hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.2.3 7.68 Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.3 Test purpose | The test purpose is to verify the ability of the receiver to receive a predefined test signal ,representing a static propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a block error ratio (BLER) not exceeding a specified value. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS, the fading simulator, AWGN Generator and additional components to the UE antenna connector as shown in figure A.20.
2) A call is set up according to the Generic call setup procedure. The char... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.4.2 Procedure | Measure the BLER of DCH received from the UE at the SS for all tests specified in Table 12.3.2.2a and Table 12.3.2.2b for 1,28 Mcps TDD Option. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.5 Test requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.5.1 3.84Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.5.2 1.28Mcps TDD Option | The measured BLER shall not exceed the values indicated in table 12.3.5.2 for 1.28 Mcps TDD Option.
Table 12.3.5.2: Performance requirements in static propagation conditions
Test Number
[dB]
BLER
1
13.0
10-2
2
16.4
10-2
3
20.7
10-2
4
14.5
10-1
5
19.6
10-1
6
22.3
10-1
NOTE: If the Test Requirement differs from the Minim... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.3.5.3 7.68Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4 Demodulation of DCH in Multipath fading Case 3 conditions | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.1 Definition and applicability | The performance requirement of DCH in Multipath fading Case 3 conditions is determined by the maximum Block Error Ratio (BLER). The BLER is specified for each individual data rate of the DCH. DCH is mapped into the Dedicated Physical Channel (DPCH).
The requirements and this test apply to all types of 1.28 Mcps TDD UE ... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.2 Minimum requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.2.1 3.84 Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.2.2 1.28 Mcps TDD Option | For the parameters specified in Table 12.4.2.2a and and Table 12.4.2.2b the BLER should not exceed the piece-wise linear BLER curve specified in Table 12.4.2.2c. The reference for this requirement is TS 25.102 [1] clause 12.4.1.2.
Table 12.4.2.2a: DCH parameters in Multipath fading Case 3 conditions (12.2 kbps)
Paramet... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.2.3 7.68 Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.3 Test purpose | The test purpose is to verify the ability of the receiver to receive a predefined test signal ,representing a static propagation channel for the wanted and for the co-channel signals from serving and adjacent cells, with a block error ratio (BLER) not exceeding a specified value. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.4 Method of test | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.4.1 Initial conditions | Test environment: normal; see clauses G.2.1 and G.2.2.
Frequencies to be tested: mid range; see clause G.2.4.
1) Connect the SS, the fading simulator, AWGN Generator and additional components to the UE antenna connector as shown in figure A.20.
2) A call is set up according to the Generic call setup procedure. The char... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.4.2 Procedure | Measure the BLER of DCH received from the UE at the SS for all tests specified in Table 12.4.2.2a and Table 12.4.2.2b for 1,28 Mcps TDD Option. |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.5 Test requirements | |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.5.1 3.84Mcps TDD Option | [FFS] |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.5.2 1.28Mcps TDD Option | The measured BLER shall not exceed the values indicated in table 12.4.5.2 for 1.28 Mcps TDD Option.
Table 12.4.5.2: Performance requirements in static propagation conditions
Test Number
[dB]
BLER
1
7.7
10-2
2
10.0
10-2
3
12.8
10-2
4
12.1
10-1
5
15.5
10-1
6
18.2
10-1
NOTE: If the Test Requirement differs from the Minimu... |
40bd05ebf1e9d686c3dc55dd3e817398 | 34.122 | 12.4.5.3 7.68Mcps TDD Option | [FFS] |
852c5999d703da168048fd5b505d5d2d | 30.820 | 1 Scope | The present document contains the up-to-date SA5 Work Item Descriptions (WIDs) and captures the status of all SA5 work items in the current Release.
This TR is used as a mean to provide input to the 3GPP work plan handled by MCC.
Status list of Work items can be found in Annex A of the present document. |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2 References | The following documents contain provisions which, through reference in this text, constitute provisions of the present document.
• References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific.
• For a specific reference, subsequent revisions do not apply.
• Fo... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 3 Local IP Access and Selected Internet IP Traffic Offload UID_450035 | TSG SA Meeting #51 SP-110131
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111532
SA5#76, 28 Feb - 4 Mar 2011, San Diego, USA revision of S5-111079
3GPP TSG-SA5 (Telecom Management) MCC merger of S5-094347 and S5-0904339
Meeting SA5#68, 9 Nov-13 Nov 2009, Shanghai, China
TSG SA Meeting #45 SP-... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 3.1 OAM&P for LIPA_SIPTO UID_450040 | Clauses 3.1 and 3.2 share the same SA-wide WI description reported in 3.2. |
852c5999d703da168048fd5b505d5d2d | 30.820 | 3.2 Charging for LIPA_SIPTO UID_460039 | Local IP Access and Selected IP Traffic Offload UID_LIPA_SIPTO |
852c5999d703da168048fd5b505d5d2d | 30.820 | 1 3GPP Work Area * | Radio Access
X
Core Network
Services |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2 Classification of WI and linked work items | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2.0 Primary classification * | This work item is a … *
Study Item (go to 2.1)
Feature (go to 2.2)
X
Building Block (go to 2.3)
Work Task (go to 2.4) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2.1 Study Item | Related Work Item(s) (if any]
Unique ID
Title
Nature of relationship
Go to §3. |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2.2 Feature | Related Study Item or Feature (if any) *
Unique ID
Title
Nature of relationship
Go to §3. |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2.3 Building Block | Parent Feature (or Study Item)
Unique ID
Title
TS
410030
Network Improvements for Machine-Type Communications
-
This work item is … *
Stage 1 (go to 2.3.1)
Stage 2 (go to 2.3.2)
X
Stage 3 (go to 2.3.3)
Test spec (go to 2.3.4)
Other (go to 2.3.5)
2.3.3 Stage 3 *
Corresponding stage 2 work item (if any)
Unique ID
Title
... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 3 Justification * | Excerpt from TR 22.868 on Machine-to-Machine communications:
“It appears that there is market potential for M2M beyond the current "premium M2M market segment" i.e. the market segments that are currently using M2M. In particular it is possible to identify potential applications for mass M2M service, e.g. consumer produ... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 4 Objective * | The objective is to enhance existing PS/EPS charging with Machine-Type Communications (MTC) information in alignment to the Rel-10 stage 2 description for MTC service support. Only Charging requirements specified in stage 1 TS 22.368 shall be addressed in this work item. |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5 Service Aspects | Covered by the parent Feature |
852c5999d703da168048fd5b505d5d2d | 30.820 | 6 MMI-Aspects | Covered by the parent Feature |
852c5999d703da168048fd5b505d5d2d | 30.820 | 7 Charging Aspects | This is a Charging Work Item |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8 Security Aspects | Covered by the parent Feature |
852c5999d703da168048fd5b505d5d2d | 30.820 | 9 Impacts * | Affects:
UICC apps
ME
AN
CN
Others
Yes
X
No
X
X
X
X
Don't know |
852c5999d703da168048fd5b505d5d2d | 30.820 | 10 Expected Output and Time scale * | New specifications *
[If Study Item, one TR is anticipated]
Spec No.
Title
Prime rsp. WG
2ndary rsp. WG(s)
Presented for information at plenary#
Approved at plenary#
Comments
Affected existing specifications *
[None in the case of Study Items]
Spec No.
CR
Subject
Approved at plenary#
Comments
32.251
MTC charging enhanc... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 4 IP Flow Mobility and seamless WLAN offload UID_450041 | Technical Specification Group Services and System Aspects TSGS#47(10)0089
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5-101018
Meeting SA5#70, 01 - 05 Mar 2010, Xiamen, China
3GPP TSG-SA5 (Telecom Management) S5-100484
Meeting SA5#69, 18 - 22 Jan 2010, Valencia, Spain revision of S... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 4.1 Charging for IFOM UID_470021 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1 Network Infrastructure Management UID_460032 | Technical Specification Group Services and System Aspects TSGS#48(10)0293
Meeting #48; Seoul, Republic of Korea; 07-10 June 2010
3GPP TSG-SA5 (Telecom Management) S5-101530
Meeting SA5#71, 10-14 May 2010, Montreal, Canada revision of SP-090758
TSG SA Meeting #46 SP-090758
07 - 10 December 2009,
Sanya, China |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.1 Common RAT Network Resource Model (NRM) - RAT_NRM_common – UID_460033 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.2 IRP Solution Set Specification Organisation Improvements (OAM-IRP-SS) UID_470035 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.3 Service Oriented Architecture (SOA) for IRP; continuation (OAM-SOA-IRP) UID_470036 | Technical Specification Group Services and System Aspects TSGS#47(10)0076
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5-100890
Meeting SA5#70, 1-5 March 2010, Xiamen, China revision of S5-100603 |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.4 IRP Overview, Profiles & Usage Guide (OAM-NIM-IRP_OPU) UID_ 480042 | 3GPP TSG SA Meeting #52 SP-110277
Bratislava, Slovakia, 06 – 08 June, 2011
3GPP TSG-SA5 (Telecom Management) S5-112084
SA5#77, 09 May – 13 May 2011; Shenzhen, China revision of SP-100777
TSG SA Meeting #50 SP-100777
13-15 Dec 2010, Istanbul, Turkey
Technical Specification Group Services and System Aspects TSGS#48(10)03... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.5 Alarm correlation and root cause analysis (OAM-AC-RCA) UID_510041 | TSG SA Meeting #51 SP-110137
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111498
SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111(198,343) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.1.6 Inventory Management Network Resource Model enhancements (OAM-IM-NMR) UID_510042 | TSG SA Meeting #51 SP-110141
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111493
SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111346 |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.2 Self-Organizing Networks OAM aspecsts (OAM-10-SON) UID_ 460034 | TSG SA Meeting #51 SP-110130
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111414
SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of S5-111088
TSG SA Meeting #51 SP-110130
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111414
SA5#76, 28 Feb - 4 Mar 2011; San Diego... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.2.1 SON self-optimization management continuation - LTE-SON-OAM-SO UID_460035 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.2.2 SON self-healing management (LTE-SON-OAM-SH) UID_460036 | TSG SA Meeting #51 SP-110150
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-111524
SA5#76, 28 Feb - 4 Mar 2011; San Diego, USA revision of SP-100776
TSG SA Meeting #50 SP-100776
13-15 Dec 2010, Istanbul, Turkey
3GPP TSG-SA5 (Telecom Management) S5-103369
SA5#74-OAM , 15 - 19 Nov 2010; Jacksonvi... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 11 Work item rapporteur(s) * | ZTE (zhu.weihong@zte.com.cn) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 12 Work item leadership * | SA5 |
852c5999d703da168048fd5b505d5d2d | 30.820 | 13 Supporting Individual Members * | Supporting IM name
ZTE
Vodafone
China Mobile
Nokia Siemens Networks
Huawei Technologies.
Motorola
T-Mobile
Orange
Telecom Italia
Telefonica
TeliaSonera
China Telecom |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.2.3 OAM aspects of Energy Saving in Radio Networks (OAM10-ES) UID_470037 | TSG SA Meeting #51 SP-110128
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-110533
SA5#75, 24 - 28 Jan 2011; Sorrento, ITALY revision of SP-110226
Technical Specification Group Services and System Aspects TSGS#47(10)0226
Meeting #47; Vienna, Austria; 22-25 March 2010 revision of SP-100077
3GPP ... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.3 Subscription Management (SuM) evolution OAM10-SuM UID_470038 | Technical Specification Group Services and System Aspects TSGS#47(10)0086
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5-100709
Meeting SA5#70, 01-05 March 2010, Xiamen, P.R.China
Source: Ericsson, Verizon Wireless, Alcatel-Lucent, Nokia Siemens Networks
Title: New WID on Subscripti... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 1 3GPP Work Area | X
Radio Access
X
Core Network
Services |
852c5999d703da168048fd5b505d5d2d | 30.820 | 2.0 Primary classification | This work item is a …
X
Study Item (go to 2.1)
Feature (go to 2.2)
Building Block (go to 2.3)
Work Task (go to 2.4) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 4 Objective | The objective of this technical work is to study automated energy savings management features. Usage of existing IRPs is expected as much as possible, e.g. Configuration Management IRP, etc. However, this technical work may identify the need for defining a new IRP.
The following operations may be considered in this stu... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.4 Performance Management (OAM10-PM) UID_470039 | Technical Specification Group Services and System Aspects TSGS#47(10)0083
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5- 100340
Meeting SA5#69, 18 - 22 Jan 2010, Valencia, Spain revision of S5-10xyzw
3GPP™ Work Item Description
For guidance, see 3GPP Working Procedures, article 39;... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.4.1 Key Performance Indicators (KPIs) for IMS (OAM-PM-KPI_IMS) UID_470040 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 3 Justification | Sustainable development is a long-term commitment in which all of us should take part. As part of sustainable development, our fight against global warming should be without respite. Our activities have a limited impact on environment: in 2007, the total footprint of the ICT sector was about 2% of the estimated total e... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.4.2 Key Performance Indicators (KPIs) for EPC (OAM-PM-KPI_EPC) UID_470041 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.4.3 Management of UE based network performance measurements (OAM-PM-UE) UID_470042 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 9 Impacts | Affects:
UICC apps
ME
AN
CN
Others
Yes
X
X
No
X
X
X
Don't know |
852c5999d703da168048fd5b505d5d2d | 30.820 | 10 Expected Output and Time scale | New specifications
[If Study Item, one TR is anticipated]
Title
Prime rsp. WG
2ndary rsp. WG(s)
Presented for information at plenary#
Approved at plenary#
Comments
TR 32.xx1
Study on Energy Savings Management -Concepts and Requirements
SA5
SA#47 Mar 2010
SA#47 Mar 2010
The TR shall describe concepts and requirements ... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 5.4.4 3G HNB and LTE HeNB Subsystem performance measurement (OAM-PM-HeNS) UID_470043 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 6 Charging Management small Enhancements (CH10) UID_470044 | Technical Specification Group Services and System Aspects TSGS#47(10)0090
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5-101075
Meeting SA5#70, 1-5 Mar 2010, Xiamen, P.R. China revision of S5-100975
Source: Orange
Title: WID Update: IWLAN Mobility charging
Document for: Approval
Ag... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 6.1 IWLAN mobility charging (IWLAN_Mob) UID_440063 Moved from Rel-9 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 6.2 Add solutions for Rc (reference point within OCS) (CH-Rc) UID_470045 Moved to Rel-11 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 7 Advice of Charge (AoC) service support enhancements (eAoC) UID_470046 | Technical Specification Group Services and System Aspects TSGS#47(10)0080
Meeting #47; Vienna, Austria; 22-25 March 2010
3GPP TSG-SA5 (Telecom Management) S5-101030
Meeting SA5#70, 01 - 05 Mar 2010, Xiamen, China revision of S5-100905
Source: Deutsche Telekom
Title: New WID proposal on Advice of Charge (AoC) service su... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 7.1 Advice of Charge (AoC) service support enhancements (eAoC) UID_470047 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8 Feasibility studies | Technical Specification Group Services and System Aspects TSGS#41(08)0464
Meeting #41, 15 - 18 September 2008,
Kobe, Japan
Source: SA5
Title: New SID on Rc Reference Point
Document for: Approval
Agenda Item: 12.18
3GPP TSG-SA5 (Telecom Management) S5-081204
Meeting SA5#60, 7 - 11 Jul 2008, Sophia Antipolis, FRANCE
Sour... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.1 Study on Rc Reference Point Functionalities and Message Flows UID_410044 – Moved from Rel-9 | Is this Work Item a "Study Item"? (Yes / No): Yes
1 3GPP Work Area
Radio Access
X
Core Network
Services
2 Linked work items
Release 8 Small charging enhancements
3 Justification
The purpose of this SID is to serve as a basis for detailed specification of OCS interfaces Rc in SA5. Under a comprehensive consideration ... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 10 Expected Output and Time scale (to be updated at each plenary) | New specifications
[If Study Item, one TR is anticipated]
Spec No.
Title
Prime rsp. WG
2ndary rsp. WG(s)
Presented for information at plenary#
Approved at plenary#
Comments
32.825
Telecommunication management; Charging management; Rc Reference Point Study
SA5
SA#47 Mar 2010
SA#47 Mar 2010
Affected existing specificatio... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 14a The WI is a Feature: List of building blocks under this feature | (list of Work Items identified as building blocks) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 14b The WI is a Building Block: parent Feature | (one Work Item identified as a feature) |
852c5999d703da168048fd5b505d5d2d | 30.820 | 14c The WI is a Work Task: parent Building Block | Release 8 Small charging enhancements
Technical Specification Group Services and System Aspects TSGS#43(09)0048
Meeting #43, 9 - 12 March 2009, Biarritz, France
3GPP TSG-SA5 (Telecom Management) S5-091460
Meeting SA5#63, 16-20 February 2009, Prague, Czech Republic
Source: Alcatel-Lucent, China Mobile, Huawei, Orange, ... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.2 Telecommunication Management; Energy Savings Management (ESM) UID_430044 – Moved from Release 9 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.3 Study on Integration of device management information with Itf-N (FS_UEM) UID_440069 – Moved from Release 9 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.4 Study on EPC Charging enhancement (FS_EPCcharg) UID_440050 | Work stopped at SA#47.
It was deemed that the issue is sufficiently covered by Rel-10 UID_460039 Charging for LIPA_SIPTO and UID_4700xy Charging for IFOM.
TSG SA Meeting #46 SP-090759
07 - 10 December 2009,
Sanya, China
TSG SA5 Meeting #69 SP-094316 |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.5 Study on Alignment of 3GPP Generic NRM IRP and TMF Shared Information Data (SID) model (FS_3GNRM_TMFSID) UID_460037 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.6 Study on Harmonization of 3GPP Alarm IRP and TMF Interface Program (TIP) Fault Management (FS_3G_TMF_FM) UID_460038 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.7 Study on version handling (FS_OAM_VH) UID_470050 Moved to Rel-11 | TSG SA Meeting #50 SP-100775
13-15 Dec 2010, Istanbul, Turkey
3GPP TSG-SA5 (Telecom Management) S5-103349
SA5#74-OAM , 15 - 19 Nov 2010; Jacksonville, USA revision of S5-103099
Technical Specification Group Services and System Aspects TSGS#48(10)0376
Meeting #48; Seoul, Republic of Korea; 07-10 June 2010
3GPP TSG-SA5 (... |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.8 Study on Alarm Correlation and Alarm Root Cause Analysis (FS_AC_ARCA) UID_480045 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.9 Study on Alignment of 3GPP PM IRP and TMF TIP PM (FS_3G_TMF_PM) UID_480046 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.10 Study on Management of Converged Networks (FS_ManCon) UID_480047 Moved to Rel-11 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 8.11 Study on User Data Convergence (UDC) information model handling and provisioning: Example Use Cases (FS_UDC_AppUseCase) UID_490039 Moved to Rel-11 | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 9 Network Improvements for Machine-Type Communications | |
852c5999d703da168048fd5b505d5d2d | 30.820 | 9.1 Charging for Network Improvements for Machine-Type Communication (NIMTC-CH) UID_510040 | TSG SA Meeting #51 SP-110136
21 - 23 Mar 2011, Kansas City, USA
3GPP TSG-SA5 (Telecom Management) S5-110541
SA5#75, 24 - 28 Jan 2011; Sorrento, Italy revision of S5-110499 |
41f4dd01af106b6509f05176f478e52b | 36.813 | 1 Scope | The present document is a technical report for “Adding L-Band LTE for ATC of MSS in North America” work item, which was approved at 3GPP TSG RAN#48 [2]. The objective of this work item is to add L-Band to the appropriate 3GPP core specifications for LTE FDD networks. In addition to the schedule and status of the work i... |
41f4dd01af106b6509f05176f478e52b | 36.813 | 2 References | The following documents contain provisions which, through reference in this text, constitute provisions of the present document.
● References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific.
● For a specific reference, subsequent revisions do not apply.
● Fo... |
41f4dd01af106b6509f05176f478e52b | 36.813 | 3 Definitions, symbols and abbreviations | |
41f4dd01af106b6509f05176f478e52b | 36.813 | 3.1 Definitions | For the purposes of the present document, the terms and definitions given in TR 21.905 [1] and the following apply. A term defined in the present document takes precedence over the definition of the same term, if any, in TR 21.905 [1]. |
41f4dd01af106b6509f05176f478e52b | 36.813 | 3.2 Symbols | For the purposes of the present document, the following symbols apply: |
41f4dd01af106b6509f05176f478e52b | 36.813 | 3.3 Abbreviations | For the purposes of the present document, the abbreviations given in TR 21.905 [1] and the following apply. An abbreviation defined in the present document takes precedence over the definition of the same abbreviation, if any, in TR 21.905 [1].
UE User Equipment
BS Base station
UL Uplink (Reverse Link)
DL Downlink (For... |
41f4dd01af106b6509f05176f478e52b | 36.813 | 4 Background | L-Band is licensed by the FCC as:
- 1525 – 1559 MHz: Down-link (eNodeB transmit, UE receive)
- 1626.5 – 1660.5 MHz: Up-link (UE transmit, eNodeB receive)
In 2003, the FCC changed its rules to permit the use of the L-band (and other bands) by satellite operators to provide nationwide terrestrial service (see [3]).
In 20... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.