a TBF operated in RLC unacknowledged mode. Referenc...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.2 Test Purposes
1. To verify that the mobile station operates concurrent uplink and downlink TBFs with FANR enabled in RLC unacknowledged mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.1.19.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT PG CYCLE negotiated and the test PDP Context 3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to transfer 1000 octets of us...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2 EGPRS test cases for RTTI Configuration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1 Uplink RTTI TBF/ Default PDCH pair configuration/ Dynamic Allocation / BTTI USF Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.1 Conformance Requirements
1. Whenever the mobile station detects an assigned USF value on a monitored downlink PDCH or PDCH-pair, the mobile station shall transmit either a single RLC/MAC block or a sequence of four RLC/MAC blocks on the same PDCH or corresponding PDCH-pair for that TBF except if that TBF is running in extended uplink TBF mode,...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.2 Test Purposes
To verify: 1. The MS is able to operate in RTTI configuration when receiving the USF in BTTI USF mode. 2. When the mobile station receives an assigned USF on the first PDCH of the downlink PDCH-pair, it transmits uplink radio blocks in the first two TDMA frames of the following radio block period on the corresponding P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP context3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS orders the MS to have two-phase access. In PACKET U...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.2 Uplink RTTI TBF/ default PDCH pair configuration/Dynamic Allocation/ RTTI USF Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.2.1 Conformance Requirement
Whenever the mobile station detects an assigned USF value on a monitored downlink PDCH or PDCH-pair, the mobile station shall transmit either a single RLC/MAC block or a sequence of four RLC/MAC blocks on the same PDCH or corresponding PDCH-pair for that TBF except if that TBF is running in extended uplink TBF mode, in...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.2.2 Test Purposes
To verify: 1. The MS is able to operate in RTTI configuration when receiving the USF in RTTI USF mode. 2. When the mobile station receives an assigned USF on a monitored downlink PDCH-pair in the first reduced radio block of a given basic radio block period, it transmits uplink RTTI radio blocks in the second reduced r...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and test PDP Context 3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform uplink packet transfer. In the PACKET UPLINK ASSIGNMENT message sent...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.3 Uplink RTTI TBF/default PDCH pair configuration/Extended Dynamic Allocation /BTTI USF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.3.1 Conformance Requirements
The PACKET UPLINK ASSIGNMENT and MULTIPLE TBF UPLINK ASSIGNMENT messages assign to the mobile station a subset of 1 to N uplink PDCHs (when the uplink TBF operates in BTTI configuration) or uplink PDCH-pairs (when the uplink TBF operates in RTTI configuration), where N depends on the mobile station multislot class. The...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.3.2 Test Purposes
To verify: 1. When the mobile station receives an assigned USF on the first PDCH of the downlink PDCH-pair, it transmits uplink radio blocks in the first two TDMA frames of the following radio block period on the corresponding PDCH-pair and all assigned uplink PDCH-pairs with higher numbered timeslots. 2. When the mobi...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.3.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, Extended dynamic allocation supported, PBCCH not present Mobile Station: The MS is EGPRS updated with a P-TMSI allocated and the test PDP context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS orders the MS to have two-pha...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.4 Uplink RTTI TBF/default PDCH pair configuration/Extended Dynamic Allocation /RTTI USF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.4.1 Conformance Requirement
The PACKET UPLINK ASSIGNMENT and MULTIPLE TBF UPLINK ASSIGNMENT messages assign to the mobile station a subset of 1 to N uplink PDCHs (when the uplink TBF operates in BTTI configuration) or uplink PDCH-pairs (when the uplink TBF operates in RTTI configuration), where N depends on the mobile station multislot class. The...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.4.2 Test Purposes
To verify: 1. When the mobile station receives an assigned USF on a monitored downlink PDCH-pair in the first reduced radio block of a given basic radio block period, it transmits uplink PDCH-pair and all assigned PDCH-pairs with higher numbered timeslots in the second reduced radio block period starting in the same ba...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.4.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, Extended dynamic allocation supported, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated and the test PDP context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform upli...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.5 Uplink RTTI TBF/Default PDCH pair configuration/Dynamic Allocation/USF Mode reconfiguration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.5.1 Conformance Requirement
The network may, at any time during uplink packet transfer, change the TTI configuration or USF mode (BTTI USF mode or RTTI USF mode) as well as the corresponding downlink PDCH-pairs of an already established uplink TBF by sending on the downlink PACCH, an uplink TBF assignment message (e.g. PACKET UPLINK ASSIGNMENT, M...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.5.2 Test Purposes
To verify: 1. When using BTTI USF mode, if the MS is granted the allocated USF in basic radio block period B(n) on the first of the two downlink timeslots corresponding to an uplink PDCH pair, the MS shall transmit an uplink radio block in reduced radio block period B(n+1)a occurring in the first two TDMA frames of bas...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.5.3 Method of test
Initial Conditions System Simulator: 1 cell, default setting. Mobile Station: The MS is GPRS attached with a P-TMSI allocated and the test PDP Context 3 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform uplink packet transfer. In the PACKET UPLINK ASSIGNMENT message ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.6 Uplink RTTI TBF / One Phase Access Request by Reduced Latency MS / CCCH Case / Contention Resolution
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.6.1 Conformance requirements
EGPRS TBF mode capable mobile stations shall monitor the GPRS Cell Options IE on the BCCH (SI13) for the cell's EGPRS capability and, if the mobile station is also Reduced Latency capable, the cell’s Reduced Latency Access capability. In the GPRS Cell Options IE it is also indicated if the EGPRS PACKET CHANNEL REQUEST ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.6.2 Test purpose
1. To verify that the MS uses the Access Type “One Phase Access Request by Reduced Latency MS” when appropriate. 2. To verify that the MS is able to utilise a PDCH pair assigned via the IMMEDIATE ASSIGNMENT message. 3. To verify that the MS completes the one phase access contention resolution procedure upon receipt of ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.6.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to initiate u...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.7 Concurrent RTTI TBF / Channel Quality Reporting
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.7.1 Conformance requirements
In case of EGPRS the MS shall report the overall MEAN_BEP and CV_BEP for the modulations, GMSK and/or 8-PSK (i.e. GMSK_MEAN_BEP, GMSK_CV_BEP; and/or 8PSK_MEAN_BEP, 8PSK_CV_BEP respectively) for which it has received blocks on at least one allocated channel (timeslot or timeslot pair) since it last sent a measurement re...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.7.2 Test purpose
To verify that the MS is able to report the Channel Quality Report of the downlink RTTI Channels when operating in a RTTI configuration. The mean bit error probability value measured per RTTI channel basis shall be reported on GMSK_MEAN_BEP_TNx/8PSK_MEAN_BEP_TNx or MODULATION_1_MEAN_BEP_TNx/ MODULATION_1_MEAN_BEP_TNx w...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.7.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform up...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.8 Downlink RTTI TBF / default PDCH pair configuration/CCCH case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.8.1 Conformance requirements
The network initiates the packet downlink assignment procedure by sending an IMMEDIATE ASSIGNMENT message in unacknowledged mode on the CCCH timeslot corresponding to CCCH group the mobile station belongs to. On receipt of an IMMEDIATE ASSIGNMENT message or, in case of a two-message assignment, a matching pair of IMMED...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.8.2 Test purpose
To verify that the MS is able to operate in RTTI configuration when assigned a Downlink RTTI TBF with default PDCH pair configuration by a IMMEDIATE ASSIGNMENT.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.8.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The SS sends an IMMEDIATE ASSIGNM...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.9 Concurrent RTTI TBFs / Explicit PDCH Pair Configuration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.9.1 Conformance Requirement
If the default single carrier PDCH pair configuration is indicated, then the assignment is for resources on a subset of the PDCH pairs comprising timeslots 0 and 1, 2 and 3, 4 and 5, and 6 and 7 in both the uplink and on the downlink. If the default dual carrier PDCH pair configuration is indicated, then the assignment...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.9.2 Test Purposes
To verify that the MS can operate concurrent uplink and downlink TBFs where the PDCH pairs have been explicitly assigned using the Downlink_PDCH_Pairs_C1 and Uplink_PDCH_Pairs_C1 fields for the following PDCH pair configurations :- 1. The assigned downlink PDCH pair uses the same timeslots as the corresponding downlink...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.9.3 Method of Test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and the test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.10 Concurrent RTTI TBF / Change in TTI configuration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.10.1 Conformance requirements
The network may, at any time during uplink packet transfer, change the TTI configuration or USF mode (BTTI USF mode or RTTI USF mode) as well as the corresponding downlink PDCH-pairs of an already established uplink TBF by sending on the downlink PACCH, an uplink TBF assignment message (e.g. PACKET UPLINK ASSIGNMENT, M...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.10.2 Test purpose
To verify: 1. The MS is able operate in the new TTI configuration when the TTI configuration (BTTI to RTTI and vice-versa) of an ongoing RTTI or BTTI TBF is changed. 2. The MS is able to perform TTI mode reconfiguration during an ongoing uplink packet transfer and shall respond to the new parameters within the reaction...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.10.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, PBCCH not present. Mobile Station: The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated and test PDP Context 2 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is triggered to perform up...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.11 Concurrent RTTI TBF / Downlink Dual Carrier configuration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.11.1 Conformance requirements
If the default dual carrier PDCH pair configuration is indicated, then the assignment is for resources on a subset of the PDCH pairs comprising timeslots 0 and 1, 2 and 3, 4 and 5, and 6 and 7 on both carriers in both the uplink and on the downlink. Otherwise, the assignment is for resources on a subset of the PDCH pai...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.11.2 Test purpose
To verify that: - the MS is able to operate a RTTI TBF in Downlink Dual Carrier configuration - the MS is able to change from concurrent RTTI in DLDC mode to Single Carrier BTTI mode and back to concurrent RTTI in DLDC mode - PDCH pairs on each of the downlink are different from each other - the PDCH pair Timeslots are...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.11.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, default setting, Downlink Dual Carrier configuration, PBCCH not present. Mobile Station: Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE. The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE negotiated Specific PI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.12 Concurrent RTTI TBF / Dual Transfer Mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.12.1 Conformance requirements
The RR connection establishment procedure is initiated by the RR entity of the mobile station. Initiation is triggered by request from the MM sublayer to enter dual transfer mode. The request from the MM sublayer to establish the RR connection specifies an establishment cause. While in dedicated mode, the establishment...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.12.2 Test purpose
To verify that the MS is able to operate a RTTI TBF in Dual Transfer Mode with DTM Command message. The following parts are verified: MS is in active state of a call and MS initiates the data. MS is in active state of a call and the network initiates the data. MS is in a packet transfer mode and user is made to initia...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58a.2.12.3 Method of test
Initial Conditions System Simulator: 1 cell with EGPRS support, DTM supported, default setting, PBCCH not present. Mobile Station: The MS is in the active state (U10) of a call. Support for Dual Transfer Mode indicated in MS Radio Access Capabilities IE. The MS is EGPRS updated, with a P-TMSI allocated, SPLIT_PG_CYCLE ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b Downlink Dual Carrier and Downlink Multi Carrier
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b.1 Downlink Dual Carrier Reconfiguration
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b.1.1 Single Carrier Uplink TBF with no Downlink TBF/ DLDC TBF established / No change in Uplink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b.1.1.1 Conformance requirement
If the network and mobile station both support Downlink Dual Carrier, the network may send a packet assignment message to a mobile station specifying packet resources for one or more TBFs on two carriers (referred to as carrier 1 and carrier 2) and thereby establish a Downlink Dual Carrier configuration. If this messag...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b.1.1.2 Test purpose
To verify that the MS: - decodes correctly the Packet downlink Assignment that assigns dual downlink carrier - is able to correctly receive data simultaneously on both the carriers assigned
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
58b.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, EGPRS supported, Downlink Dual Carrier supported. Mobile Station: Support for Downlink Dual Carrier indicated in MS Radio Access Capabilities IE. The MS is in the state "idle, GMM-registered" with a P-TMSI allocated, SPLIT PG CYCLE negotiated, and PDP context 2 activated. Sp...