hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
997ad2510cb826711e63f644e1d2617f
23.873
6.4.5.2 Lawful Interception of Intercept Related Information
The IRI (Intercept Related Information) signalling is handled by the SGSN server.
997ad2510cb826711e63f644e1d2617f
23.873
6.4.6 QoS Considerations (GTP-C option)
997ad2510cb826711e63f644e1d2617f
23.873
6.4.7 Information storage in PS-MGW (GTP-C option)
The PS-MGW has to store information on active PDP contexts in order to relay packets between the RNC and the GGSN. For uplink packets, the PS-MGW needs the GGSN Address for User Plane and the GGSN TEID for User Plane. For downlink packets, the PS-MGW needs the RNC Address for User Plane and the RNC TEID for User Plane. For signalling towards the SGSN Server, the PS-MGW needs the SGSN Server TEID for Control Plane. To perform QoS functions for user packets, the PS-MGW needs information on the negotiated QoS profile. In order to perform charging functions, the PS-MGW needs information on the charging characteristics of the PDP context in question. For CAMEL based prepaid services, the PS-MGW needs information on the data volume limit. When reaching the data volume limit, the PS-MGW sends a report to the SGSN Server. The information set which have to be stored in the PS-MGW is presented in the table below. Table 1: PS-MGW PDP context information Field Description PDP Type PDP type, e.g., PPP or IP. PDP Address PDP address, e.g., an IP address. QoS Profile Negotiated The quality of service profile negotiated. GGSN Address for User Plane The IP address of the GGSN currently used. GGSN TEID for User Plane Tunnel Endpoint Identifier towards the GGSN. RNC Address for User Plane The IP address of the RNC currently used. RNC TEID for User Plane Tunnel Endpoint Identifier towards the RNC. SGSN Server TEID for Control Plane Tunnel Endpoint Identifier for signalling towards the SGSN Server. Uplink TEID for PS-MGW Uplink Tunnel Endpoint Identifier for the PS-MGW end of the tunnel. Downlink TEID for PS-MGW Downlink Tunnel Endpoint Identifier for the PS-MGW end of the tunnel. Charging Characteristics The charging characteristics for this PDP context, e.g., normal, prepaid, flat-rate, and/or hot billing. Data Volume Limit The data volume limit used for CAMEL based prepaid services. The volume is measured in octets. Charging ID See TS 32.015. Identifies a PDP context per GGSN. Location Information RA, LAC and Cell Id of the MS. Can be used in charging.
997ad2510cb826711e63f644e1d2617f
23.873
6.4.8 Abnormal Cases (GTP-C option)
997ad2510cb826711e63f644e1d2617f
23.873
6.5 General Lawful Interception Considerations
As the protocol interfaces and data formats between the ADMF/DF and GSN entities were omitted from the scope of standardisation, constraints on the interoperability of the split SGSN exist, if the entities are to be supplied from different vendors. The ADMF and DF entities in this case would have to inter-operate with multiple vendors’ proprietary interfaces. How the ADMF and DF entities would inter-operate with these proprietary interfaces is FFS. When Rel99 SGSNs and SGSN servers from multiple vendors are deployed in the same network, further interoperability problems will become apparent as X1_1, X2 and X3 interface protocols and formats are not standardised. 3G TS 33.107 states, ‘the correlation number is unique in the whole PLMN and is used to correlate CC with IRI and the different IRI’s of one PDP context’. How this correlation number is derived is vendor specific and therefore cannot be guaranteed to be unique, when PS-MGWs and SGSN servers from different vendors are deployed in the same network. It is an open issue how the LI correlation issues could be handled properly in the SGSN Server – PS-MGW multivendor cases for the IRI and CC packet streams. Additionally the security method used to encrypt the IRI and CC information, when the DF is remote, may differ, creating more inter-operability considerations. As the IRI and CC information are now being delivered from separate entities, a failure of either entity would require additional signalling to be able to optimally handle the partial delivery of the LI data. Failure recovery could also present further difficulties, as the ADMF would now have to attain synchronisation with two, rather than one, SGSN network entities, for a single intercepted target. It is a general requirement in lawful interception that the CC would never be delivered without the IRI information. Therefore, if the X2 link from SGSN Server to DF2 failed, it is FFS how the CC information is delivered for the case where SGSN Server and PS-MGW are supplied from separate vendors. Figure 31: Lawful Interception interfaces in the case Rel99 and Split SGSN Entities with ADMF/DFs would co-exist in a network
997ad2510cb826711e63f644e1d2617f
23.873
6.6 Security
The security mechanisms Ipsec/IKE can be used on the Mp interface. Ipsec/IKE are recommended for the H.248 protocol and are parts of the security architecture that is under design in S3 for the UMTS R4/R5 network.
997ad2510cb826711e63f644e1d2617f
23.873
6.7 O&M
The split SGSN solution will add a new network element to manage but only minor changes to the 3GPP O&M standards.
997ad2510cb826711e63f644e1d2617f
23.873
6.8 RAN Considerations (e.g. GERAN)
No impacts are foreseen between the split of the SGSN and the RAN functionality since: - The Iu-PS interface is already split into a control plane and a user plane, and the existing protocols can be used as is. - The Gb interface will be terminated in the 2G-SGSN for both the control plane and the user plane. - GERAN uses either the Iu-PS or the Gb interface.
997ad2510cb826711e63f644e1d2617f
23.873
6.9 Compatibility
The compatibility issue between 2G and 3G is already handled in the sections on Mobility Management. As there is no impact on the existing PS protocols when introducing the split architecture, the SGSN server and the PS-MGW can have an interface towards R’97 (and later releases) nodes, both towards SGSN and GGSN.
997ad2510cb826711e63f644e1d2617f
23.873
6.10 Dynamic Allocation of PS-MGW Resources
A simple way of achieving resource sharing is that each SGSN server uses a primary PS-MGW and a secondary PS-MGW. Say SGSN server A uses PS-MGW A as its primary and PS-MGW B as its secondary, and SGSN server B uses PS-MGW B as its primary and PS-MGW A as its secondary. SGSN server A will therefore use PS-MGW A, and SGSN server B will use PS-MGW B when setting up all PDP contexts as long as resources are surplus. Say now that PS-MGW A becomes loaded. It will then inform its SGSN servers of the situation by sending a Notify message. SGSN server A can now start using PS-MGW B for setting up PDP contexts, just like SGSN server B is doing. When the load of the PS-MGW A has dropped to a certain threshold, it can inform its servers that they again can start using it, by sending another Notify message. Therefore SGSN server A will use PS-MGW A for setting up new PDP contexts. This shows that the ability to better utilise the total network capacity is increased in this case, as the alternative would be to reject the PDP context received in SGSN server A when the resources of PS-MGW A are scarce. This also shows that the split SGSN approach can be a clear advantage when the expected growth in user plane traffic occurs. Note that this is just a simple example, yet many other more advanced scenarios can be conceived. Work is ongoing in this area for the CS-domain, and the PS-domain should be able to adopt the same mechanisms in case H.248 is selected as the protocol on the Mp interface.
997ad2510cb826711e63f644e1d2617f
23.873
6.11 Benefits and Drawbacks
The benefits and drawbacks are compared to the R’99 architecture, unless otherwise specified. Benefits: - Flexibility to allocate processing capacity for traffic and for control in different locations - Flexibility to independently scale the control plane and the user plane by increasing/decreasing the number of nodes required to handle the corresponding traffic. Nodes could in principle be supplied by different vendors. - Allows an independent evolution and replacement of nodes in the user plane and the control plane (PS-MGW and SGSN server) as the corresponding technology evolves. Nodes could in principle be supplied by different vendors. - As an implementation option it is possible to have a combined CS/PS MGW, which allows for an efficient allocation of resources amongst both domains (e.g. if the CS and PS logical instances of the MGW share some of the hardware resources like interface cards and lower layer protocols, the available bandwidth can be distributed between them as needed). Similar efficient allocation of bandwidth can be achieved when deploying non-combined CS/PS MGWs. - As an implementation option it is possible to have an m:n relationship between SGSN servers and PS-MGWs, where each PS-MGW is connected to several SGSN servers and vice versa. This allows for an efficient allocation of user plane resources as the SGSN servers can setup new PDP contexts on another PS-MGW if one PS-MGW gets loaded. This will again lead to an increase of the ability to better utilise the total network capacity. - Implementation options provide for greater network redundancy amongst network elements (node failure and network overload conditions). Drawbacks: - Not always applicable (2G radio) - Increases standardisation and implementation work due to the new reference point Mp, including the control/management functionality between the SGSN server and the MGW. More vendor interoperability testing required for Iu and Mp interfaces and possibly for Lawful Interception. - Increases signalling load due to the new interface Mp (PDP context creation, update and deletion, gateway control, reporting of charging data, Lawful Interception, Iu release, Service Request, intersystem change, suspend and resume operations). Implementation options of m:n relationship between SGSN servers and PS-MGWs could also generate additional signalling loads. - Increases the time needed for signalling for some CAMEL based services, because there are more entities in the signalling path (i.e. PS-MGW – SGSN Server – SCP) - Additional O&M interfaces are needed to configure and to operate the additional network entities - Inter-system changes of the split architecture reduces the R99 advantages of co-locating 2G and 3G SGSNs. - More redundancy schemes would be required to be in-built to the system due to more different partial system failure cases (when e.g. a SGSN Server node would go down but the MGW node not or vice versa).
997ad2510cb826711e63f644e1d2617f
23.873
6.12 Open Issues
- Investigation into redundancy schemes are to be addressed in stage 3 work - Comparison analysis of H.248 and GTP-C protocols is to be addressed in stage 3 work - Migration to MIP Step 3, as proposed by TR 23.923, would negate the need for the split architecture. - Ongoing 3GPP work on Iu flexibility will allow load sharing between SGSNs, though with a potentially different level of granularity. The possible gains from sharing resources dynamically between PS-MGWs need to be evaluated against the Iu flexibility mechanism. - Investigation into how the ADMF and DF entities can inter-operate for Lawful Interception when SGSN Server/PS MGW entities and/or Rel99 SGSN/SGSN Servers from separate vendors are deployed.
997ad2510cb826711e63f644e1d2617f
23.873
7 Alternative 2: One Tunnel Approach
997ad2510cb826711e63f644e1d2617f
23.873
7.1 Introduction
The One Tunnel Approach separates transport and control functionality of the SGSN in applicable scenarios. The result of this separation are an SGSN controller (cSGSN) performing all control functions of an SGSN and an enhanced GGSN (xGGSN) which performs SGSN and GGSN transport functionality. This enables a direct GTP tunnel between the Radio Access Network and the xGGSN. The One Tunnel Approach gains an improved efficiency by bypassing the SGSN. Additional network entities, like a PS-MGW, are not needed in this approach. The One Tunnel Approach improves network efficiency and bearer service QoS for the bearer services that use a GGSN in the visited network by removing one PS domain specific core network node from the transport path when possible. This is the bearer service type best suited for the support of the IMS. It provides also high efficiency for most other users of IP bearer services. The efficiency is gained by less packet processing effort and less PS domain specific network nodes in the traffic path compared to the current R99 architecture. For the other bearer services requiring a GGSN outside the visited network or support of 2G GSM radio access or if either the SGSN or the GGSN is a R97-R99 node, the cSGSN performs also the transport functionality, therefore behaves like an SGSN. The One Tunnel Approach allows a smooth migration as it is compatible with the R99 architecture by establishing 2 user plane tunnels in this case (i.e. the existing R99 procedures are used). It has no impact on the Radio Access Network and improves the architecture and IP bearer services when using GGSNs in the visited network. With the growing use of this bearer services (e.g. by the IMS) and a reduction in the use of other bearer service types as well as an upgrade of GSM RAN to GERAN the networks can migrate to the One Tunnel Approach only. If this is the only IP bearer service type used in a PLMN, i.e. the GGSNs are always in the visited network, and only 3G UEs and post-R99 GSNs are to be supported then the network architecture can completely base on this approach.
997ad2510cb826711e63f644e1d2617f
23.873
7.1.1 Applicability
The benefits of the approaches depend on the extent of their applicability. An anticipation of future IP bearer service usage is therefore important to identify the gain of the approaches. The trends for the usage of IP bearer services anticipated here are: - IP based VPN solutions provide access to Intranets in an access independent way (one access means are the PS IP bearer services). This avoids the need for GGSNs dedicated for the access to specific Intranets. Dynamic PDP contexts are sufficient. - Roaming between ISPs in fixed networks is supported for example by RADIUS. The same is applicable for the PS CN resulting in more optimum routes by avoiding the tunnelling to ISP specific GGSNs potentially located in another network. - A PLMN acting also as an ISP takes advantage from short tunnels and dynamic addresses by less user profile data and by more optimum routing. Also the resource efficiency is better because of less encapsulation overhead. - The IMS as a main user of the IP bearer services requires high performance because all the IMS services base on the IP bearer service and the IMS has strong real time requirements for conversational services. All these trends are best supported by short tunnels and dynamically allocated IP addresses, i.e. a GGSN in the visited network. The overall performance and especially the realtime requirements of the IMS benefit from a reduction in the payload processing effort for provision of the strong delay figures. The main usage of the PS CN anticipated here is therefore best supported by IP bearer services with dynamic IP addresses and with short tunnels ending in the visited PLMN. For this main case of IP bearer service usage the one tunnel approach described here provides its benefits. The amount of roaming mobile user traffic is according to the U.K. Office of Telecommunications (Oftel) report November 2000 in U.K. 206 million call minutes roaming traffic coming inland of total 8388 million call minutes, i.e 2.5%, at the end of 1Q/2000. In Finland the figure for roaming traffic has been under 1%. And in an other country we can have a bigger percentage. Anyhow, in an average country the clear majority of the traffic is made so that the “point of access” is in the same country as the caller. Figure 32: The One Tunnel approach in roaming scenarios
997ad2510cb826711e63f644e1d2617f
23.873
7.2 Logical Architecture
The logical architecture for this approach, as an evolution of the reference logical architecture, is depicted in Figure 33. Figure 33: Evolved logical architecture for the One Tunnel Approach
997ad2510cb826711e63f644e1d2617f
23.873
7.2.1 Functional Nodes
Only functional nodes relevant for the One Tunnel Approach are described, i.e. which are changed compared with R99 or used differently.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.1.1 2G-SGSN
This evolved architecture has no impact on the 2G-SGSN or its interfaces. A 2G-SGSN is necessary to support the Gb interface which does not support a separation of transport and control. The Gn interface of a 2G-SGSN supports both user and control data.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.1.2 3G-SGSN / cSGSN
This evolved architecture has no impact on the 3G-SGSN and its interfaces and is compatible with it. A 3G-SGSN is necessary to support packet bearer services using GGSN external to the visited PLMN and packet bearer services using a R97-R99 GGSN. The 3G-SGSN can be upgraded to become an SGSN without data transport functionality by adding new functionality and modifying its interface towards the xGGSN. In order to have a differentiation between a 3G-SGSN with and a 3G-SGSN without transport functionality in the following the SGSN performing only control functions is named cSGSN. To enable setup of a user plane tunnel from an RNC directly to a GGSN, it is necessary for the cSGSN to know that the GGSN in question is capable of handling the one tunnel scenarios. The cSGSN controls the packet bearer services and handles all the signalling interfaces of an SGSN, including the GTP-C protocol on the Gn and Gp interfaces and the RANAP protocol on the Iu interface.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.1.3 GGSN / xGGSN
The R99 GGSN can be upgraded to become a GGSN required for the one tunnel approach by adding new functionality and modifying its interface towards the cSGSN. In order to have a differentiation the following notion is introduced. The notion of an (x)GGSN shall maintain a clear figure of the architecture. The (x)GGSN is a GGSN if 2G radio, a GGSN outside the visited network, a R97-R99 SGSN or a R97-R99 GGSN in the visited network shall be used. When a R99 GGSN is used two tunnels are established by the cSGSN, which then becomes an SGSN. If one tunnel is established, the (x)GGSN is an xGGSN. Multiple GGSN and xGGSN can be in the same network. The xGGSN itself performs all functions of a GGSN and some additional functions of an SGSN.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.2 Interfaces
Only interfaces relevant for the One Tunnel Approach are described, i.e. interfaces which are changed compared with 3GPP R99.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.2.1 Gn (cSGSN – xGGSN)
This interface evolves to control the direct GTP tunnel between RAN and xGGSN and to deliver information for SGSN specific transport functions to the xGGSN (location information and prepaid budget). The modifications compared with the R99 GTP version are: - One Tunnel information field is introduced as optional information into the PDP context creation and the modification messages. By means of this IE the SGSN notifies the GGSN of the establishment of one tunnel. Inside this IE additional information can be included, e.g. information whether the TEID and user data transport address are allocated or not, CAMEL information (e.g. initial budget), charging information (e.g. whether location dependent charging is required), interception information (e.g. wether location dependent interception is required). - The location report procedure is introduced (request and acknowledge). - The charging report procedure is introduced for CAMEL prepaid (request and acknowledge). - A procedure is required for requesting CAMEL prepaid volume data when time threshold elapses and at subscription change from CAMEL to CDR based charging. For this latter case, it is also required to signal that CAMEL based charging should be stopped. - For some procedures the sequence of the R99 messages is changed or an additional update is introduced to concatenate the Iu and the Gn GTP tunnels to one tunnel. Two aspects of the enhancement of the GTP has to be considered. The first one are the extensions of the GTP. As shown above it is necessary to extend some messages with optional information elements and some new procedures are needed. The second aspect is how can an SGSN know whether a GGSN is upgraded for the one tunnel approach or not. Only the SGSN has to know whether a GGSN is enabled for the one tunnel approach or not. The GGSN is always 57ignalling via optional information elements described above whether one tunnel is established or not. The Ies are also used to command the GGSN to perform additional functions like CAMEL. After an SGSN change the GGSN is enabled or disabled for the one tunnel approach by means of the included or respectively not included Ies. There are three possibilities to solve this problem; administration, a new GTP version and the use of optional information elements. In the following all alternatives should be discussed. Regarding the formats of the messages all alternatives are equal. The only difference is the mechanism to recognize the capabilities of the GGSNs. Administration By means of administration the SGSNs know which GGSNs are enabled for the one tunnel approach. New GTP version The introduction of a new GTP version is an automatic possibility for a SGSN to recognise whether a GGSN is an enhanced GGSN or not. By means of the version handling the SGSN knows in advance whether an one tunnel connection can be established with the concerned GGSN. The disadvantage is the introduction of a new GTP version. The advantage is the easy automatic recognition of the capabilities of the GGSNs. Introduction of optional Information Element This alternative uses at least one additional information element. This IE is described above and is a Type-Length-Value (TLV) IE. During a PDP context activation the SGSN adds the ‘One Tunnel’ IE in the Create PDP Context Request message. Due to this IE an updated GGSN knows that one tunnel shall be established and which functionalities are additionally required e.g. CAMEL. The updated GGSN acknowledges the request with a ‘One Tunnel Response’ IE in the Create PDP Context Response message. Due to the sent ‘One Tunnel Response’ IE the SGSN knows that the GGSN is updated and the one tunnel approach can be used. In the case the GGSN is not updated, then the ‘One Tunnel’ IE is unknown for this GGSN. According to 3G TS 29.060 unknown optional Ies shall be ignored. Since the ‘One Tunnel’ IE is a TLV IE the GGSN skips this IE using its length value. This mechanism guarantees that the message is correctly interpreted except the ‘One Tunnel’ IE. A not updated GGSN answers as usual with a Create PDP Context Response message but without the acknowledgement of the one tunnel establishment. So due to the missing optional IE the SGSN knows that this GGSN is not updated. This mechanism is also used during an inter SGSN change. But then the Update PDP Context Request and Update PDP Context Response are used. The SGSN should store the capabilities of the GGSNs. Then the SGSN would know in advance which GGSN is updated. Proposal It is proposed to use the third alternative. This mechanism offers the best compatibility. Only through optional Ies and additional message flows the current GTP version is enabled for the One Tunnel approach. [Note: The final decision is an N4 issue.] Roaming to a home GGSN If it is required to establish a PDP context towards a home GGSN then the SGSN has to establish two tunnels. During the APN and GGSN selection defined in 3G TS 23.060 the SGSN determines whether the GGSN is in the VPLMN or in the HPLMN.
997ad2510cb826711e63f644e1d2617f
23.873
7.2.3 User Plane
The protocol stack for the user plane is shown in Figure 34. The protocol stacks in the UE, in the 3G-RAN and the 3G-GGSN are the same as specified in the 3GPP R99 architecture. The user plane protocols specified for the SGSN are not needed in the One Tunnel Approach. Instead the IP transport network adapts different physical transport protocols below IP if necessary. It is the IP Transport Network also used to forward the packets between RAN entities at relocation or handover and provides the connectivity between the core network nodes. In case two tunnels are established, e.g. to use R99 GGSN, the R99 user plane as described in 23.060 applies. Figure 34: User plane protocol stack
997ad2510cb826711e63f644e1d2617f
23.873
7.3 Mobility Management
The procedures are for packet bearer services using a GGSN in the visited network with a 3G RAN, i.e. for the cSGSN / xGGSN architecture of the One Tunnel Approach. For all other bearer services or 2G RAN the R99 procedures and the SGSN / GGSN as specified in TS 23.060 apply. Modifications compared with 3GPP R99 are in italic.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.1 Inter ISGSN Routeing Area Update
The Inter ISGSN Routeing Area Update procedure is illustrated in Figure 35. The difference compared with 3GPP R99 is in step 5) when the change is from a cSGSN or an SGSN to a cSGSN. In this case the Tunnel Endpoint Identifier delivered to the xGGSN indicates the reserved “not allocated” value for the traffic path as the Iu bearer is released and no tunnel endpoint is allocated at the RAN. At a change to an SGSN from SGSN or from cSGSN step 5) is handled as specified in 3GPP R99 (the SGSN TEID and IP address are sent to the xGGSN). The procedure described here is applicable for change between any combination of SGSN and cSGSN. Figure 35: Inter ISGSN Routeing Area Update Procedure 1) The UE sends a Routeing Area Update Request message (P‑TMSI, old RAI, old P‑TMSI Signature, Update Type, follow on request) to the new ISGSN. Follow on request shall be set by UE if there is pending uplink traffic (signalling or user data). The ISGSN may use, as an implementation option, the follow on request indication to release or keep the Iu connection after the completion of the RA update procedure. The RAN adds the Routeing Area Identity including the RAC and LAC of the area where the UE is located before forwarding the message to the ISGSN. 2) If the RA update is an Inter-ISGSN Routeing area update and if the UE was in PMM‑IDLE state, the new ISGSN sends SGSN Context Request message (old P‑TMSI, old RAI, old P‑TMSI Signature) to the old ISGSN to get the MM and PDP contexts for the UE. The old ISGSN validates the old P‑TMSI Signature and responds with an appropriate error cause if it does not match the value stored in the old ISGSN. This should initiate the security functions in the new ISGSN. If the security functions authenticate the UE correctly, the new ISGSN shall send an SGSN Context Request (IMSI, old RAI, MS Validated) message to the old ISGSN. MS Validated indicates that the new ISGSN has authenticated the UE. If the old P‑TMSI Signature was valid or if the new ISGSN indicates that it has authenticated the UE, the old ISGSN responds with SGSN Context Response (Cause, IUEI, MM Context, PDP contexts). If the UE is not known in the old ISGSN, the old ISGSN responds with an appropriate error cause. The old ISGSN starts a timer. 3) Security functions may be executed. These procedures are defined in subclause “Security Function” of TS 23.060. If the security functions do not authenticate the UE correctly, then the routeing area update shall be rejected, and the new ISGSN shall send a reject indication to the old ISGSN. The old ISGSN shall continue as if the ISGSN Context Request was never received. 4) If the RA update is an Inter-ISGSN Routeing area update, the new ISGSN sends an SGSN Context Acknowledge message to the old ISGSN. The old ISGSN marks in its context that the information in the (x)GGSNs and the HLR are invalid. This triggers the (x)GGSNs, and the HLR to be updated if the UE initiates a routeing area update procedure back to the old ISGSN before completing the ongoing routeing area update procedure. 5) If the RA update is an Inter-ISGSN RA Update and if the UE was in PMM‑IDLE state, the new ISGSN sends Update PDP Context Request (new SGSN Address, QoS Negotiated, Tunnel Endpoint Identifier) to the (x)GGSNs concerned. The (x)GGSNs update their PDP context fields and return an Update PDP Context Response (Tunnel Endpoint Identifier). If the new ISGSN is a cSGSN the Tunnel Endpoint Identifier indicate the reserved “not allocated” value for the traffic path as the Iu bearer is released and no tunnel endpoint is allocated at the RAN. In addition the CAMEL characteristics with the prepaid budget are sent to the xGGSN if applicable. If the new ISGSN is an SGSN the Tunnel Endpoint Identifier allocated at the SGSN is indicated to the (x)GGSN. Note: If the RA update is an Inter-ISGSN routeing area update initiated by an UE in PMM‑CONNECTED state, then the Update PDP Context Request message is sent as described in subclause “Serving RNS Relocation Procedures”. 6) If the RA update is an Inter-ISGSN RA Update, the new ISGSN informs the HLR of the change of ISGSN by sending Update Location (SGSN Number, SGSN Address, IMSI) to the HLR. 7) If the RA update is an Inter-ISGSN RA Update, the HLR sends Cancel Location (IMSI, Cancellation Type) to the old ISGSN with Cancellation Type set to Update Procedure. If the timer described in step 2 is not running, then the old ISGSN removes the MM context. Otherwise, the contexts are removed only when the timer expires. It also ensures that the MM context is kept in the old ISGSN in case the UE initiates another inter ISGSN routeing area update before completing the ongoing routeing area update to the new ISGSN. The old ISGSN acknowledges with Cancel Location Ack (IMSI). 8) If the RA update is an Inter-ISGSN RA Update, the HLR sends Insert Subscriber Data (IMSI, subscription data) to the new ISGSN. The new ISGSN validates the UE’s presence in the (new) RA. If due to regional subscription restrictions the UE is not allowed to be attached in the RA, the ISGSN rejects the Routeing Area Update Request with an appropriate cause, and may return an Insert Subscriber Data Ack (IMSI, SGSN Area Restricted) message to the HLR. If all checks are successful then the ISGSN constructs an MM context for the UE and returns an Insert Subscriber Data Ack (IMSI) message to the HLR. 9) If the RA update is an Inter-ISGSN RA Update, the HLR acknowledges the Update Location by sending Update Location Ack (IMSI) to the new ISGSN. 10) The new ISGSN validates the UE’s presence in the new RA. If due to roaming restrictions the UE is not allowed to be attached in the ISGSN, or if subscription checking fails, then the ISGSN rejects the routeing area update with an appropriate cause. If all checks are successful then the new ISGSN establishes MM context for the UE. The new ISGSN responds to the UE with Routeing Area Update Accept (P‑TMSI, VLR TMSI, P‑TMSI Signature). 11) The UE confirms the reallocation of the TMSIs by returning a Routeing Area Update Complete message to the ISGSN. For an UE with GPRS‑CSI defined, CAMEL interaction may be performed, see referenced procedures in 3G TS 23.078: C1) CAMEL-GPRS-SGSN-Context-Acknowledge. C2) CAMEL-GPRS-Routeing-Area-Update-Session. C3) CAMEL-GPRS-Routeing-Area-Update-Context.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.2 Location Report Procedure
This procedure is necessary in order to inform the xGGSN about the location of a subscriber. This is needed e.g. for location dependent interception or location dependent charging. Figure 36: Location Report Procedure 1) The cSGSN sends a Location Report message to the xGGSN. This could contain the SAI or a geographical area as defined in 25.413. 2) The xGGSN acknowledges the reception of the message. Internally the xGGSN performs the location dependent functionality.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.3 Serving SRNS Relocation Procedure
The Serving SRNS Relocation procedure is illustrated in figure 37. The sequence is valid for both intra cSGSN SRNS relocation and inter cSGSN SRNS relocation. The differences to 3GPP R99 are: in step 4) the RAN is provided with the user data TEID and user data Address of the xGGSN instead that of the SGSN and in step 11) the xGGSN gets the user data TEID and the user data signalling address of the RAN instead that of the SGSN. Figure 37: Serving SRNS Relocation Procedure 1) The source SRNC decides to perform/initiate an SRNS relocation. 2) The source SRNC initiates the relocation preparation procedure by sending a Relocation Required message (Relocation Type, Cause, Source ID, Target ID, Source RNC to target RNC transparent container) to the old cSGSN. The source SRNC shall set the Relocation Type to “UE not involved”. The Source to Target RNC Transparent Container includes the necessary information for Relocation co-ordination, security functionality and RRC protocol context information (including UE Capabilities). 3) The old cSGSN determines from the Target ID if the SRNS Relocation is intra cSGSN SRNS relocation or inter cSGSN SRNS relocation. In case of inter cSGSN SRNS relocation the old cSGSN initiates the relocation resource allocation procedure by sending a Forward Relocation Request message (IMSI, Tunnel Endpoint Identifier Signalling, MM Context, PDP Context, Target Identification, UTRAN transparent container, RANAP Cause) to the new cSGSN. At the same time a timer is started on the MM and PDP contexts in the old cSGSN (see the Routeing Area Update procedure). The Forward Relocation Request message is applicable only in case of inter cSGSN SRNS relocation. 4) The new cSGSN sends a Relocation Request message (Permanent NAS UE Identity, Cause, CN Domain Indicator, Source RNC to target RNC transparent container, RABs to be setup) to the target RNC. For each RAB requested to be established, the RABs to be setup information elements shall contain information such as RAB ID, RAB parameters, Transport Layer Address, and Iu Transport Association. The RAB ID information element contains the NSAPI value, and the RAB parameters information element gives the QoS profile. The Transport Layer Address is the xGGSN Address for user data, and the Iu Transport Association corresponds to Tunnel Endpoint Identifier Data allocated by the xGGSN. After all necessary resources for accepted RABs including the Iu user plane are successfully allocated, the target RNC shall send the Relocation Request Acknowledge message (RABs setup, RABs failed to setup) to the new cSGSN. The target RNC will for each RAB to be setup (defined by an IP Address and a Tunnel Endpoint Identifier) receive both forwarded downstream PDUs from the source SRNC as well as downstream PDUs from the xGGSN. 5) When the new cSGSN is ready for relocation of SRNS, the Forward Relocation Response message (Cause, RANAP Cause, and RAB Setup Information) is sent from new cSGSN to old cSGSN. This message indicates that the target RNC is ready to receive from source SRNC the downstream packets not yet acknowledged by the UE, i.e. the relocation resource allocation procedure is terminated successfully. RANAP Cause is information from the target RNC to be forwarded to the source RNC. The RAB Setup Information, one information element for each RAB, contain the RNC Tunnel Endpoint Identifier and RNC IP address for data forwarding from source SRNC to target RNC. If the target RNC or the new cSGSN failed to allocate resources the RAB Setup Information element contains only NSAPI indicating that the source RNC shall release the resources associated with the NSAPI. The Forward Relocation Response message is applicable only in case of inter cSGSN SRNS relocation. 6) The old cSGSN continues the relocation of SRNS by sending a Relocation Command message (RABs to be released, and RABs subject to data forwarding) to the source SRNC. The old cSGSN decides the RABs to be subject for data forwarding based on QoS, and those RABs shall be contained in RABs subject to data forwarding. For each RAB subject to data forwarding, the information element shall contain RAB ID, Transport Layer Address, and Iu Transport Association. The Transport Layer Address and Iu Transport Association is used for forwarding of DL N‑PDU from source RNC to target RNC. 7) Upon reception of the Relocation Command message from the PS domain, the source RNC shall start the data-forwarding timer. When the relocation preparation procedure is terminated successfully and when the source SRNC is ready, the source SRNC shall trigger the execution of relocation of SRNS by sending a Relocation Commit message (SRNS Contexts) to the target RNC. The purpose of this procedure is to transfer SRNS contexts from the source RNC to the target RNC. SRNS contexts are sent for each concerned RAB and contain the sequence numbers of the GTP‑PDUs next to be transmitted in the uplink and downlink directions and the next PDCP sequence numbers that would have been used to send and receive data from the UE. For connections using RLC unacknowledged mode PDCP sequence numbers is not used. If PDCP does not support lossless relocation, the acknowledged mode SRNS relocation procedures shall be performed as in unacknowledged mode. Hence PDCP sequence numbers shall not be transferred from old RNC to target RNC. 8) After having sent the Relocation Commit message, source SRNC begins the forwarding of data for the RABs to be subject for data forwarding. The data forwarding at SRNS relocation shall be carried out through the Iu interface, meaning that the data exchanged between source SRNC and target RNC are duplicated in the source SRNC and routed at IP layer towards the target RNC. 9) The target RNC shall send a Relocation Detect message to the new cSGSN when the relocation execution trigger is received. For SRNS relocation type “UE not involved”, the relocation execution trigger is the reception of the Relocation Commit message from the Iur interface. When the Relocation Detect message is sent, the target RNC shall start SRNC operation. 10) After having sent the Relocation Detect message, target SRNC responds to the UE by sending a RNTI Reallocation message. Both messages contain UE information elements and CN information elements. The UE information elements include among others new SRNC identity and S‑RNTI. The CN information elements contain among others Location Area Identification and Routeing Area Identification. The procedure shall be co-ordinated in all Iu signalling connections existing for the UE. The target SRNC resets and restarts the RLC connections, and exchanges the PDCP sequence numbers (PDCP‑SNU, PDCP‑SND) between the target SRNC and the UE. PDCP‑SND is the PDCP sequence number for the next expected in-sequence downlink packet to be received in acknowledged mode in the UE per radio bearer, which requires lossless relocation. PDCP‑SND confirms all mobile-terminated packets successfully transferred before the start of the relocation procedure. If PDCP‑SND confirms reception of packets that were forwarded from the source SRNC, then these packets shall be discarded by the target SRNC. PDCP‑SNU confirms all mobile originated packets successfully transferred before the start of the relocation procedure. If PDCP‑SNU confirms reception of packets that were received in the source SRNC, then these packets shall be discarded by the UE. 11) Upon reception of the Relocation Detect message, the CN may switch the user plane from source RNC to target SRNC. If the SRNS Relocation is an inter cSGSN SRNS relocation, the new cSGSN sends Update PDP Context Request messages (new signalling SGSN Address, signalling SGSN Tunnel Endpoint Identifier, RAN Address for user data, RAN TEID for user data, QoS Negotiated) to the xGGSNs concerned. The xGGSNs update their PDP context fields and return an Update PDP Context Response (GGSN Tunnel Endpoint Identifier separated for signalling and for user data). 12) When the UE has reconfigured itself, it sends the RNTI Reallocation Complete message to the target SRNC. From now on the exchange of packets with the UE can start. 13) When the target SRNC receives the RNTI Reallocation Complete message, i.e. the new SRNC—ID + S‑RNTI are successfully exchanged with the UE by the radio protocols, the target SRNC shall initiate the Relocation Complete procedure by sending the Relocation Complete message to the new cSGSN. The purpose of the Relocation Complete procedure is to indicate by the target SRNC the completion of the relocation of the SRNS to the CN. If the user plane has not been switched at Relocation Detect and upon reception of Relocation Complete, the CN shall switch the user plane from source RNC to target SRNC. If the SRNS Relocation is an inter cSGSN SRNS relocation, the new cSGSN shall signal to the old cSGSN the completion of the SRNS relocation procedure by sending a Forward Relocation Complete message. 14) Upon receiving the Relocation Complete message or if it is an inter cSGSN SRNS relocation; the Forward Relocation Complete message, the old cSGSN sends an Iu Release Command message to the source RNC. When the RNC data-forwarding timer has expired the source RNC responds with an Iu Release Complete. 15) After the UE has finished the RNTI reallocation procedure and if the new Routeing Area Identification is different from the old one, the UE initiates the Routeing Area Update procedure. Note that it is only a subset of the RA update procedure that is performed, since the UE is in PMM‑CONNECTED mode. For an MS with GPRS‑CSI defined, CAMEL interaction may be performed, see referenced procedures in 3G TS 23.078: C1) CAMEL-GPRS-SGSN-Context-Acknowledge. C2) CAMEL-GPRS-Routeing-Area-Update.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.4 Combined Hard Handover and SRNS Relocation Procedure
With the same modifications as for the SRNS Relocation Procedure above compared to 3GPP R99 this procedure relocates the direct GTP tunnel between RAN and xGGSN from one RNC to the other.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.5 UMTS to GSM Change
In this case the procedure is the same as specified in 23.060 for the R99 UMTS to GSM change. The SRNS Data Forward Command delivers from cSGSN to the SRNC tunnel endpoints for the packets to be forwarded. These tunnels terminate in the cSGSN as in R99. The downlink data flow is then GGSN – SRNC – cSGSN – 2G-SGSN until the GGSN is updated.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.6 GSM to UMTS SGSN Change
The intersystem change from GSM to UMTS takes place when a GPRS-attached UE changes from GSM radio access to UTRAN and the UTRAN node serving the UE is served by a different SGSN. In this case the RA changes. Therefore, the UE shall initiate a UMTS RA update procedure by establishing a RRC connection and initiating the RA update procedure. The RA update procedure is either combined RA / LA update or only RA update. If the network operates in mode I, then an UE that is both PS-attached and CS-attached shall perform the Combined RA / LA Update procedures. This concerns only idle mode (see 3G TS 23.122), as no combined RA / LA updates are performed during a CS connection.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.6.1 Intra SGSN Change
The difference compared with 3GPP R99 is, that an additional Update PDP Context in step 4) is needed. This message indicates to the xGGSN the reserved “not allocated” value for the traffic path as the Iu bearer is not yet allocated at the RAN. In step 12) the xGGSN tunnel endpoints are indicated to the RNC instead of the SGSN tunnel endpoints. Furthermore, for clarification in step 12) the parameters for RAB establishment are described as already specified in R99. Step 13) is additional compared to 3GPP R99 to update the xGGSN with the GTP tunnel IP address and the TEID received from the RAN when the Service Request is initiated which is the same as for the standalone Service Request procedure. Figure 38: GSM to UMTS Inter SGSN Change 1-3) as described in 23.060 4) The cSGSN sends an Update PDP Context Request (new SGSN Address, TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and return an Update PDP Context Response (TEID) message. The Tunnel Endpoint Identifier delivered to the xGGSN indicates the reserved “not allocated” value for the traffic path as the RAB is not yet established and no tunnel endpoint is allocated at the RAN. 5-12) as described in 23.060 13) If the UE has send the Service Request and when the cSGSN received the IP address(es) and the TEID(s) from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, RAN TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and xGGSN is established.
997ad2510cb826711e63f644e1d2617f
23.873
7.3.6.2 Inter SGSN Change
The difference compared with 3GPP R99 is, that the Update PDP Context in step 8) indicates to the xGGSN the reserved “not allocated” value for the traffic path as the Iu bearer is not yet allocated at the RAN. In step 20) the xGGSN tunnel endpoints are indicated to the RNC instead of the SGSN tunnel endpoints. Furthermore, for clarification in step 20) the parameters for RAB establishment are described as already specified in R99. Step 21) is additional compared to 3GPP R99 to update the xGGSN with the GTP tunnel IP address and the TEID received from the RAN when the Service Request is initiated which is the same as for the standalone Service Request procedure. Figure 39: GSM to UMTS Inter SGSN Change 1) The UE or BSS or UTRAN decides to perform an intersystem change, which makes the UE switch to a new cell that supports UMTS radio technology, and stops transmission to the network. 2) The UE sends a Routeing Area Update Request (P‑TMSI, old RAI, old P‑TMSI Signature, Update Type, CM) message to the new cSGSN. Update Type shall indicate RA update or combined RA / LA update, or, if the UE wants to perform an IMSI attach, combined RA / LA update with IMSI attach requested. The SRNC shall add the Routeing Area Identity including the RAC and LAC of the area where the UE is located before forwarding the message to the cSGSN. This RA identity corresponds to the RAI in the MM system information sent by the SRNC to the UE. 3) The new cSGSN uses the old RAI received from the UE to derive the old 2G‑SGSN address, and sends an SGSN Context Request (old RAI, old P‑TMSI, New SGSN Address) message to the 2G‑SGSN to get the MM and PDP contexts for the MS. The old 2G‑SGSN starts a timer and stops the transmission of N‑PDUs to the UE. 4) The old 2G‑SGSN responds with an SGSN Context Response (MM Context, PDP Contexts) message. Each PDP Context includes the GTP sequence number for the next downlink N‑PDU to be sent to the UE and the GTP sequence number for the next uplink N‑PDU to be tunnelled to the GGSN. Each PDP Context also includes the SNDCP Send N‑PDU Number for the next downlink N‑PDU to be sent in acknowledged mode to the UE and the SNDCP Receive N‑PDU Number for the next uplink N‑PDU to be received in acknowledged mode from the UE. The new cSGSN shall use the GTP sequence numbers for in-sequence delivery over the Iu interface. 5) Security functions may be executed. 6) The new cSGSN sends an SGSN Context Acknowledge message to the old 2G‑SGSN. This informs the old 2G‑SGSN that the new 3G‑SGSN is ready to receive data packets belonging to the activated PDP contexts. The old SGSN marks in its context that the MSC/VLR association and the information in the GGSNs and the HLR are invalid. This triggers the MSC/VLR, the GGSNs, and the HLR to be updated if the UE initiates a routeing area update procedure back to the old SGSN before completing the ongoing routeing area update procedure. 7) The old 2G‑SGSN duplicates the buffered N‑PDUs and starts tunnelling them to the new cSGSN. Additional N‑PDUs received from the GGSN before the timer described in step 3 expires are also duplicated and tunnelled to the new cSGSN. No N‑PDUs shall be forwarded to the new cSGSN after expiry of the timer described in step 3. 8) The new cSGSN sends an Update PDP Context Request (new SGSN Address, TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and return an Update PDP Context Response (TEID) message. The Tunnel Endpoint Identifier delivered to the xGGSN indicates the reserved “not allocated” value for the traffic path as the RAB is not yet established and no tunnel endpoint is allocated at the RAN. 9) The new cSGSN informs the HLR of the change of SGSN by sending an Update GPRS Location (SGSN Number, SGSN Address, IMSI) message to the HLR. 10) The HLR sends a Cancel Location (IMSI, Cancellation Type) message to the old 2G‑SGSN. The old 2G‑SGSN removes the MM and PDP contexts if the timer described in step 3 is not running. If the timer is running the MM and PDP contexts are removed when the timer expires. The old 2G‑SGSN acknowledges with a Cancel Location Ack (IMSI) message. 11) The HLR sends an Insert Subscriber Data (IMSI, GPRS Subscription Data) message to the new cSGSN. The cSGSN constructs an MM context for the UE and returns an Insert Subscriber Data Ack (IMSI) message to the HLR. 12) The HLR acknowledges the Update GPRS Location by returning an Update GPRS Location Ack (IMSI) message to the new cSGSN. 13) If the association has to be established, if Update Type indicates combined RA / LA update with IMSI attach requested, or if the LA changed with the routeing area update, then the new SGSN sends a Location Update Request (new LAI, IMSI, SGSN Number, Location Update Type) to the VLR. Location Update Type shall indicate IMSI attach if Update Type in step 1 indicated combined RA / LA update with IMSI attach requested. Otherwise, Location Update Type shall indicate normal location update. The VLR number is translated from the RAI by the cSGSN. The cSGSN starts the location update procedure towards the new MSC/VLR upon receipt of the first Insert Subscriber Data message from the HLR in step 12). The VLR creates or updates the association with the cSGSN by storing SGSN Number. 14) If the subscriber data in the VLR is marked as not confirmed by the HLR, the new VLR informs the HLR. The HLR cancels the old VLR and inserts subscriber data in the new VLR (this signalling is not modified from existing GSM signalling and is included here for illustrative purposes): a) The new VLR sends an Update Location (new VLR) to the HLR. b) The HLR cancels the data in the old VLR by sending Cancel Location (IMSI) to the old VLR. c) The old VLR acknowledges with Cancel Location Ack (IMSI). d) The HLR sends Insert Subscriber Data (IMSI, GSM subscriber data) to the new VLR. e) The new VLR acknowledges with Insert Subscriber Data Ack (IMSI). f) The HLR responds with Update Location Ack (IMSI) to the new VLR. 15) The new VLR allocates a new TMSI and responds with Location Update Accept (VLR TMSI) to the cSGSN. VLR TMSI is optional if the VLR has not changed. 16) The new cSGSN validate the MS’s presence in the new RA. If due to roaming restrictions the UE is not allowed to be attached in the cSGSN, or if subscription checking fails, then the new cSGSN rejects the routeing area update with an appropriate cause. If all checks are successful then the new cSGSN constructs MM and PDP contexts for the MS. The new cSGSN responds to the UE with a Routeing Area Update Accept (P‑TMSI, P‑TMSI signature ) message. 17) The UE acknowledges the new P‑TMSI by returning a Routeing Area Update Complete message to the cSGSN. 18) The new cSGSN sends TMSI Reallocation Complete message to the new VLR if the VLR TMSI is confirmed by the MS. 19) If the UE was in GPRS MM state READY it sends a Service Request (P‑TMSI, RAI, CKSN, Service Type) message to the cSGSN. Service Type specifies the requested service. Service Type shall indicate one of the following: Data or Signalling. 20) If the UE has send the Service Request the new cSGSN requests the SRNS to establish a radio access bearer by sending a RAB Assignment Request (RAB ID(s), QoS Profile(s), GTP‑SNDs, GTP‑SNUs, PDCP‑SNUs) message to the SRNS. For each RAB requested to be established, the RABs to be setup information elements shall contain information such as RAB ID, RAB parameters, Transport Layer Address, and Iu Transport Association. The RAB ID information element contains the NSAPI value, and the RAB parameters information element gives the QoS profile. The Transport Layer Address is the xGGSN Address for user data, and the Iu Transport Association corresponds to Tunnel Endpoint Identifier Data allocated by the xGGSN. The PDCP sequence numbers shall be derived from the N‑PDU sequence numbers stored in the PDP contexts. The SRNS sends a Radio Bearer Setup Request (PDCP‑SNUs) message to the UE. The UE responds with a Radio Bearer Setup Complete (PDCP‑SNDs) message. The SRNS responds with a RAB Assignment Response message. The cSGSN sends N-PDUs tunnelled from the old SGSN to the SRNS. The SRNS shall discard all N‑PDUs tunnelled from the SGSN with N‑PDU sequence numbers older than the PDCP‑SNDs received from the MS. Other N‑PDUs shall be transmitted to the MS. The UE shall discard all N‑PDUs with sequence numbers older than the PDCP‑SNUs received from the SRNS. Other N‑PDUs shall be transmitted to the SRNS. 21) If the UE has send the Service Request and when the cSGSN received the IP address(es) and the TEID(s) from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, RAN TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and xGGSN is established. NOTE: The NSAPI value is carried in the RAB ID IE. For an UE with GPRS‑CSI defined, CAMEL interaction may be performed, see referenced procedures in 3G TS 23.078: C1) CAMEL-GPRS-SGSN-Context-Acknowledge. C2) CAMEL-GPRS-Routeing-Area-Update-Session. C3) CAMEL-GPRS-Routeing-Area-Update-Context.
997ad2510cb826711e63f644e1d2617f
23.873
7.4 Session Management
The procedures are for packet bearer using a GGSN in the visited network with a 3G RAN, i.e. for the cSGSN / xGGSN architecture of the One Tunnel Approach. For all other bearer services or 2G RAN the R99 procedures and the SGSN / GGSN as specified in TS 23.060 apply. Modifications compared with 3GPP R99 are in italic.
997ad2510cb826711e63f644e1d2617f
23.873
7.4.1 PDP Context Activation Procedure
For better comparison with the 3GPP R99 PDP context activation procedure all PDP parameter checks and descriptions are included in the description, although the procedure applies only for bearer services using a GGSN in the visited network. The difference compared with 3GPP R99 is the creation of the PDP context on the xGGSN before the RAB setup. And this PDP context creation on the xGGSN in step 2) indicates the reserved “not allocated” value for the traffic path as the Iu bearer is not yet allocated at the RAN. Furthermore, CAMEL information is indicated if applicable for that context. Step 5) is additional compared to 3GPP R99 to update the xGGSN with the GTP tunnel IP address and the TEID received from the RAN. Figure 40: PDP Context Activation Procedure 1) The UE sends an Activate PDP Context Request (NSAPI, TI, PDP Type, PDP Address, Access Point Name, QoS Requested, PDP Configuration Options) message to the cSGSN. The UE shall use PDP Address to indicate whether it requires the use of a static PDP address or whether it requires the use of a dynamic PDP address. The UE shall leave PDP Address empty to request a dynamic PDP address. The UE may use Access Point Name to select a reference point to a certain external network and/or to select a service. Access Point Name is a logical name referring to the external packet data network and/or to a service that the subscriber wishes to connect to. QoS Requested indicates the desired QoS profile. PDP Configuration Options may be used to request optional PDP parameters from the xGGSN (see GSM 09.60). PDP Configuration Options is sent transparently through the cSGSN. 2) The cSGSN validates the Activate PDP Context Request using PDP Type (optional), PDP Address (optional), and Access Point Name (optional) provided by the UE and the PDP context subscription records. The validation criteria, the APN selection criteria, and the mapping from APN to a xGGSN are described in annex A. If no xGGSN address can be derived or if the cSGSN has determined that the Activate PDP Context Request is not valid according to the rules described in annex A, then the cSGSN rejects the PDP context activation request. If a xGGSN address can be derived, the cSGSN creates a TEID for the requested PDP context. If the UE requests a dynamic address, then the cSGSN lets a xGGSN allocate the dynamic address. The cSGSN may restrict the requested QoS attributes given its capabilities, the current load, and the subscribed QoS profile. The cSGSN sends a Create PDP Context Request (PDP Type, PDP Address, Access Point Name, QoS Negotiated, TEID, NSAPI, UEISDN, Selection Mode, Charging Characteristics, Trace Reference, Trace Type, Trigger Id, OMC Identity, PDP Configuration Options) message to the affected xGGSN. Access Point Name shall be the APN Network Identifier of the APN selected according to the procedure described in annex A. PDP Address shall be empty if a dynamic address is requested. The xGGSN may use Access Point Name to find an external network and optionally to activate a service for this APN. Selection Mode indicates whether a subscribed APN was selected, or whether a non-subscribed APN sent by UE or a non-subscribed APN chosen by cSGSN was selected. Selection Mode is set according to annex A. The xGGSN may use Selection Mode when deciding whether to accept or reject the PDP context activation. For example, if an APN requires subscription, then the xGGSN is configured to accept only the PDP context activation that requests a subscribed APN as indicated by the cSGSN with Selection Mode. Charging Characteristics indicates which kind of charging the PDP context is liable for. The cSGSN shall derive Charging Characteristics from Subscribed Charging Characteristics and/or PDP context Charging Characteristics if received from the HLR as follows: if a “PDP context Charging Characteristics” is present for this PDP context, it shall be sent; otherwise if a “Subscribed Charging Characteristics” is present for this subscriber it shall be sent. If neither “PDP context Charging Characteristics” nor a “Subscribed Charging Characteristics” is present, the cSGSN may choose a default Charging Characteristics which would be sent to the xGGSN, and used there as well. The Charging Characteristics sent to the xGGSN shall also include an indication whether it was retrieved from subscription data received from the HLR or is a default profile determined by the cSGSN.The cSGSN shall include Trace Reference, Trace Type, Trigger Id, and OMC Identity if xGGSN trace is activated. The cSGSN shall copy Trace Reference, Trace Type, and OMC Identity from the trace information received from the HLR or OMC. The Tunnel Endpoint Identifier indicate the reserved “not allocated” value for the traffic path as the Iu bearer is not yet allocated at the RAN. If CAMEL prepaid is applicable the CAMEL characteristics and a prepaid budget are sent to the xGGSN. The xGGSN creates a new entry in its PDP context table and generates a Charging Id. The new entry allows the xGGSN to route PDP PDUs between the cSGSN and the external PDP network, and to start charging. When the Charging Characteristics sent by the cSGSN have been determined by the cSGSN (not retrieved from HLR subscription data), the xGGSN may choose to ignore this. The charging characteristics on the GPRS subscription and individually subscribed APNs are specified in 3G TS 32.015. The xGGSN then returns a Create PDP Context Response (TEID, PDP Address, PDP Configuration Options, QoS Negotiated, Charging Id, Cause) message to the cSGSN. PDP Address is included if the xGGSN allocated a PDP address. If the xGGSN has been configured by the operator to use External PDN Address Allocation for the requested APN, then PDP Address shall be set to 0.0.0.0, indicating that the PDP address shall be negotiated by the UE with the external PDN after completion of the PDP Context Activation procedure. The xGGSN shall relay, modify and monitor these negotiations as long as the PDP context is in ACTIVE state, and use the xGGSN-Initiated PDP Context Modification procedure to transfer the currently-used PDP address to the cSGSN and the UE. PDP Configuration Options contain optional PDP parameters that the xGGSN may transfer to the UE. These optional PDP parameters may be requested by the UE in the Activate PDP Context Request message, or may be sent unsolicited by the xGGSN. PDP Configuration Options is sent transparently through the cSGSN. The Create PDP Context messages are sent over the backbone network. If QoS Negotiated received from the cSGSN is incompatible with the PDP context being activated, then the xGGSN rejects the Create PDP Context Request message. The compatible QoS profiles are configured by the xGGSN operator. 3) RAB setup is done by the RAB Assignment procedure, see subclause “RAB Assignment Procedure” in TS 23.060. 4) If BSS trace is activated, then the cSGSN shall send an Invoke Trace (Trace Reference, Trace Type, Trigger Id, OMC Identity) message to the BSS or RAN. Trace Reference, and Trace Type are copied from the trace information received from the HLR or OMC. 5) Having received the IP address and the TEID from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, TEID, QoS Negotiated) message to the xGGSN. The xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and the xGGSN is established. 6) The cSGSN inserts the NSAPI along with the xGGSN address in its PDP context. If the UE has requested a dynamic address, the PDP address received from the xGGSN is inserted in the PDP context. The cSGSN selects Radio Priority and Packet Flow Id based on QoS Negotiated, and returns an Activate PDP Context Accept (PDP Type, PDP Address, TI, QoS Negotiated, Radio Priority, Packet Flow Id, PDP Configuration Options) message to the UE. The cSGSN is now able to route PDP PDUs between the xGGSN and the UE, and to start charging. For an UE with GPRS‑CSI defined, CAMEL interaction may be performed, see referenced procedures in 3G TS 23.078: C1) CAMEL-GPRS-Activate-PDP-Context. C2) CAMEL-GPRS-SGSN-Create-PDP-Context.
997ad2510cb826711e63f644e1d2617f
23.873
7.4.2 Secondary PDP Context Activation Procedure
The Secondary PDP Context Activation procedure may only be initiated after a PDP context is already activated for the same PDP address and APN. The procedure is illustrated in figure 41. The difference compared with 3GPP R99 is the creation of the PDP context on the xGGSN before the RAB setup. And this PDP context creation on the xGGSN in step 2) indicates the reserved “not allocated” value for the traffic path as the Iu bearer is not yet allocated at the RAN. Step 4) is additional compared to 3GPP R99 to update the xGGSN with the GTP tunnel IP address and the TEID received from the RAN. Figure 41: Secondary PDP Context Activation Procedure for UMTS 1) The UE sends an Activate Secondary PDP Context Request (Linked TI, NSAPI, TI, QoS Requested, TFT) message to the cSGSN. Linked TI indicates the TI value assigned to any one of the already activated PDP contexts for this PDP address and APN. QoS Requested indicates the desired QoS profile. TFT is sent transparently through the cSGSN to the xGGSN to enable packet classification for downlink data transfer. TI and NSAPI contain values not used by any other activated PDP context. 2) The cSGSN validates the Activate Secondary PDP Context Request using the TI indicated by Linked TI. The same xGGSN address is used by the cSGSN as for the already-activated PDP context(s) for that TI and PDP address. The cSGSN and xGGSN may restrict and negotiate the requested QoS as specified in subclause “PDP Context Activation Procedure”. The cSGSN sends a Create PDP Context Request (QoS Negotiated, TEID, NSAPI, Primary NSAPI, TFT) message to the affected xGGSN. Primary NSAPI indicates the NSAPI value assigned to any one of the already activated PDP contexts for this PDP address and APN. TFT is included only if received in the Activate Secondary PDP Context Request message. The xGGSN uses the same external network as used by the already-activated PDP context(s) for that PDP address, generates a new entry in its PDP context table, and stores the TFT. The new entry allows the xGGSN to route PDP PDUs via different GTP tunnels between the cSGSN and the external PDP network. The xGGSN returns a Create PDP Context Response (TEID, QoS Negotiated, Cause) message to the cSGSN. The Tunnel Endpoint Identifier 73ignallin to the xGGSN indicates the reserved “not allocated” value for the traffic path as the RAB is not yet established and no tunnel endpoint is allocated at the RAN. 3) RAB setup is done by the RAB Assignment procedure. 4) Having received the IP address and the TEID from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, TEID, QoS Negotiated) message to the xGGSN. The xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and the xGGSN is established. 5) The cSGSN selects Radio Priority and Packet Flow Id based on QoS Negotiated, and returns an Activate Secondary PDP Context Accept (TI, QoS Negotiated, Radio Priority, Packet Flow Id) message to the UE. The cSGSN is now able to route PDP PDUs between the xGGSN and the UE via different GTP tunnels and possibly different LLC links.
997ad2510cb826711e63f644e1d2617f
23.873
7.4.3 Iu Release Procedure
The RAN initiates an Iu release procedure to release all RABs of an UE and the Iu connection. The Iu Release procedure is illustrated in figure 42. The difference compared with 3GPP R99 is the additional step 2) informing the xGGSN, that the transport tunnel endpoint at the RAN is no more allocated. Figure 42: Iu Release Procedure 1) RAN sends an Iu Release Request (Cause) message to the cSGSN. 2) The cSGSN sends an Update PDP Context Request (RAN Address, TEID, QoS Negotiated) message to each xGGSN concerned. The Tunnel Endpoint Identifier indicate the reserved “not allocated” value for the traffic path as the Iu bearer is not allocated at the RAN. Each xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel endpoint at the xGGSN remains allocated. The cSGSN holds the information about the xGGSN tunnel endpoints. 3) The cSGSN sends an Iu Release Command (Cause) message to RAN. 4) The RRC connection is released if still existing. 5) RAN confirms the Iu release by sending an Iu Release Complete (For each released RAB: RAB ID, GTP SND, GTP SNU) message to cSGSN. GTP SND and GTP SNU enable the cSGSN to restore the values in case the PDP context is maintained and the RAB is re-established at a later stage.
997ad2510cb826711e63f644e1d2617f
23.873
7.4.4 Service Request Initiated by UE Procedure
The UE in PMM‑IDLE state sends the Service Request message to the cSGSN in order to establish the PS signalling connection for the upper layer signalling or for the resource reservation for active PDP context(s). This procedure is also used by an UE in PMM‑CONNECTED state to request the resource reservation for the active PDP contexts. The differences compared with 3GPP R99 are the delivery of the xGGSN tunnel parameter instead of the SGSN parameters in step 3) to the RAN and the additional step 4) informing the xGGSN, that the transport tunnel endpoint at the RAN is re-established. Figure 43: Service Request Initiated by UE Procedure 1) The UE sends a Service Request (P‑TMSI, RAI, CKSN, Service Type) message to the cSGSN. Service Type specifies the requested service. Service Type shall indicate one of the following: Data or Signalling. At this point, the cSGSN may perform the authentication procedure. If Service Type indicates Data then a signalling connection is established between the UE and the cSGSN, and resources for active PDP context(s) are allocated, i.e., RAB establishment for the activated PDP context(s). If Service Type indicates Signalling then the signalling connection is established between the UE and the cSGSN for sending upper-layer signalling messages, e.g., Activate PDP Context Request. The resources for active PDP context(s) are not allocated. 2) The cSGSN shall perform the security functions if the service request was initiated by an UE in PMM‑IDLE state. 3) In case Service Type indicates Data, the cSGSN sends a Radio Access Bearer Assignment Request (NSAPIRAB ID(s), xGGSN TEID(s), QoS Profile(s), xGGSN IP Address(es)) message to re-establish radio access bearer for every activated PDP context. The xGGSN tunnel endpoint parameters are held by the cSGSN also when the Iu is released. 4) Having received the IP address(es) and the TEID(s) from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, RAN TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and xGGSN is re-established. 5) The UE sends the uplink packet.
997ad2510cb826711e63f644e1d2617f
23.873
7.4.5 Service Request Initiated by Network Procedure
When the xGGSN receives a downlink packet for a PDP context with a not allocated GTP tunnel (UE in PMM‑IDLE state), the xGGSN notifies the cSGSN. This initiates a paging request to trigger the Service Request procedure in the UE. Compared with 3GPP R99 the GTP tunnel at the xGGSN is not established after Iu release. Therefore, the reception of a downlink PDU at the xGGSN triggers the PDU Notification Procedure to request the re-establishment of the RAB(s). Furthermore, after RAB establishment the xGGSN has to be updated before being able to transfer downlink PDUs. These are the additional steps 2) and 7) compared with 3GPP R99. Figure 44: Service Request Initiated by Network Procedure 1) The xGGSN receives a downlink PDP PDU for an UE in PMM‑IDLE state. 2) The xGGSN sends a PDU Notification Request message to the cSGSN related to the PDP context. The cSGSN returns a PDU Notification Response (Cause) message to the xGGSN in order to acknowledge that it shall request the UE to re-activate the PDP context(s). 3) The cSGSN sends a Paging message to the RNC. The RNC pages the UE by sending a Paging message to the UE. See subclause “PS Paging Initiated by 3G‑SGSN without RRC Connection for CS” in TS 23.060 for details. 4) The UE sends a Service Request (P‑TMSI, RAI, CKSN, Service Type) message to the cSGSN. Service Type specifies Paging Response. The Service Request is carried over the radio in an RRC Direct Transfer message and over the Iu interface in the RANAP Initial UE message. At this point, the cSGSN may perform the authentication procedure. The cSGSN knows whether the downlink packet requires RAB establishment (e.g., downlink PDU) or not (e.g., Request PDP Context Activation or MT SMS). 5) The cSGSN shall perform the security mode procedure. 6) If resources for the PDP contexts are to be re-established, the cSGSN sends a Radio Access Bearer Assignment Request (RAB ID(s), xGGSN TEID(s), QoS Profile(s), xGGSN IP Address(es)) message to the RNC. The RNC sends a Radio Bearer Setup (RAB ID(s)) to the UE. The UE responds by returning a Radio Bearer Setup Complete message to the RNC. The RNC sends a Radio Access Bearer Assignment Response (RAB ID(s), TEID(s), RNC IP Address(es)) message to the cSGSN in order to indicate that GTP tunnels are established on the Iu interface and radio access bearers are established between the RNC and the UE. If the RNC returns a Radio Access Bearer Assignment Response message with a cause indicating that the requested QoS profile(s) can not be provided, e.g., “Requested Maximum Bit Rate not Available”, then the cSGSN may send a new Radio Access Bearer Assignment Request message with different QoS profile(s). The number of re-attempts, if any, as well as how the new QoS profile(s) values are determined is implementation dependent. 7) Having received the IP address(es) and the TEID(s) from the RAN the cSGSN sends an Update PDP Context Request (RAN Address, RAN TEID, QoS Negotiated) message to each xGGSN concerned. Each xGGSN updates its PDP context fields and returns an Update PDP Context Response (TEID) message. The tunnel between RAN and the xGGSN is re-established. 8) The xGGSN sends the downlink packet.
997ad2510cb826711e63f644e1d2617f
23.873
7.5 Charging
There are three different types of charging information which are collected by the SGSN and/or the GGSN: Mobility Management information, SMS information and PDP context information. In the One Tunnel Approach the cSGSN doesn’t collect the data volume for charging purposes. The charging functionality for Mobility Management information and for SMS remain unchanged on cSGSN. Only the xGGSN collects data volume information. It follows that data volume information is included only in the G-CDRs (GGSN-CDR). The S-CDRs (SGSN-CDR) doesn’t contain any data volume information despite the unsuccessfully transmitted DL data volume reported by the RNC which is sent in separated S-CDRs by the cSGSN as specified in 3GPP R99. If it is necessary to establish two tunnels, then the cSGSN performs also data volume charging functionality. In order to enable location dependent charging the cSGSN forwards location information sent by the RNC to the xGGSN. The Location Report procedure (see above) shall be used. The xGGSN includes this information into the G-CDRs. The expected signalling traffic with location information does not increase the overall signalling considerably as otherwise this would impact the Iu signalling too.
997ad2510cb826711e63f644e1d2617f
23.873
7.6 CAMEL Considerations
In the One Tunnel Approach the data traffic passes only the xGGSN. Therefore volume dependent CAMEL functionality is performed by the xGGSN. All other CAMEL functionality remains in the cSGSN. In the following, two aspects are described where the xGGSN is involved. The first one is the subscription change during established PDP context and second one is CAMEL prepaid.
997ad2510cb826711e63f644e1d2617f
23.873
7.6.1 Subscription Change during Established PDP Context
If due to subscription change, the SCP needs to get control on PDP contexts that were established using the One Tunnel approach, then the cSGSN activates all required functionality when the subscription change is signalled by the HLR. If CAMEL prepaid applies the cSGSN sends an Update PDP Context to the xGGSN including the CAMEL information and the prepaid budget which starts the prepaid functionality on the xGGSN.
997ad2510cb826711e63f644e1d2617f
23.873
7.6.2 CAMEL Prepaid
In the One Tunnel Approach the data traffic passes only the xGGSN. Therefore volume dependent CAMEL prepaid is performed by the xGGSN. The cSGSN sends by means of the Create PDP Context Request message the prepaid budget for the required context to the xGGSN. Also during an inter cSGSN change the prepaid budget will be transmitted to the xGGSN inside the Update PDP Context Request message. If it is necessary to establish two tunnels, then the cSGSN performs also CAMEL prepaid functionality. A dedicated procedure is introduced for requesting new budget or giving back unused budget. Between cSGSN and SCP the Apply Charging Report GPRS procedure is used as specified in R99. The following figure describes the procedure. Figure 45: CAMEL prepaid reporting procedure 1) The xGGSN detects that the budget given by the SCP expires or budget has to given back. The xGGSN creates a Charging Report Request message and send it to the cSGSN. 2) The cSGSN forwards this message to the SCP. The SCP evaluates the request and answers with new budget (2a) or acknowledges returned budget (2b). 3) The cSGSN forwards the response of the SCP to the xGGSN.
997ad2510cb826711e63f644e1d2617f
23.873
7.7 Lawful Interception
3G TS 33.107 describes the architecture and functional requirements for interception for a 3rd generation mobile communication system. The specification applies to both SGSN and GGSN. There is only one difference interception at the GGSN is a national option which means in fact a GGSN is enabled for interception if an manufacturer does not implement two different GGSNs. The One Tunnel Approach requires that interception in the xGGSN is mandatory because the data traffic passes only the xGGSN. So only the xGGSN will deliver the Content of Communication. The Interception Related Information will be sent as currently defined by cSGSN and xGGSN. If it is necessary to establish two tunnels, then the cSGSN provides the functionality of delivery of the Content of Communication. In order to enable Location Dependent Interception the cSGSN forwards location information sent by the RNC to the xGGSN. The Location Report procedure (see above) shall be used.
997ad2510cb826711e63f644e1d2617f
23.873
7.8 QoS Considerations
The removal of one GPRS specific node from the data path by the One Tunnel Approach improves the packet bearer QoS by reducing the packet transfer delay. If two tunnels are established then the SGSN has to perform the following functions: - IP/UDP termination - GTP termination, - look up for the corresponding PDP context, - charging, possibly CAMEL, - possibly interception, - queueing and handling for QoS, - GTP encapsulation, - UDP/IP handling. This has to be done for each packet. Implementations may perform charging, interception and CAMEL functionality somehow in parallel. All transport stack related functions have to be performed sequential. The overall delay is reduced by the delay induced by these functions. Compared to the R99 approach the one tunnel approach the GGSN has to perform additionally only the CAMEL prepaid functionality. For charging purposes, a R99 GGSN counts transferred octets, which can be utilised for CAMEL prepaid. Interception is already a national option. As stated above such functions may be performed in parallel to the transport functionality. Therefore, with regard to the removal of SGSN functionality no additional transport functionality is introduced into the GGSN and therefore also no additional delay. Potential delay caused by processing capacity required for CAMEL or interception depends strongly on the implementation and can therefore not be estimated here. All together the overall delay is at least reduced by the time needed to perform all transport stack functionality in the SGSN. The reduction is strongly dependent on the implementation and therefore cannot be estimated here.
997ad2510cb826711e63f644e1d2617f
23.873
7.9 Security
997ad2510cb826711e63f644e1d2617f
23.873
7.10 O&M
997ad2510cb826711e63f644e1d2617f
23.873
7.11 RAN Considerations (e.g. GERAN)
The One Tunnel Approach is applicable for any RAN with separated transport and control at the interface to the core network, i.e. for UTRAN and the Iu enabled part of the GERAN. The One Tunnel Approach has no impact on the RAN.
997ad2510cb826711e63f644e1d2617f
23.873
7.12 Abnormal Cases
997ad2510cb826711e63f644e1d2617f
23.873
7.13 Compatibility
997ad2510cb826711e63f644e1d2617f
23.873
7.14 Benefits and Drawbacks
The benefits and drawbacks are compared to the R’99 architecture, unless otherwise specified. Benefits: - Removes the SGSN from the user data path when this is possible (NB, it is expected to apply for most of the cases). The delay that the packets experience in the UMTS network is then decreased by bypassing the SGSN and by using optimal IP routing between the RNC and the GGSN. - No SGSN capacity upgrades needed when traffic per user increases, dependent on the proportion of the PDP contexts activated with one user plane tunnel (NB, it is expected to apply for most of the cases). - Charging dependent on PLMN internal or external traffic possible for CAMEL prepaid - Can be achieved by software upgrade alone Drawbacks: - Not always applicable, i.e. not in case of 2G radio and when GGSN is not in the visited PLMN and also not in case of interworking with R97-R99 SGSNs and GGSNs - The national option of legal interception on GGSN is mandatory in this approach - Some additional control plane functionality embedded in the SGSN and GGSN, and this means increased standardisation and implementation (the changes are due to CAMEL prepaid, location information and in case of the GGSN the network initiated service request, and the SGSN and GGSN also need updates to support the other procedures listed under the ‘Increased signalling’ bullet). - More vendor interoperability testing for RNC to GGSN interface is required. - Increases signalling (location information, prepaid budget, CAMEL volume collection, PDP context activation, PDP context modification, Iu Release, Service Request, intersystem change, suspend and resume) - Enhancements to GTP-C are needed - As the GGSN has a direct interface with the SRNC, at intra cSGSN SRNS relocation, the GGSN is impacted (need to be given the new RNC address), which is not the case of the current architecture. The additional GGSN update traffic depends on the degree of user mobility and on the RNC size (if RNC area equal to SGSN area the update traffic does not change) - The cSGSN node still has to contain the whole R99 SGSN functionality, including transport, to support the traffic cases that require two user plane tunnels and in addition the new functionality to handle the one tunnel case. This increases the complexity of the node compared to a R99 SGSN. - Increases the time needed for signalling for some CAMEL based services, because there are more entities in the signalling path (i.e. xGGSN – cSGSN– SCP). - Intersystem changes reduce the R99 advantages of co-locating 2G and 3G SGSNs.
997ad2510cb826711e63f644e1d2617f
23.873
7.15 Open Issues
- The actual reduction in delay by bypassing the SGSN in the transport plane is strongly dependent on implementation and can therefore not be exactly estimated here.
997ad2510cb826711e63f644e1d2617f
23.873
8 Summary
997ad2510cb826711e63f644e1d2617f
23.873
8.1 Selection Criteria
This subsection contains an unordered list of selection criteria which will be used as a guideline when the feasibility study makes its recommendation. The selection criterion is divided into two parts. The first refers to specific aims of the Feasibility Study and is included to give a clear indication of the advantages expected from a migration from the R99 architecture. The second part consists of compatibility criteria, which are included to ensure that the selected alternative remains compatible with both present services and features that are required to be supported for future releases.
997ad2510cb826711e63f644e1d2617f
23.873
8.1.1 Aims
- Available in a timely manner (e.g., R4/R5). However, the interactions with a split of call control and user planes, also in UTRAN, need to be taken into consideration to allow comprehensive operator reasoning behind the viability of the split functionality - The chosen approach should make efficient use of the network resources - Can be implemented with minimum changes to other network entities - Can evolve towards further control / transport (e.g. to support split GGSN) - Allow the procurement of control entities and bearer entities from different vendors - Reference points carrying signalling messages (e.g., Mp) shall not reduce the capabilities for the bearer entities to provide the equivalent QoS as present in the combined SGSN - Efficient support, in terms of QoS, of future users of the packet bearers, e.g. the IP multimedia subsystem
997ad2510cb826711e63f644e1d2617f
23.873
8.1.2 Compatibility criteria
- Can be introduced into an existing network in a phased manner, i.e. can co-exist and inter-operate with non-split elements of the same type. - Applicable for both pre-pay and subscription subscribers - Applicable for both roaming and non-roaming subscribers - Should not preclude the use of Mobile IP, both v4 and v6, in the future. - Selected alternative will result in stability for the network architecture, thus minimizing standards churn. - Can support all related regulatory functions, i.e. Lawful Interception.
997ad2510cb826711e63f644e1d2617f
23.873
8.2 Assignment of Functions to the Logical Architecture
The following table provides an overview of the functions performed by the different nodes of each alternative. SGSN and GGSN refer to R99 nodes and also to the case where it is not possible to establish one tunnel in alternative 2. NOTE 1: For alternative 2, the SGSN and cSGSN functions on one hand, and the GGSN and xGGSN functions on the other hand, must be implemented by the same physical node in order to support the cases where one tunnel is not applicable. However in most cases it should be possible to establish one tunnel. NOTE 2: In case intra SGSN intersystem change needs to be supported, the 2G-SGSN and the SGSN server must be implemented in the same physical node. However in most cases intra SGSN intersystem change should not be required. Table 2: Mapping of Functions to Logical Architecture Function SGSN cSGSN SGSN-Server PS-MGW GGSN xGGSN Network Control: Authentication and Authorisation X X X Admission Control X X X X X X Session Management X X X X X X PS-MGW Management X X PS-MGW Control X X Charging Event Collection X X X X X Charging Volume Data reporting X Charging Volume Data Counting X X X X Charging Volume Data Collection X X X X CDR generation X X X X X RANAP fair charging reporting X X X Location info reporting for charging X X Location info reporting for LI X X Mobility Event Collection X X X Legal Interception Content of Communication X X O X Legal Interception Related Information X X X O X Forward CAMEL info to xGGSN or PS-MGW X X CAMEL Prepaid X X X X SMS handling X X X Packet Routeing & Transfer: Relay X X X X Routeing X X X X Address Translation and Mapping X X X X Encapsulation X X X X Tunnelling X X X X Per Packet QoS Management X X X X Mobility Management: X X X X X
997ad2510cb826711e63f644e1d2617f
23.873
8.2.1 High-Level Functions Description
997ad2510cb826711e63f644e1d2617f
23.873
8.2.1.1 Network Control Functions
Authentication and Authorisation Function: This function performs the identification and authentication of the service requester, and the validation of the service request type to ensure that the user is authorised to use the particular network services. The authentication function is performed in association with the Mobility Management functions. Admission Control Function: The purpose of admission control is to calculate which network resources are required to provide the quality of service (QoS) requested, determine if those resources are available, and then reserve those resources. Admission control is performed in association with the Radio Resource Management functions in order to estimate the radio resource requirements within each cell. Charging Data Collection Function: This function collects data necessary to support subscription and/or traffic fees. Forward location info: This function relays information delivered by RANAP to the xGGSN or to the PS-MGW to enable location dependent charging or interception. Mobility Event Collection: This function collects all CAMEL events and forwards this information to the SCP. Legal Interception Content of Communication: This function forwards the intercepted traffic to the LEA. Legal Interception Related Information: This function forwards the user mobility events to the LEA. Forward CAMEL info to xGGSN or PS-MGW: This function delivers prepaid budget to the function monitoring the traffic. CAMEL Prepaid: This function monitors the traffic and consumes the budget according to the traffic, prevents further traffic when no more budget is available and returns not consumed budget at release of the session. SMS handling: This function relays SMS between RAN and SMS-GMSC transferred via RANAP or MAP, respectively.
997ad2510cb826711e63f644e1d2617f
23.873
8.2.1.2 Packet Routeing and Transfer Functions
Relay Function: The relay function is the means by which a node forwards data received from one node to the next node in the route. Routeing Function: The routeing function determines the network node to which a message should be forwarded and the underlying service(s) used to reach that GPRS Support Node (GSN), using the destination address of the message. The routeing function selects the transmission path for the “next hop” in the route. Data transmission between GSNs may occur across external data networks that provide their own internal routeing functions, for example X.25 [34], Frame Relay or ATM networks. Address Translation and Mapping Function: Address translation is the conversion of one address to another address of a different type. Address translation may be used to convert an external network protocol address into an internal network address that can be used for routeing packets within and between the PLMN(s). Address mapping is used to map a network address to another network address of the same type for the routeing and relaying of messages within and between the PLMN(s), for example to forward packets from one network node to another. Encapsulation Function: Encapsulation is the addition of address and control information to a data unit for routeing packets within and between the PLMN(s). Decapsulation is the removal of the addressing and control information from a packet to reveal the original data unit. Encapsulation and decapsulation are performed between the support nodes of the packet domain PLMN(s), and between the serving support node and the UE. Tunnelling Function: Tunnelling is the transfer of encapsulated data units within and between the PLMN(s) from the point of encapsulation to the point of decapsulation. A tunnel is a two-way point-to-point path. Only the tunnel endpoints are identified. Per Packet QoS Management: It includes all packet processing to maintain the QoS especially the transfer delay and packet loss ratio within the limits negotiated for each PDP context.
997ad2510cb826711e63f644e1d2617f
23.873
8.2.1.3 Mobility Management Functions
The mobility management functions are used to keep track of the current location of an MS within the PLMN or within another PLMN.
997ad2510cb826711e63f644e1d2617f
23.873
8.3 Comparison of the Overall Functionality
The table below addresses the cases where the respective evolved architectures are applicable. NOTE 1: The split SGSN approach is not applicable when 2G radio is used. NOTE 2: The one tunnel approach is not applicable when 2G radio is used, at inter PLMN scenarios, and when R97-R99 SGSN and/or GGSN is used. Table 3: Comparison of functionality between the two alternatives SGSN server – PS-MGW One Tunnel Mobility Management Existing protocols not impacted. New protocol procedures required are confined to Mp interface. Existing procedures and protocol (GTP) are impacted. New signalling on Gn interface is required. Session Management Existing protocols not impacted. New protocol procedures required are confined to Mp interface. PS-MGW participates in QoS negotiation. Existing procedures and protocol (GTP) are impacted. New signalling on Gn interface is required. Packet Routing and Transfer On PS-MGW and on GGSN On xGGSN PS-MGW Control New standard interface and related node control and management --- Charging On PS-MGW (only counters and cause), on SGSN server and on GGSN On xGGSN, cSGSN (only events) Network control load SGSN server load is higher than R99 SGSN because of additional standard interface CSGSN and xGGSN load is higher than R99 because of additional GTP signalling Network traffic capacity PS-MGW and GGSN capacity to be upgraded with growing user traffic. By having an m:n relationship between servers and PS-MGWs, an increase of the ability to better utilize the total network capacity is achieved, as servers can set up new PDP contexts on a different MGW when resources are scarce on one MGW. As a deployment option, this principle can even be used to share some MGW resources between CS and PS domain. These resources are lower layer protocols and hardware resources (e.g. interface cards), and parts related to the Mp interface, if H.248 is selected. Only xGGSN capacity to be upgraded with growing user traffic CAMEL Events by SGSN server, prepaid budget via SGSN server to PS-MGW Events by cSGSN, prepaid budget via cSGSN to xGGSN Interception Events by SGSN server, data by PS-MGW and as national option GGSN Events by cSGSN or xGGSN, data by xGGSN Location Info For control on SGSN server as in R99, change indicated to PS-MGW for LI For control on cSGSN as in R99, change indicated to xGGSN for LI and for charging Network Management SGSN server, PS-MGW, GGSN. New Mp links have to be managed cSGSN, xGGSN Packet Bearer QoS As in R99 One PS domain specific hop removed – improved delay figures by bypassing the SGSN Migration to the approach SGSN gets new interface which has to be managed, no more traffic functions in the SGSN server; new entity PS-MGW and new protocol introduced. Existing protocols remain unchanged. SGSN and GGSN get some control extensions in addition to the R99 functions; extensions to GTP Recovery, Redundancy, Failure concepts As in R99 and additionally between SGSN server and PS-MGW As in R99
997ad2510cb826711e63f644e1d2617f
23.873
9 Work Plan
SA2#13 May 22-26, 2000 Proposal for a new Work Item. CN/SA2 workshop June 14-15, 2000 Discussion of Work Item responsibilities. SA#8 June 26-28, 2000 Work Item and distribution of responsibilities approved. Drafting session August 22-24 Discussion and selection of alternative architectures to be studied. Start work on each alternative. SA2#14 September 4-8, 2000 Work on the selected architectures. SA#9 September 25-28, 2000 Drafting session October 17-19 Detailed work on the selected architectures. SA2#15 November 13-17, 2000 Detailed work on the selected architectures. Approval by SA2 to present the TR for information to SA. SA#10 December 11-14, 2000 Presentation of the TR to SA for information. SA2#16 January 22-26, 2000 Finalise TR. Select the solution to be presented for approval. SA#11 March 19 – 22, 2001 Presentation of the TR to SA for approval. Annex A (informative): Combined SGSN and GGSN split A.1 Introduction In the PS CN domain the node that comprises the more user and control plane functions is undoubtedly the SGSN. The functional split of SGSN may be the primary target for decomposition. However the GGSN could be also decomposed into a server and a media gateway for smooth migration into R’00 and beyond. This alternative could be proposed as a next step solution of the SGSN split, after whole SGSN split issues are solved. In the proposed architecture, as depicted in the figure A.1, the SGSN and the GGSN are decomposed into the server and the PS media gateway. The functional allocation between SGSN server, GGSN server and PS-MGW can be classified as follows. Functions of the SGSN server: - Session Management - Mobility Management - GTP-C termination - MAP termination - RANAP termination - CDR handling - Provision of Intercept Related Information (Lawful Interception) - Media gateway selection - CAP termination - etc. Functions of the GGSN server: - Session Management - Location Management (for MT call) - GTP-C termination - CDR handling - Media gateway selection - IP Packet control (RADIUS client, DHCP client and so on) - etc. Functions of the PS-MGW: - GTP-U termination - Quality of service provision - Collection of usage information for charging - Reporting of usage information on demand or event to the SGSN server - Provision of Content of Communications (Lawful Interception) - etc. The servers control the PS-MGWs through the Mp interface following the H.248 standard. It is possible, as an operator and/or implementation option, to have a common MGW for the CS and PS CN domains, which allows for an efficient allocation of resources amongst both domains. In this case, the combined MGW may provide PSTN interworking functionality and operated as a MGW to the legacy PSTN for IP multimedia call. The QoS resource allocation on the GGSN side requires further analysis. A.2 Logical Architecture Figure A.1: Evolved logical architecture with GGSN server and PS-MGW NOTE 1: A PS-MGW and associated MGW can be implemented as a single node. (Optional) NOTE 2: The functionality and interfaces of the PS-MGW associated with GGSN may be different from the functionality and the interfaces of the PS-MGW associated with the SGSN. NOTE 3: As an implementation option, to build a 2G+3G SGSN, the 2G-SGSN function may be 87ignalling with the SGSN server function. NOTE 4: The following interfaces are also part of the R00 reference architecture, but are not shown for layout purposes only: - between MSC’s (including MSC server / MGW), E interface; - between VLR’s, G interface; - between SGSN’s, Gn interface; - between CSCF and UE, Gm interface; - between CSCF and PS-MGW, Gi interface; - between MSC (or MSC server) and SGSN, Gs interface (optional). In the proposed architecture, the control path is separated from the user data path, so that each path is split into control and user path; Iu-u, Iu-c, Gn-u, Gn-c, Gp-u, Gp-c and so on. The letter ‘u’ stands for ‘user traffic’ and ‘c’ stands for ‘control plane’. A.2.1 Functional Nodes A.2.1.1 SGSN Server The SGSN server handles all the 88ignalling interfaces of an R’99 SGSN, including the GTP-C protocol on the Gn_c and Gp_c interface and RANAP protocol on the Iu_c interface. It controls the PS-Media Gateway through the Mp interface following the H.248 standard. Split architecture should support GPRS for GSM, but how to interconnect BSS and PS CN still needs further discussions in a sense that control plane and user plane would not be clearly separated on Gb interface. So which node between SGSN server and PS-MGW will be connected to BSS is not determined yet at the moment A.2.1.2 GGSN Server The GGSN server handles all the signalling interfaces of an R’99 GGSN, including the GTP-C protocol on Gn_c and Gp_c interface. It controls the PS-MGW through the Mp interface following the H.248 standard. The GGSN server may act as a DHCP client and RADIUS client with the external IP network. A.2.1.3 Packet Switching – Media Gateway (PS-MGW) The PS-MGW handles the user plane for GPRS. It terminates the GTP-U tunnels from the PS-MGW supervised by SGSN server over Gn_u and Gp_u interface. The PS-MGW is controlled either by the GGSN server or by the SGSN server through the Mp interface following the H.248 standard. The PS-MGW can be combined with a MGW for CS domain, e.g. to allow for dynamic sharing of resources between the PS and CS domain A.2.2 Interfaces Only interfaces, which are newly introduced with splitting the GGSN, are mentioned in this section. Interfaces that are not described here or elsewhere in this TR conform to their definition in the relevant specifications. The protocols GTP-U, GTP-C, RANAP and BSSGP referred to in the following subclauses conform to their current specifications and are not impacted by the decomposition of the SGSN and GGSN. A.2.2.1 GGSN server – PS-MGW(Mp) (Iu Mode Only) The PS-MGW is controlled by the GGSN server through the Mp interface. The Mp interface supports the MeGaCo/H.248 protocol, with GPRS-specific extensions. This interface belongs to the control plane. A.2.2.2 BSS – PS CN (Gb) (Gb Mode Only) With some open issues, the Gb interface needs further discussions, thus it is FFS. A.2.2.3 SGSN server – GGSN server (Gn_c, Gp_c) (Iu Mode Only) In Iu mode, the Gn_c interface between the SGSN server and the GGSN server supports the GTP-C protocol and belongs to the control plane. The Gp_c interface provides the same functionality as the Gn_c interface, except that it applies only when the SGSN server and the GGSN server belong to different PLMNs. A.2.2.4 Inter PS-MGW (Gn_u, Gp_u) (Iu Mode Only) The Gn_u interface between the PS-MGW controlled by SGSN server and the PS-MGW controlled by GGSN server support the GTP-U protocol. This interface belongs to the user plane. The Gp_u interface provides the same functionality as the Gn_u interface, except that it applies only when each PS-MGW belongs to different PLMNs. A.2.2.5 Gn interface for inter SGSN procedures Interfaces related to SGSN intersystem change (UMTS to/from GSM) are FFS. The case where the MS moves between GSM cells served by two different nodes is FFS. When the MS moves between UMTS cells served by two different SGSN servers: - the Gn_c interface between SGSN servers supports the GTP-C protocol. - the Gn_u interface between PS-MGW supports the GTP-U protocol. A.3 Benefits and Drawbacks With the decomposition of the GGSN, additional advantages are possible. - The PS-MGW associated with SGSN and the PS-MGW associated with GGSN could be easily integrated into a single node. - The PS-domain media gateway and the CS-domain media gateway could be integrated for more efficient resource allocation. - With the GGSN split, GGSN server may not be tightly coupled with PS-MGW. Even in the case of a GGSN change, the same GGSN server could control the newly assigned PS-MGW. A.4 Open Issues With the GGSN split, the following issues are to be solved. - Interoperability with GPRS (Gb mode only), including the interaction between the SGSN server (or PS-MGW) and BSS - Decomposition of QoS resource - Handling QoS messages in GGSN, including RSVP signalling - Investigate how to merge PSTN interworking functionality into PS-MGW - Further analysis on GTP-C protocol to be used for Mp interface - Investigate how to support Ipv6 - Decomposition of Mobile IP functionality into GGSN server and PS-MGW - etc Annex B (Informative): Change History Document history V0.0.0 2000-08 Document created V0.1.0 2000-08 Modifications according to drafting meeting in Stockholm, 22-24 August 2000. Documents included: S2S-000015, S2S-000017 and S2S-000019. V0.2.0 2000-09 Modifications according to drafting session in Bristol, 5 September 2000. Documents included: S2S-000033, S2S-000037, S2S-000038, S2S-000042, S2S-000043, S2S-000044 and S2S-000045. V0.3.0 2000-11 Modifications according to drafting meeting in Vancouver, 17-19 October 2000. Documents included: S2S-000051 to S2S-000054, S2S-000059 to S2S-000061, S2S-000066, S2S-000068, S2S-000070, S2S-000074, S2S-000079 to S2S-000083, S2S-000085, S2S-000087 to S2S-000090, S2S-000092, S2S-000094 to S2S-000097, S2S-000099, S2S-000100, S2S-000102 to S2S-000105. V0.4.0 2000-11 Modifications according to drafting session in Makuhari, 14-15 November 2000. Documents included: S2S-000117, S2S-000122, S2S-000128, S2S-000133, S2S-000136, S2S-000138, S2S-000139, S2S-000140, S2S-000143, S2S-000144, S2S-000146, S2S-000147, S2S-000149. V1.0.0 2000-11 No changes as compared to v0.4.0. V1.1.0 2001-01 Modifications according to drafting session in Los Angeles, 24-25 January 2001. Documents included: S2S-000126, S2S-000151, S2S-000153, S2S-000163, S2S-000166 to S2S-000168, S2S-000175, S2S-000178 to S2S-000183, S2S-000186, S2S-000189 to S2S-000192. v.2.0.0 2001-03 Version 2.0.0, same technical content as v.1.1.0 v.4.0.0 2001-04 Version 4.0.0, same technical content as v.2.0.0. Reformatted into 3GPP TR format. Addition of an editorial note in the "forward" section to clarify that the Feasibility Study and this TR are closed.
83726f0f79dd0b5bad7d922a555d137b
25.870
1 Scope
The purpose of the present document is to help the TSG RAN WGs to understand the proposed method and to specify the impacts to existing specifications, which is needed for the introduction of the “Enhancement on the DSCH hard split mode” for Release 5. “Enhancement on the DSCH hard split mode” is proposed to specify the enhancements of TFCI coding and power control in DSCH hard split mode for UTRA FDD. Based on [1], this work item is composed of two work tasks. 1) TFCI coding in DSCH hard split mode 2) TFCI power control in DSCH hard split mode The different WTs will be described in subsequent chapters. It is intended to gather all information in order to trace the history and the status of the WTs in each WG. It describes the proposed methods for each area. It describes the impacts due to this WI. It describes agreed requirements related to the WTs. It identifies the affected specifications according to the introduction of “Enhancement on the DSCH hard split mode”. It also describes the schedule of the WTs.
83726f0f79dd0b5bad7d922a555d137b
25.870
2 References
The following documents contain provisions which, through reference in this text, constitute provisions of the present document. References are either specific (identified by date of publication, edition number, version number, etc.) or non‑specific. For a specific reference, subsequent revisions do not apply. For a non-specific reference, the latest version applies. [1] RP-010205, “Proposed WI Enhancement on the DSCH hard split mode”, approved at RAN#11
83726f0f79dd0b5bad7d922a555d137b
25.870
3 Definitions, symbols and abbreviations
83726f0f79dd0b5bad7d922a555d137b
25.870
3.1 Definitions
For the purposes of the present document, the following terms and definitions apply.
83726f0f79dd0b5bad7d922a555d137b
25.870
3.2 Symbols
83726f0f79dd0b5bad7d922a555d137b
25.870
3.3 Abbreviations
For the purposes of the present document, the following abbreviations apply: TFCI Transport Format Combination Indicator DSCH Downlink Shared Channel
83726f0f79dd0b5bad7d922a555d137b
25.870
4 TFCI coding in DSCH hard split mode
83726f0f79dd0b5bad7d922a555d137b
25.870
4.1 Introduction
In the current Rel99 & Rel’4 specification, as identified by RAN WG’s (WG1, WG2 and WG3), when DSCH scheduling be done in DRNC, logical split cannot be supported over Iur during the DSCH soft handover. Furthermore, hard split has advantage over logical split in the sense that it can be supported over Iur. However, it was also identified that hard split has some limitation and therefore there is some need to study the enhancement for TFCI coding in the DSCH hard split mode Currently DSCH hard split mode can support only 5 bit long DSCH and DCH TFCIs. As a result, the number of TFCI is limited upto 32 for DCH and DSCH in DSCH hard split mode. A new TFCI coding scheme to support the flexible bit length can enhance the DSCH hard split mode. 4.2 Requirements The new TFCI encoding scheme should be an extension of the existing scheme and include the TFCI encoding scheme for non-split mode and 5:5 split mode as a subset. This implies that full backward compatibility to the TFCI encoding and mapping schemes used in R99/Rel-4 must be guaranteed. The requirements on the new TFCI encoding scheme are summarised as follows: • There shall be only one TFCI encoding scheme, both for non-split mode and for flexible/fixed split mode. The new TFCI encoding scheme shall give identical output for non-split mode and 5:5 hard split as in R99/Rel-4. • The mapping of encoded TFCI bits to the bits in the TFCI fields of the physical channel shall not be changed. This implies that 32 bits shall be output from the TFCI encoding process for all hard split combinations. • Reuse of existing encoder structure, i.e. use of the same basis sequences Mi,0 … Mi,9 as in Table 8 of [3]. • The amount of additional hardware, e.g. for storing additional puncturing patterns, shall be minimised. The new scheme must show acceptable performance. 4.3 Proposed TFCI Coding Scheme for the flexible Hard Split mode This section describes the modification of the current TFCI coding scheme to support the flexible code length, and explains the performance, backward compatibility and hardware complexity due to an encoding scheme and an example of decoder structure. The modified TFCI coding scheme is called as “Flexible Hard Split mode TFCI coding scheme (FHS-TFCI)”. In the current specification, (16,5) Bi-Orthogonal Code and (32,10) sub-code of the second order Reed-Muller code are used as TFCI coding schemes. Actually, these coding schemes can be implemented by one encoder and one decoder. This means that (16,5) Bi-Orthogonal Code can be obtained from (32,10) sub-code of the second order Reed-Muller code, by selecting some basis and by puncturing some bits. “Shortening techniques” are used in the consideration of the backward compatibilities. The shortening techniques create a new code by selecting basis and puncture some coded symbols from mother code. `FHS-TFCI using shortening technique has a good performance. Moreover, the difference between the current TFCI coding scheme and the flexible hard split mode TFCI coding scheme (FHS-TFCI) is the number of puncturing patterns. That is, FHS-TFCI can use the current TFCI coder and decoder and requires small memory for storing puncturing patterns. This means that the impact of FHS-TFCI is very small in the viewpoint of hardware. In the following sections, the encoder structure and an example of decoder structure are described in detail. 4.3.1 Effective code rate after mapping of TFCI codeword in normal mode Before describing FHS-TFCI, we consider the coded symbol length relative to TFCI information ratios. The most natural way is to maintain uniform code rate. The current TFCI coding scheme uses (32,l0) codes. However, according to TS 25.212, if TFCI codeword is not repeated, then the effective TFCI code rate after mapping of TFCI codeword in normal mode is 1/3. Consequently, if the effective code rate is maintained as 1/3, then the effective code lengths relative to TFCI information ratios after the codeword mapping in normal mode are as shown in Table 1: Table 1. Effective Code Length for TFCI information ratio For backward compatibility, however, code length at the output of TFCI coder should be maintained as 32 while the sum of the effective code lengths for DCH and DSCH is 30 for each case as shown in Table 1. Thus, in TFCI coding scheme that will be implemented, it is necessary to add 1 bit to the code word for DCH and DSCH, respectively, as shown in Table 2. Table 2. Code length at the TFCI coder output for TFCI information ratio 4.3.2 TFCI encoder structure for flexible hard split mode According to the code length in Table 2, the encoder structure of FHS-TFCI is as shown in figure 1: Fig 1. Encoder Structure In Fig 1, the encoder consists of (32,10) sub-code of the second order Reed-Muller code and a puncturer for each code length. The puncturing pattern and the used basis for each code length are listed in table 3. Code Length Puncturing Pattern Used basis (4,1) 1, 3, 5, 7, 8, 9, 10, 11, 12, 13, 14,15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 M0 (7,2) 3, 7, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 M0, M1 (10,3) 7, 10, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 M0, M1, M2 (13,4) 0, 1, 2, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31 M0, M1, M2, M3 (16,5) (exist already) 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 31 M0, M1, M2, M3, M5 (19,6) 6, 10, 11, 13, 14, 16, 17, 19, 20, 22, 24, 26, 31 M0, M1, M2, M3, M4, M5 (22,7) 8, 12, 16, 18, 19, 23, 26, 27, 30, 31 M0, M1, M2, M3, M4, M6, M7 (25,8) 4, 11, 14, 15, 20, 21, 22 M0, M1, M2, M3, M4, M5, M6, M7 (28,9) 6, 10, 11, 30 M0, M1, M2, M3, M4, M5, M6, M7, M8 (32,10) (exist already) N.A M0, M1, M2, M3, M4, M5, M6, M7, M8, M9 where M0 = 10101010101010110101010101010100 M1 = 01100110011001101100110011001100 M2 = 00011110000111100011110000111100 M3 = 00000001111111100000001111111100 M4 = 00000000000000011111111111111101 M5 = 11111111111111111111111111111111 M6 = 01010000110001111100000111011101 M7 = 00000011100110111011011100011100 M8 = 00010101111100100110110010101100 M9 = 00111000011011101011110101000100 Table 3. Puncturing pattern and used basis 4.3.3 Performance of FHS-TFCI coding scheme In consideration of fig 1 and table 3, (19,6), (22,7), (25,8), and (28,9) encoders are the shortening version of (32,10) sub-code of second order Reed-Muller code, while others have the following basic structure. • (4,1) encoder : 4 time repetition code • (7,2) encoder : Repetition & Puncturing of (3,2) simplex code • (10,3) encoder : Repetition & Puncturing of (7,3) simplex code • (13,4) encoder : Puncturing of (15,4) simplex code As we can see, (4,1), (7,2), (10,3), and (13,4) encoders are based on (2k-1,k) simplex encoder. These codes have an advantage of designing the decoder because IFHT(Inverse Fast Hadamard transform) can be used for decoder. Using IFHT in decoder can reduce H/W complexity. As in the current specification, certain 30 bits of 32-bit output of TFCI coder will be transmitted or 32-bit TFCI codeword will be repeatedly transmitted, according to a mapping rule to map the TFCI codeword to the slots of the radio frame. The mapping rule is FFS. However, to get the optimal (or near optimal) performance in the case that only 30 bits are transmitted in normal mode, FHS-TFCI is designed based on the assumption as follows. In the case that only 30 bits are transmitted, the mapping rule shall satisfy that • The last bit of TFCI codeword for DCH is not transmitted. • The last bit of TFCI codeword for DSCH is not transmitted. It is noted that the above assumption preserves the consistency with the TFCI ratio of (5:5) in split mode operation, which is defined in the current specification. In general, the performance of block code is determined by minimum distance dmin. In the viewpoint of performance, dmin’s of FHS-TFCI for each code length is shown in table 4. TFCI coder output Effective codeword Note Code Length Optimal Bound Dmin Code Length Optimal Bound Dmin (4,1) 4 4 (3,1) 3 3 New (7,2) 4 4 (6,2) 4 4 New (10,3) 5 5 (9,3) 4 4 New (13,4) 6 6 (12,4) 6 6 New (16,5) 8 8 (15,5) 7 7 Already exists (19,6) 8 7 (18,6) 8 7 New (22,7) 8 8 (21,7) 8 8 New (25,8) 9 8 (24,8) 8 8 New (28,9) 10 10 (27,9) 10 9 New (32,10) 12 12 (30,10) 11 10 Already exists Table 4. Performance of FHS-TFCI As shown in Table 4, FHS-TFCI is the optimal code in (3,1), (4,1), (6,2), (7,2), (9,3), (10,3), (12,4), (13,4), (16,5), (15,5), (21,7), (22,7), (28,9), (32,10), and (24,8) cases, while in (18,6), (19,6), (25,8), and (27,9) cases, the performance of FHS-TFCI is very close to the optimal bound. 4.3.4 Decoder There are a lot of decoding methods of block code, e.g., “ Brute-force method”. This section describes an example of the decoder structure according to FHS-TFCI. The decoder structure in this section is only an example and informative. The purpose of this section is to show the possible way for the current TFCI coding scheme and FHS-TFCI to coexist without significant complexity increase. Similar to encoder structure for FHS-TFCI in 4.3.2, the decoding scheme for FHS-TFCI can be implemented by one decoder (which is included in current TFCI coding scheme) regardless of the code length. Furthermore, the decoder of “(32,10) the sub-code of the second order Reed-Muller code” for the current TFCI coding scheme can be reused. The decoder structure is as shown in Fig 3. Fig 3. Decoder Structure The decoder in fig 3 is the decoder of “(32,10) the sub-code of the second order Reed-Muller code” for Rel’99/Rel 4. There is no additional H/W block required for FHS-TFCI and only the code length information is needed for FHS-TFCI. Controller in fig.2 controls the operation of 0 inserter, mask multipliers and IFHT according to code length information. 0 inserter inserts 0 symbols into the received symbols at the puncturing position listed in table 2. Mask multipliers multiplies the received bits by the mask that is generated from mask generator and also used for the current TFCI coding scheme. IFHT performs Inverse Fast Hadamard Transform operation. The number of IFHTs used for FHS-TFCI depends on code length and the maximum number of IFHTs is identical to that of the current TFCI coding scheme in this example. In detail, when the number of information bits is less than or equal to 6 ( k ≤ 6) , no mask-multiplier is used and the one IFHT-the first IFHT- is used. On the other hand, when the number of information bits is over 6 (k > 6), (2k-6-1) mask-multipliers and 2k-6 IFHTs are used. 4.3.5 Complexity Considering the encoder structure, there is no additional block except increasing the memory size for storing the puncturing patterns. The decoder in fig 3 is an example to show FHS-TFCI will not increase the H/W complexity of the current decoder. Thus, in implementing FHS-TFCI, there is no significant increase in complexity, and backward compatibility can be maintained. 4.3.6. Mapping rule of the TFCI Coded symbol 4.3.6.1. Criterion for the Mapping rule In this section, we mention about the criterion for mapping rule. Criterion is as follows : 1) n coded symbols with smaller size is ordered as uniformly as possible. 2) In the normal case(non-compressed mode & SF > 64), out of total 32 symbols, 1bit for DSCH and 1bit for DCH is not transmitted. 3) Have a generalized form to include 5:5 hard split case which is in Rel.99/Rel.4 specification. The first criterion means that the uniform distribution of the transmitted symbol in the time domain guarantee the good time diversity. Actually, when n coded symbols with smaller size are transmitted in the positions uniformly distributed and (32 – n) coded symbols with larger size are transmitted in the other positions, the positions for (32 – n) coded symbols with larger size have also almost uniformly distributed. The second one is for maintaining the code rate 1/3( the code rate 1/3 is the one in non-split mode ) in the normal case(non-compressed mode & SF > 64). 4.3.6.2. Mapping rule In this section, we described about mapping rule based on the criterion as seen in the previous section. We will introduce a formula for calculating the mapping positions. In terms of the criterion, first, the mapping position according to formula is uniformly distributed, and second, the last symbol of the codeword is mapped to the last position in all cases. Before we describing the mapping position, the number of the coded symbol is as the following table 5. TFCIDCH : TFCIDSCH Coded symbol for TFCIDCH Coded symbol for TFCIDSCH 1 : 9 4 28 2 : 8 7 25 3 : 7 10 22 4 : 6 13 19 5 : 5 16 16 6 : 4 19 13 7 : 3 22 10 8 : 2 25 7 9 : 1 28 4 Table 5. The number of coded symbol We introduce the formula for calculating the mapping position uniformly distributed within 32 positions. In case n  16, the formula is as follows : i-th symbol position Pi = (1) ,where {t} = r iff r – 0.5  t < r + 0.5, r is an integer, i = 0,…,n–1. Then, when we decide the mapping position of the n coded symbols of the field with the smaller size by using the above formula, that of the coded symbol with larger size is all other. The formula for this is as follows : i-th symbol position Pi = (2) ,where t is the greatest integer less than or equal to t and i = 0,…, 32 – n – 1. As an example, in 2 : 8 case. 7 mapping positions for TFCIDCH are 4, 8, 13, 17, 22, 26, 31 according to the equation (1). In the other hand, mapping position for TFCIDSCH are the others, say, 0, 1, 2, 3, 5, 6, 7, 9, 10, 11, 12, 14, 15, 16, 18, 19, 20, 21, 23, 24, 25, 27, 28, 29, 30 according to the equation (2). We define d*,i as a output coded symbol after puncturing. Then, the mapping rule into the transmitted TFCI coded symbols is (3) i = 0,1,…, 32 – n – 1, and (4) , i = 0,1,…, n – 1. Actually, this formula is the generalized form of 5:5 case, which is in the current specification. For this, substituting n for 16, , and . Therefore, equation (3) and (4) are the same as 5:5 case in the current specification. 4.4 Specification Impact and associated Change Request 4.4.1 WG1 ========= Start of change in TS 25.212 ====================================
83726f0f79dd0b5bad7d922a555d137b
25.870
4.3.4 Operation of TFCI in Hard Split Mode
If one of the DCH is associated with a DSCH, the TFCI code word may be split in such a way that the code word relevant for TFCI activity indication is not transmitted from every cell. The use of such a functionality shall be indicated by higher layer signalling. The TFCI is encoded by using punctured code of (32,10) sub-code of second order Reed-Muller code. The coding procedure is as shown in figure 10. Figure 10: Channel coding of flexible hard split mode TFCI information bits The code words of the punctured code of (32,10) sub-code of second order Reed-Muller code are linear combinations of basis sequences generated by puncturing 10 basis sequences defined in table 8 in section 4.3.3. The first set of TFCI information bits (a1,0 , a1,1 , a1,2 , a1,3 , …, a1,k-1 where a1,0 is LSB and a1,k-1 is MSB) shall correspond to the TFC index (expressed in unsigned binary form) defined by the RRC layer to reference the TFC of the DCH CCTrCH in the associated DPCH radio frame. The second set of TFCI information bits (a2,0 , a2,1 , a2,2 , a2,3 , .., a2,10-k-1 where a2,0 is LSB and a2,10-k-1 is MSB) shall correspond to the TFC index (expressed in unsigned binary form) defined by the RRC layer to reference the TFC of the associated DSCH CCTrCH in the corresponding PDSCH radio frame. The output code word bits are given by : ; where = 0, …, 3k and = 0, …, 30-3k. Then, the relation between j1 (or j2) and i1 (or i2) is as follows: • If k  5, ; . • If k = 5, ; . The functions , are defined as shown in the following table 9. Table 9. , functions m for i = 0, …, 3m for n = 0,…, m-1 3 0, 1, 2, 3, 4, 5, 6, 8, 9, 11 0, 1, 2 4 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 0, 1, 2, 3 5 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 30 0, 1, 2, 3, 5 6 0, 1, 2, 3, 4, 5, 7, 8, 9, 12, 15, 18, 21, 23, 25, 27, 28, 29, 30 0, 1, 2, 3, 4, 5 7 0, 1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 13, 14, 15, 17, 20, 21, 22, 24, 25, 28, 29 0, 1, 2, 3, 4, 6, 7 ========= End of change in TS 25.212 ==================================== 4.4.2 WG2 To support the work task “TFCI coding in DSCH hard split mode”, following two requirements shall be fulfilled. 1) UE shall have a method to inform UTRAN whether or not it supports the enhanced TFCI coding in DSCH hard split mode. 2) UTRAN shall have a method to inform UE of the length of TFCI (field1) or TFCI (field2). The first requirement can be satisfied if a new IE, which represents whether UE supports enhanced TFCI coding in DSCH hard split mode or not, is added in UE CAPABILITY INFORMATION message. Regarding the second requirement, UTRAN can inform UE of TFCI (field2) length by IE “Length of TFCI(field2)” which is already included in “Transport Format Combination Set”. In current specification, however, the IE “Length of TFCI(field2)” is required only if the logical split mode is applied. So only what we need is to make the IE “Length of TFCI(field2)” available even if the hard split mode is applied by removing the restriction that both TFCI (field1) and TFCI (field2) have a static length of five bits. 4.4.3 WG3
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.1 Study Areas
4.4.3.1.1 Impact on NBAP messages Currently, on Iub interface, it is assumed that the TFCI bit for DCH and DSCH in hard split mode have 5 bit/5 bit length. TFCI signalling mode that contains TFCI split information is included in following NBAP messages for DSCH split mode setting. • RADIO LINK SETUP REQUEST • RADIO LINK RECONFIGURATION PREPARE • RADIO LINK RECONFIGURATION REQUEST The information for TFCI signalling mode described in NBAP message as follows: ========= TS 25.433 ==================================================
83726f0f79dd0b5bad7d922a555d137b
25.870
9.2.2.50 TFCI signalling mode
This parameter indicates if the normal or split mode is used for the TFCI. In the event that the split mode is to be used then the IE indicates whether the split is 'Hard' or 'Logical', and in the event that the split is 'Logical' the IE indicates the number of bits in TFCI (field 2). IE/Group Name Presence Range IE type and reference Semantics description TFCI signalling option M ENUMERATED (Normal, Split) 'Normal' : meaning no split in the TFCI field (either 'Logical' or 'Hard') 'Split' : meaning there is a split in the TFCI field (either 'Logical' or 'Hard') Split type C-IfSplit Enumerated (Hard, Logical) 'Hard' : meaning that TFCI (field 1) and TFCI (field 2) are each 5 bits long and each field is block coded separately. 'Logical' : meaning that on the physical layer TFCI (field 1) and TFCI (field 2) are concatenated, field 1 taking the most significant bits and field 2 taking the least significant bits). The whole is then encoded with a single block code. Length of TFCI2 OC-SplitType Integer (1..10) This IE indicates the length measured in number of bits of TFCI (field2). Condition Explanation IfSplit The IE shall be present if the TFCI signalling option IE is set to ”Split”. SplitType The IE shall be present if the Split type IE is set to ”Logical”.
83726f0f79dd0b5bad7d922a555d137b
25.870
9.2.2.46 TFCI Signalling Mode
This parameter indicates if the normal or split mode is used for the TFCI. IE/Group Name Presence Range IE type and reference Semantics description TFCI Signalling Mode ENUMERATED (Normal, Split) =========================================================================== In the above message, if the TFCI Signalling Mode is set to be “Split” then it means hard split mode used. To support flexible TFCI bits for hard split, the TFCI bit length information should be signalled to DRNC using the above RNSAP messages. For the backward compatible change, a new optional IE can be added in the above RNSAP messages with a criticality for supporting flexible TFCI bit length in DSCH hard split mode. IE/Group Name Presence Range IE Type and Reference Semantics Description Criticality Assigned Criticality Length of TFCI2 for Hard Split O Integer (1..10) This IE indicates the length measured in number of bits of TFCI (field2). YES reject Before SRNC sets up a Radio Link in a target cell controlled by other RNC, SRNC should know if the target cell supports flexible hard split mode. In order for SRNC to get the information, DRNC can transmit the information using UPLINK SIGNALLING TRANSFER INDICATION message and Neighbouring FDD Cell Information IE in RADIO LINK SETUP/ADDITION RESPONSE/FAILURE message. Flexible Hard Split Support Indicator IE can be transmitted by the following messages • RADIO LINK SETUP RESPONSE • RADIO LINK SETUP FAILURE • RADIO LINK ADDITION RESPONSE • RADIO LINK ADDITION FAILURE • UPLINK SIGNALLING TRANSFER INDICATION 9.2.2.x Flexible Hard Split Support Indicator The Flexible Hard Split Support Indicator indicates whether the particular cell is capable to support Flexible Hard Split or not IE/Group Name Presence Range IE type and reference Semantics description Flexible Hard Split Support Indicator ENUMERATED (Flexible Hard Split Supported, Flexible Hard Split not Supported). 4.4.3.1.3 Impact on User Plane There is no impact on User Plane to support flexible length of TFCI bit for hard split since Frame protocol already supports flexible length of TFCI bit for both logical split and hard split.
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.2 Agreements and associated contributions
4.4.3.2.1 Impact on TS 25.423 4.4.3.2.1.1 RADIO LINK SETUP REQUEST FDD Message IE/Group Name Presence Range IE type and reference Semantics description Criticality Assigned Criticality Message Type M 9.2.1.40 YES reject Transaction ID M 9.2.1.59 – SRNC-Id M RNC-Id 9.2.1.50 YES reject S-RNTI M 9.2.1.53 YES reject D-RNTI O 9.2.1.24 YES reject Allowed Queuing Time O 9.2.1.2 YES reject UL DPCH Information 1 YES reject >UL Scrambling Code M 9.2.2.53 – >Min UL Channelisation Code Length M 9.2.2.25 – >Max Number of UL DPDCHs C – CodeLen 9.2.2.24 – >Puncture Limit M 9.2.1.46 For the UL. – >TFCS M TFCS for the UL 9.2.1.63 – >UL DPCCH Slot Format M 9.2.2.52 – >Uplink SIR Target O Uplink SIR 9.2.1.69 – >Diversity mode M 9.2.2.8 – >SSDT Cell Identity Length O 9.2.2.41 – >S Field Length O 9.2.2.36 – >DPC Mode O 9.2.2.12A YES reject DL DPCH Information 1 YES reject >TFCS M TFCS for the DL. 9.2.1.63 – >DL DPCH Slot Format M 9.2.2.9 – >Number of DL Channelisation Codes M 9.2.2.26A – >TFCI Signalling Mode M 9.2.2.46 – >TFCI Presence C- SlotFormat 9.2.1.55 – >Multiplexing Position M 9.2.2.26 – >Power Offset Information 1 – >>PO1 M Power Offset 9.2.2.30 Power offset for the TFCI bits. – >>PO2 M Power Offset 9.2.2.30 Power offset for the TPC bits. – >>PO3 M Power Offset 9.2.2.30 Power offset for the pilot bits. – >FDD TPC Downlink Step Size M 9.2.2.16 – >Limited Power Increase M 9.2.2.21A – >Inner Loop DL PC Status M 9.2.2.21a – >Length of TFCI2 for Hard Split O 9.2.2.x YES reject DCH Information M DCH FDD Information 9.2.2.4A YES reject DSCH Information O DSCH FDD Information 9.2.2.13A YES reject RL Information 1…<maxnoofRLs> EACH notify 4.4.3.2.1.2 RADIO LINK RECONFIGURATION PREPARE FDD Message IE/Group Name Presence Range IE Type and Reference Semantics Description Criticality Assigned Criticality Message Type M 9.2.1.40 YES reject Transaction ID M 9.2.1.59 – Allowed Queuing Time O 9.2.1.2 YES reject UL DPCH Information 0..1 YES reject >UL Scrambling Code O 9.2.2.53 – >UL SIR Target O Uplink SIR 9.2.1.69 – >Min UL Channelisation Code Length O 9.2.2.25 – >Max Number of UL DPDCHs C – CodeLen 9.2.2.24 – >Puncture Limit O 9.2.1.46 For the UL. – >TFCS O 9.2.1.63 TFCS for the UL. – >UL DPCCH Slot Format O 9.2.2.52 – >Diversity Mode O 9.2.2.8 – >SSDT Cell Identity Length O 9.2.2.41 – >S-Field Length O 9.2.2.36 – DL DPCH Information 0..1 YES reject >TFCS O 9.2.1.63 TFCS for the DL. – >DL DPCH Slot Format O 9.2.2.9 – >Number of DL Channelisation Codes O 9.2.2.26A – >TFCI Signalling Mode O 9.2.2.46 – >TFCI Presence C- SlotFormat 9.2.1.55 – >Multiplexing Position O 9.2.2.26 – >Limited Power Increase O 9.2.2.21A – >Length of TFCI2 for Hard Split O 9.2.2.x YES reject DCHs to Modify O FDD DCHs to Modify 9.2.2.13C YES reject DCHs to Add O DCH FDD Information 9.2.2.4A YES reject DCHs to Delete 0..<maxnoofDCHs> GLOBAL reject
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.2.1.3 UPLINK SIGNALLING TRANSFER INDICATION
FDD Message IE/Group Name Presence Range IE type and reference Semantics description Criticality Assigned Criticality Message Type M 9.2.1.40 YES ignore Transaction ID M 9.2.1.59 – UC-Id M 9.2.1.71 YES ignore SAI M 9.2.1.52 YES ignore Cell GAI O 9.2.1.5A YES ignore C-RNTI M 9.2.1.14 YES ignore S-RNTI M 9.2.1.54 YES ignore D-RNTI O 9.2.1.24 YES ignore Propagation Delay M 9.2.2.33 YES ignore STTD Support Indicator M 9.2.2.45 YES ignore Closed Loop Mode1 Support Indicator M 9.2.2.2 YES ignore Closed Loop Mode2 Support Indicator M 9.2.2.3 YES ignore L3 Information M 9.2.1.32 YES ignore CN PS Domain Identifier O 9.2.1.12 YES ignore CN CS Domain Identifier O 9.2.1.11 YES ignore URA Information O 9.2.1.70B YES ignore Cell GA Additional Shapes O 9.2.1.5B ­­YES ignore Flexible Hard Split Support Indicator O 9.2.2.x YES ignore 4.4.3.2.1.4 (9.2.1.41B) Neighbouring FDD Cell Information The Neighbouring FDD Cell Information IE provides information for FDD cells that are a neighbouring cells to a cell in the DRNC. IE/Group Name Presence Range IE type and reference Semantics description Criticality Assigned Criticality Neighbouring FDD Cell Information 1..<maxnoofFDDneighbours> – >C-Id M 9.2.1.6 – >UL UARFCN M UARFCN 9.2.1.66 Corresponds to Nu in ref. [6] – >DL UARFCN M UARFCN 9.2.1.66 Corresponds to Nd in ref. [6] – >Frame Offset O 9.2.1.30 – >Primary Scrambling Code M 9.2.1.45 – >Primary CPICH Power O 9.2.1.44 – >Cell Individual Offset O 9.2.1.7 – >Tx Diversity Indicator M 9.2.2.50 >STTD Support Indicator O 9.2.2.45 – >Closed Loop Mode1 Support Indicator O 9.2.2.2 – >Closed Loop Mode2 Support Indicator O 9.2.2.3 – >Restriction State Indicator O 9.2.1.48C YES ignore >Flexible Hard Split Support Indicator O 9.2.2.x YES ignore 4.4.3.2.1.5 New Introduced Information Elements 4.4.3.2.1.5.1 Length of TFCI2 for Hard Split This IE indicates the length measured in number of bits of TFCI (field2). IE/Group Name Presence Range IE type and reference Semantics description Length of TFCI2 for Hard Split Integer (1..10)
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.2.1.5.2 Flexible Hard Split Support Indicator
The Flexible Hard Split Support Indicator indicates whether the particular cell is capable to support Flexible Hard Split or not. IE/Group Name Presence Range IE type and reference Semantics description Flexible Hard Split Support Indicator ENUMERATED (Flexible Hard Split Supported,). 4.4.3.2.2 Impact on TS 25.433 For Radio Link Setup, Synchronised Radio Link Reconfiguration Preparation and Unsynchronised Radio Link Reconfiguration procedure, texts for successful operation are added as follows (e.g. for Radio Link Setup procedure): [FDD – If the RADIO LINK SETUP REQUEST message includes the Length of TFCI2 IE and the TFCI signalling option IE is set to ‘Split’, then the Node B shall apply the length of TFCI2 field indicated in the message.] [FDD – If the Length of TFCI2 IE is not included in the RADIO LINK SETUP REQUEST message and the Split Type IE is present with the value ‘Hard’, then the Node B shall assume the value of the TFCI2 Field is 5 bits.] For Radio Link Setup, Synchronised Radio Link Reconfiguration Preparation and Unsynchronised Radio Link Reconfiguration procedure, texts for Abnormal Conditions are added as follows (e.g. for Radio Link Setup procedure): [FDD – If the RADIO LINK SETUP REQUEST message contains the Length of TFCI2 IE , but the TFCI signalling option IE is set to “Normal”, then the Node B shall reject the procedure using the RADIO LINK SETUP FAILURE message. [FDD – If the RADIO LINK SETUP REQUEST message does not contain the Length of TFCI2 IE but the Split type IE is set to “Logical”, then the Node B shall reject the procedure using the RADIO LINK SETUP FAILURE message. [FDD – If the RADIO LINK SETUP REQUEST message contains the Length of TFCI2 IE and the Length of TFCI2 IE is set to 5, but the Split type IE is set to “Hard”, then the Node B shall reject the procedure using the RADIO LINK SETUP FAILURE message.
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.3 Specification Impact and associated Change Request
Table 1: Place where Change request is given in order to refer the new procedure 3G TS CR Title Remarks 25.433 583 NBAP signalling support for DSCH hard split mode 25.423 543 RNSAP signalling support for DSCH hard split mode
83726f0f79dd0b5bad7d922a555d137b
25.870
4.4.3.4 Backward Compatibility
83726f0f79dd0b5bad7d922a555d137b
25.870
5 TFCI power control in DSCH hard split mode
83726f0f79dd0b5bad7d922a555d137b
25.870
5.1 Introduction
According to Release99 and Rel’4 specification, there is split mode of operation where TFCI2 (TFCI for DSCH) is not necessarily transmitted from every cell in the active set when UE is in soft handover region. Thus, the combined TFCI power in UE may not be enough to detect it reliably. As well, the power offset for TFCI (PO1) is determined in Radio Link Setup procedure, and cannot be flexibly changed any longer when Radio Link Reconfiguration, Radio Link Addition or Deletion occurs. Therefore, there seems to be a reliability problem if the power offset is initially decided a lower value than required one regardless of whether UE is in soft handover or not. To consider this problem in Release99 and Rel’4, the power offset must be always set the highest value even when UE does not exist in soft handover region. In the viewpoint of power resource management, it may be inefficient to always allocate the high power offset to TFCI. Therefore, TFCI power control enhancement methods in the DSCH hard split mode are proposed to solve these problems in Rel’5. In the following sections, two methods are described to flexibly adjust the power offset for TFCI. 5.2 Requirements The proposed TFCI power control scheme is to flexibly adjust the power offset for TFCI. The requirements are summarised as follows. • The backward compatibility to Release 99/Rel 4 should be guaranteed. • Hardware increase shall be minimised. • The proposed scheme shows an acceptable performance. • Compatibility with other proposed methods is still kept.
83726f0f79dd0b5bad7d922a555d137b
25.870
5.3 Proposed TFCI power control scheme
In this section, some details on the proposed TFCI power control scheme are described, in which new parameters such as TFCI PO or TFCI PO_primary are introduced in Frame Protocol specification and how to allocate flexible power offset for TFCI is explained. As well, simulation results are shown to indicate the required values for TFCI power offset in soft handover. 5.3.1 Proposed TFCI power control scheme for Rel’5 The proposed TFCI power control scheme is to flexibly adjust the power offset for TFCI in the DSCH hard split mode. For such an operation via Frame Protocol, the parameters that express power offset are introduced. Note that the proposed power offset is applied to both TFCI1 (TFCI for DCH) and TFCI2 (TFCI for DSCH) in the DSCH hard split mode, since the only power offset for TFCI, PO1, is defined in Release99 and Rel’4. Several TFCI power offset values can be supported if the power offset values with additional information are updated. Two methods are described to show the operation of the proposed scheme based on the additional information such as whether UE exists in soft handover region or whether the cell transmitting DSCH is primary using SSDT uplink only signaling. In method 1, the power offset of PO1 can be determined by whether UE is in soft handover region. If the UE moves from non-handover to handover region, the power offset of PO1 is added to DPCCHs as shown in Figure 5.1. The proper power offset value may beobtained in RNC and signaled by the parameter of TFCI PO to Node B via Frame Protocol. Figure 5.1 Power level in method 1 In method 2, it is the same point that the power offset of PO1 is determined by whether UE is in soft handover (see Figure 5.2 (a)). In addition, the power offset of PO1is determined by whether TFCI2 is transmitted from primary cell (see Figure 5.2 (b)). The decision on primary or non-primary is made using SSDT uplink only signaling. Note that the SSDT uplink only signaling in method 2 is activated when DSCH power control improvement in soft handover in Rel’4 is operated. When the cell that transmits TFCI2 is primary, the power offset of PO1 for TFCI is added by TFCI PO_primary via Frame Protocol. Otherwise, the power offset of PO1 is applied in soft handover as such a method 1. (a) non-primary cell case (b) primary cell case Figure 5.2 Power level in method 2 In Table 5.1 the Frame Protocol parameters for power offset for TFCI, PO1, are summarised. Note that the proposed power offset should be applied to the DPCCHs, which send both TFCI1 and TFCI2 in the DSCH hard split mode. While the power offset values for the DPCCHs transmitting TFCI1 only follow the procedure defined in Release99 or Rel’4. Table 5.1 Frame Protocol Parameters for TFCI power offset Cell sending the DSCH Cell(s) not sending the DSCH Primary Non-primary Method 1 TFCI PO Method 2 TFCI PO_primary TFCI PO Note that all parameters show the TFCI power offset, PO1, which is updated by Frame Protocol. TFCI PO means the power offset for TFCI in method 1, and the power offset for TFCI transmitted from non-primary cell in soft handover for method 2. TFCI PO_primary is the power offset for TFCI transmitted from primary cell in soft handover for method 2. Figures 5.3 and 5.4 are the overall system behavior in the proposed TFCI power control scheme in the DSCH hard split mode, which show the example cases of methods 1 and 2, respectively. Here, it is assumed that UE in soft handover has three radio links in active set. Since Node B2 in DRNC sends DSCH, DRNC treats DSCH scheduling and thus TFCI hard split signaling mode is used. TFCI2 (TFCI for DSCH) is transmitted from Node B1 and 2, not from every cell in the active set. Figure 5.3 shows that the method 1 can adjust TFCI bit power by the proper power offset in radio links where TFCI2 is transmitted. TFCI PO is determined in SRNC and signaled to DRNC and then to Node B1 and 2 by Iur/Iub DCH Frame Protocol. Figure 5.3 Overall system behavior for method 1 with additional power offset In Figure 5.4, it is assumed that Node B 2 is determined primary cell by using the activated uplink SSDT signaling. TFCI POin method 2 is defined in the same way with that in method 1. Additionally, the power offset parameter for the primary case, TFCI PO_primary, is sent to Node B2 which transmit the DSCH. Node B2 may choose the parameter of TFCI PO/TFCI PO_primary according to the primary/non-primary condition. Note that in Figures 5.3 and 5.4 TFCI power offset of PO1 from Node B3 is transmitted in the same way with Release 99 or Rel’4, because TFCI2 is not transmitted in the radio link from Node B3. Figure 5.4 Overall system behavior for method 2 with additional power offset 5.3.2 Considerations on the required power offset In this section, the required power offset for various radio link environments is obtained through link level simulations. The simulation is performed to show how much power offset for TFCI is required to guarantee the reliability of TFCI 2 bits when TFCI2 is not transmitted from every cell in the active set. The simulation assumptions are shown in Table 5.2. Table 5.2 Simulation assumptions. Fading channel Flat Rayleigh Mobile speed 3 km/hr Active set in soft handover 2 or 3 Received power from each cell in active set Equal TFCI coding for DSCH Same as in Release 99 Power control Perfect Table 5.3 shows the required power offset for TFCI2, which is relatively calculated from reference power. The reference is the required power to achieve a word error rate (WER) of 1 % when every cell transmits TFCI2. Note that all of TFCI2 from several links are received and combined in UE in order to calculate such a required power offset. Three cases of handover are assumed, among which 3-way(1 cell) and 3-way(2 cells) mean that 1 and 2 cells transmit TFCI2 in 3-way handover, respectively. Table 5.3 Required power offset for TFCI2 Cases Method 1 Method 2 PO1 (TFCI PO) PO1 (TFCI PO_primary) PO1 (TFCI PO) 2-way (1 cell) 19.5 dB 4.6 dB 19.5 dB 3-way (1 cell) 23.27 dB 7.27 dB 23.27 dB 3-way (2 cells) 8.97 dB 3.47 dB 8.97 dB From the Table 5.3, we see that the required TFCI power offset (PO1) which guarantees the reliability has the range of 3.47 to 23.27dB. Some of the ranges include the power offset values beyond the range of PO1 that is from 0 to 6dB. Therefore, it is needed to adaptively set TFCI2 power with power offset of TFCI PO or TFCI PO_primary via Frame Protocol, in order to guarantee the reliable and efficient transmission of TFCI2. As well, the conditions to determine the power offset for TFCI is as follows: • The number of radio links in the active set • The number of radio links in the active set that transmit TFCI2 5.3.3 Complexity In order to support the proposed TFCI power control scheme, there is no increase in hardware complexity, but a higher layer signaling from SRNC to CRNC/Node B is required. The power offset value should be obtained in SRNC and signaled to CRNC/Node B by the newly defined parameters in Section 5.3.1. • UE point of view No additional hardware and software are required. • Node B point of view The software changes are expected in order to flexibly set the power offset for TFCI. The new singling elements are added to the Iur/Iub specification. There is no impact on the existing hardware structures. • RNC point of view The software changes are expected in order to calculate the newly defined TFCI power offset. The new signaling elements are required to add to the Iur/Iub specification. The existing hardware structures are not impacted.
83726f0f79dd0b5bad7d922a555d137b
25.870
5.4 Specification Impact and associated Change Request
The expected specification impacts are small. 25.214: Time-varying TFCI power by method 1 or method 2 should be explained. • For method 1, no impact is expected. • For method 2, SSDT uplink signalling usage for TFCI power control is to be described. 25.427: The changed power offset should be signalled via Iur/Iub signalling. • For method 1, new parameter, TFFCI PO, is to be added in the information element. • For method 2, new parameter, TFCI PO and TFCI PO_primary, is to be added in the information element. 25.435: Description regarding to the DSCH power offset should be clarified. WG1 ================== start of change in TS25.214 ==============================
83726f0f79dd0b5bad7d922a555d137b
25.870
5.2.1 DPCCH/DPDCH
83726f0f79dd0b5bad7d922a555d137b
25.870
5.2.1.1 General
The downlink transmit power control procedure controls simultaneously the power of a DPCCH and its corresponding DPDCHs. The power control loop adjusts the power of the DPCCH and DPDCHs with the same amount, i.e. the relative power difference between the DPCCH and DPDCHs is not changed. The relative transmit power offset between DPCCH fields and DPDCHs is determined by the network. The TFCI, TPC and pilot fields of the DPCCH are offset relative to the DPDCHs power by PO1, PO2 and PO3 dB respectively. The power offsets may vary in time. UTRAN may use the SSDT operation as specified in section 5.2.2 to determine what power offset to use for TFCI in hard split mode with respect to the associated downlink DPDCH. The method for controlling the power offsets within UTRAN is specified in [6]. The power of CCC field in DL DPCCH for CPCH is the same as the power of the pilot field.
83726f0f79dd0b5bad7d922a555d137b
25.870
5.2.1.4 Site selection diversity transmit power control
83726f0f79dd0b5bad7d922a555d137b
25.870
5.2.1.4.1 General
Site selection diversity transmit power control (SSDT) is another macro diversity method in soft handover mode. This method is optional in UTRAN. Operation is summarised as follows. The UE selects one of the cells from its active set to be ‘primary’, all other cells are classed as ‘non primary’. The main objective is to transmit on the downlink from the primary cell, thus reducing the interference caused by multiple transmissions in a soft handover mode. A second objective is to achieve fast site selection without network intervention, thus maintaining the advantage of the soft handover. In order to select a primary cell, each cell is assigned a temporary identification (ID) and UE periodically informs a primary cell ID to the connecting cells. The non-primary cells selected by UE switch off the transmission power. The primary cell ID is delivered by UE to the active cells via uplink FBI field. SSDT activation, SSDT termination and ID assignment are all carried out by higher layer signalling. SSDT can only be used when the P-CPICH is used as the downlink phase reference. UTRAN may also command UE to use SSDT signalling in the uplink although cells would transmit the downlink as without SSDT active. In case SSDT is used in the uplink direction only, the processing in the UE for the radio links received in the downlink is as with macro diversity in non-SSDT case. The downlink operation mode for SSDT is set by higher layers. UTRAN may use the SSDT information for the PDSCH power control as specified in section 5.2.2 and for the TFCI power control in hard split mode . NOTE: This feature of SSDT limited to uplink only applies to terminals that are DSCH capable. ================== end of change in TS25.214 ================================ WG3 5.4.1 Study Areas 5.4.1.1 New Information The parameters to be needed for supporting TFCI power control in the DSCH hard split mode are as followings: 1) for TFCI power control method 1 : TFCI PO 2) for TFCI power control method 2 : TFCI PO, TFCI PO_primary 3) to indicate whether the proposed TFCI power control scheme is supported in the cell : TFCI PC Support Indicator For the method 2, the parameters for the primary/secondary status determination from SSDT commands in the uplink FBI (Feedback Information) field would be shared with DSCH Power Control Improvement. When the improved DSCH PC is activated, the TFCI power control method 2 is also activated. 5.4.1.2 Example Scenario 5.4.1.2.1 Example Scenario for Method 1 This signalling procedure is for figure 5.3, and shows how the new power offset is applied. 1. SRNC sends RNSAP message RADIO LINK SETUP REQUEST to DRNC. 2. DRNC sends RADIO LINK SETUP REQUEST to Node B1. 3. Node B1 sends RADIO LINK SETUP RESPONSE to DRNC. 4. DRNC sends RNSAP message RADIO LINK SETUP RESPONSE to SRNC with the parameter which Node B1 provided [TFCI PC Support Indicator]. 5. SRNC sends RNSAP message RADIO LINK ADDITION REQUEST to DRNC. 6. DRNC sends RADIO LINK SETUP REQUEST to Node B2. 7. Node B2 sends RADIO LINK SETUP RESPONSE to DRNC. 8. DRNC sends RNSAP message RADIO LINK ADDITION RESPONSE to SRNC with the parameter which Node B2 provided [TFCI PC Support Indicator]. 9. SRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to DRNC with the power offset parameter [TFCI PO]. 10. DRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to Node B1 with the power offset parameter [TFCI PO]. 11. SRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to DRNC with the power offset parameter [TFCI PO]. 12. DRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to Node B2 with the power offset parameter [TFCI PO]. 5.4.1.2.2 Example Scenario for Method 2 This signalling procedure is for figure 5.4, and shows how the new power offsets are applied. 1. SRNC sends RNSAP message RADIO LINK SETUP REQUEST to DRNC. 2. DRNC sends RADIO LINK SETUP REQUEST to Node B1. 3. Node B1 sends RADIO LINK SETUP RESPONSE to DRNC. 4. DRNC sends RNSAP message RADIO LINK SETUP RESPONSE to SRNC with the parameter which Node B1 provided [TFCI PC Support Indicator]. 5. SRNC sends RNSAP message RADIO LINK ADDITION REQUEST to DRNC. 6. DRNC sends RADIO LINK SETUP REQUEST to Node B2. 7. Node B2 sends RADIO LINK SETUP RESPONSE to DRNC. 8. DRNC sends RNSAP message RADIO LINK ADDITION RESPONSE to SRNC with the parameter which Node B2 provided [TFCI PC Support Indicator]. 9. SRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to DRNC with the power offset parameter [TFCI PO]. 10. DRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to Node B1 with the power offset parameter [TFCI PO]. 11. SRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to DRNC with the power offset parameter [TFCI PO, TFCI PO_primary]. 12. DRNC sends RADIO INTERFACE PARAMTER UPDATE control frame to Node B2 with the power offset parameter [TFCI PO, TFCI PO_primary].
83726f0f79dd0b5bad7d922a555d137b
25.870
5.4.2 Agreements and associated contributions
It is agreed that the Method2 described in the study area is accepted as the Enhanced TFCI Power Control procedure and this solution will be adopted and specified in RAN3 TSs. 1. It is agreed to use the User plane to signal TFCI power offsets. 2. It is agreed that TFCI PO and TFCI PO_primary parameters are introduced in RADIO INTERFACE UPDATE PARAMTER in DCH frame protocol. 3. It is agreed that TFCI PC Support Indicator IE is introduced in RADIO LINK SETUP RESPONSE, RADIO LINK SETUP FAILURE, RADIO LINK ADDITION RESPONSE and RADIO LINK ADDITION FAILURE messages in RNSAP. It is clarified that the parameters for the primary/secondary status determination from SSDT commands in the uplink FBI (Feedback Information) field are shared with DSCH Power Control Improvement.
83726f0f79dd0b5bad7d922a555d137b
25.870
5.4.3 Specification Impact and associated Change Request
5.4.3.1 Impacts on RNSAP (TS 25.423) =========================== TS 25.423 ==============================
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.1 Radio Link Setup
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.1.1 General
This procedure is used for establishing the necessary resources in the DRNS for one or more radio links. The connection-oriented service of the signalling bearer shall be established in conjunction with this procedure.
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.1.2 Successful Operation
Figure 5: Radio Link Setup procedure: Successful Operation When the SRNC makes an algorithmic decision to add the first cell or set of cells from a DRNS to the active set of a specific UE-UTRAN connection, the RADIO LINK SETUP REQUEST message is sent to the corresponding DRNC to request establishment of the radio link(s). The DRNS shall prioritise resource allocation for the RL(s) to be established according to Annex A. If the RADIO LINK SETUP REQUEST message includes the Allowed Queuing Time IE the DRNS may queue the request the time corresponding to the value of the Allowed Queuing Time IE before starting to execute the request. If no D-RNTI IE was included in the RADIO LINK SETUP REQUEST message, the DRNC shall assign a new D-RNTI for this UE. Transport Channels Handling: DCH(s): [TDD - If the DCH Information IE is present in RADIO LINK SETUP REQUEST message, the DRNS shall configure the new DCHs according to the parameters given in the message.] If the RADIO LINK SETUP REQUEST message includes a DCH Information IE with multiple DCH Specific Info IEs then the DRNS shall treat the DCHs in the DCH Information IE as a set of co-ordinated DCHs. [FDD - For DCHs which do not belong to a set of co-ordinated DCHs with the QE-Selector IE set to "selected", the Transport channel BER from that DCH shall be the base for the QE in the UL data frames. If no Transport channel BER is available for the selected DCH the Physical channel BER shall be used for the QE, ref. [4]. If the QE-Selector is set to "non-selected ", the Physical channel BER shall be used for the QE in the UL data frames, ref. [4].] For a set of co-ordinated DCHs the Transport channel BER from the DCH with the QE-Selector IE set to "selected" shall be used for the QE in the UL data frames, ref. [4]. [FDD - If no Transport channel BER is available for the selected DCH the Physical channel BER shall be used for the QE, ref. [4]. If all DCHs have QE-Selector IE set to "non-selected" the Physical channel BER shall be used for the QE, ref. [4].] The DRNS shall use the included UL DCH FP Mode IE for a DCH or a set of co-ordinated DCHs as the DCH FP Mode in the Uplink of the user plane for the DCH or the set of co-ordinated DCHs. The DRNS shall use the included ToAWS IE for a DCH or a set of co-ordinated DCHs as the Time of Arrival Window Start Point in the user plane for the DCH or the set of co-ordinated DCHs. The DRNS shall use the included ToAWE IE for a DCH or a set of co-ordinated DCHs as the Time of Arrival Window End Point in the user plane for the DCH or the set of co-ordinated DCHs. The Frame Handling Priority IE defines the priority level that should be used by the DRNS to prioritise between different frames of the data frames of the DCHs in the downlink on the radio interface in congestion situations once the new RL(s) have been activated. If the DCH Specific Info IE in the DCH Information IE includes the Guaranteed Rate Information IE, the DRNS shall treat the included IEs according to the following: - If the Guaranteed Rate Information IE includes the Guaranteed UL Rate IE, the DRNS may decide to request the SRNC to limit the user rate of the uplink of the DCH at any point in time. The DRNS may request the SRNC to reduce the user rate of the uplink of the DCH below the guaranteed bit rate, however, whenever possible the DRNS should request the SRNC to reduce the user rate between the maximum bit rate and the guaranteed bit rate. If the DCH Specific Info IE in the DCH Information IE does not include the Guaranteed UL Rate IE, the DRNS shall not limit the user rate of the uplink of the DCH. - If the Guaranteed Rate Information IE includes the Guaranteed DL Rate IE, the DRNS may decide to request the SRNC to limit the user rate of the downlink of the DCH at any point in time. The DRNS may request the SRNC to reduce the user rate of the downlink of the DCH below the guaranteed bit rate, however, whenever possible the DRNS should request the SRNC to reduce the user rate between the maximum bit rate and the guaranteed bit rate. If the DCH Specific Info IE in the DCH Information IE does not include the Guaranteed DL Rate IE, the DRNS shall not limit the user rate of the downlink of the DCH. DSCH(s): If the DSCH Information IE is included in the RADIO LINK SETUP REQUEST message, the DRNC shall establish the requested DSCHs [FDD - on the RL indicated by the PDSCH RL ID IE]. In addition, the DRNC shall send a valid set of DSCH Scheduling Priority IE and MAC-c/sh SDU Length IE parameters to the SRNC in the message RADIO LINK SETUP RESPONSE message. [TDD - USCH(s)]: [TDD – The DRNS shall use the list of RB Identities in the RB Info IE in the USCH information IE to map each RB Identity IE to the corresponding USCH.] Physical Channels Handling: [FDD - Compressed Mode]: [FDD - If the RADIO LINK SETUP REQUEST message includes the Transmission Gap Pattern Sequence Information IE, the DRNS shall store the information about the Transmission Gap Pattern Sequences to be used in the Compressed Mode Configuration. This Compressed Mode Configuration shall be valid in the DRNS until the next Compressed Mode Configuration is configured in the DRNS or last Radio Link is deleted.] [FDD - If the RADIO LINK SETUP REQUEST message includes the Transmission Gap Pattern Sequence Information IE and the Active Pattern Sequence Information IE, the DRNS shall use the information to activate the indicated Transmission Gap Pattern Sequences(s) in the new RL. The received CM Configuration Change CFN IE refers to latest passed CFN with that value. The DRNS shall treat the received TGCFN IEs as follows:] - [FDD - If any received TGCFN IE has the same value as the received CM Configuration Change CFN IE, the DRNS shall consider the concerning Transmission Gap Pattern Sequence as activated at that CFN.] - [FDD - If any received TGCFN IE does not have the same value as the received CM Configuration Change CFN IE but the first CFN after the CM Configuration Change CFN with a value equal to the TGCFN IE has already passed, the DRNS shall consider the concerning Transmission Gap Pattern Sequence as activated at that CFN.] - [FDD - For all other Transmission Gap Pattern Sequences included in the Active Pattern Sequence Information IE, the DRNS shall activate each Transmission Gap Pattern Sequence at the first CFN after the CM Configuration Change CFN with a value equal to the TGCFN IE for the Transmission Gap Pattern Sequence.] [FDD- If the Downlink Compressed Mode Method IE in one or more Transmission Gap Pattern Sequence is set to 'SF/2' in the RADIO LINK SETUP REQUEST message, the DRNS shall include the Transmission Gap Pattern Sequence Scrambling Code Information IE in the RADIO LINK SETUP RESPONSE message indicating for each DL Channelisation Code whether the alternative scrambling code shall be used or not.] [FDD - DL Code Information]: [FDD – When more than one DL DPDCH are assigned per RL, the segmented physical channel shall be mapped on to DL DPDCHs according to [8]. When p number of DL DPDCHs are assigned to each RL, the first pair of DL Scrambling Code and FDD DL Channelisation Code Number corresponds to “PhCH number 1”, the second to “PhCH number 2”, and so on until the pth to “PhCH number p”.] General: [FDD - If the Propagation Delay IE is included, the DRNS may use this information to speed up the detection of UL synchronisation on the Uu interface.] [FDD – If the received Limited Power Increase IE is set to 'Used', the DRNS shall, if supported, use Limited Power Increase according to ref. [10] subclause 5.2.1 for the inner loop DL power control.] Radio Link Handling: Diversity Combination Control: [FDD - The Diversity Control Field IE indicates for each RL except for the first RL whether the DRNS shall combine the RL with any of the other RLs or not on the Iur. If the Diversity Control Field IE is set to "May" (be combined with another RL), then the DRNS shall decide for any of the alternatives. If the Diversity Control Field IE is set to "Must", the DRNS shall combine the RL with one of the other RL. When an RL is to be combined, the DRNS shall choose which RL(s) to combine it with. If the Diversity Control Field IE is set to “Must not”, the DRNS shall not combine the RL with any other existing RL.] [FDD - In the case of combining one or more RLs the DRNC shall indicate in the RADIO LINK SETUP RESPONSE message with the Diversity Indication IE that the RL is combined with another RL RL for all RLs but the first RL. In this case the Reference RL ID IE shall be included to indicate with which RL the combination is performed. The Reference RL ID IE shall not be included for the first of the combined RLs, for which the Transport Layer Address IE and the Binding ID IE shall be included.] [FDD - In the case of not combining an RL with another RL, the DRNC shall indicate in the RADIO LINK SETUP RESPONSE message with the Diversity Indication IE that no combining is performed. In this case the DRNC shall include both the Transport Layer Address IE and the Binding ID IE for the transport bearer to be established for each DCH and DSCH of the RL in the RADIO LINK SETUP RESPONSE message.] [TDD - The DRNC shall always include in the RADIO LINK SETUP RESPONSE message both the Transport Layer Address IE and the Binding ID IE for the transport bearer to be established for each DCH, DSCH and USCH of the RL.] In case of a set of co-ordinated DCHs requiring a new transport bearer on Iur the Binding ID IE and the Transport Layer Address IE shall be included only for one of the DCHs in the set of co-ordinated DCHs. [FDD-Transmit Diversity]: [FDD – If the cell in which the RL is being set up is capable to provide Close loop Tx diversity, the DRNC shall include the Closed Loop Timing Adjustment Mode IE in the RADIO LINK SETUP RESPONSE message indicating the configured Closed loop timing adjustment mode of the cell.] [FDD – When Diversity Mode IE is "STTD", "Closed loop mode1", or "Closed loop mode2", the DRNC shall activate/deactivate the Transmit Diversity to each Radio Link in accordance with Transmit Diversity Indicator IE]. DL Power Control: [FDD - If both the Initial DL TX Power IE and Uplink SIR Target IE are included in the message, the DRNS shall use the indicated DL TX Power and Uplink SIR Target as initial value. If the value of the Initial DL TX Power IE is outside the configured DL TX power range, the DRNS shall apply these constrains when setting the initial DL TX power. The DRNS shall also include the configured DL TX power range defined by Maximum DL TX Power IE and Minimum DL TX Power IE in the RADIO LINK SETUP RESPONSE message. The DRNS shall not transmit with a higher power than indicated by the Maximum DL TX Power IE or lower than indicated by the Minimum DL TX Power IE on any DL DPCH of the RL except during compressed mode, when the PSIR(k) , as described in ref.[10] subclause 5.2.1.3, shall be added to the maximum DL power in slot k.] [FDD - If both the Initial DL TX Power and the Uplink SIR Target IEs are not included in the RADIO LINK SETUP REQUEST message, then DRNC shall determine the initial Uplink SIR Target and include it in the Uplink SIR Target IE in the RADIO LINK SETUP RESPONSE message.] [FDD - If the Primary CPICH Ec/No IE is present, the DRNC should use the indicated value when deciding the Initial DL TX Power.] [TDD - If the Primary CCPCH RSCP IE and/or the [3.84Mcps TDD - DL Time Slot ISCP Info IE] and/or the [1.28Mcps TDD - DL Time Slot ISCP Info LCR IE] are present, the DRNC should use the indicated values when deciding the Initial DL TX Power.] [FDD – The DRNS shall start the DL transmission using the indicated DL TX power level (if received) or the decided DL TX power level on each DL channelisation code of a RL until UL synchronisation is achieved on the Uu interface for the concerning RLS or Power Balancing is activated. No inner loop power control or power balancing shall be performed during this period. The DL power shall then vary according to the inner loop power control (see ref.[10] subclause 5.2.1.2) and the power control procedure (see 8.3.7).] [TDD – The DRNS shall start the DL transmission using the decided DL TX power level on each DL channelisation code and on each Time Slot of a RL until UL synchronisation is achieved on the Uu interface for the concerning RL. No inner loop power control shall be performed during this period. The DL power shall then vary according to the inner loop power control (see ref. [22] subclause 4.2.3.3).] [FDD – If the received Inner Loop DL PC Status IE is set to “Active”, the DRNS shall activate the inner loop DL power control for all RLs. If Inner Loop DL PC Status IE is set to “Inactive”, the DRNS shall deactivate the inner loop DL power control for all RLs according to ref. [10]. [FDD - If the DPC Mode IE is present in the RADIO LINK SETUP REQUEST message, the DRNC shall apply the DPC mode indicated in the message, and be prepared that the DPC mode may be changed during the life time of the RL. If the DPC Mode IE is not present in the RADIO LINK SETUP REQUEST message, DPC mode 0 shall be applied (see ref. [10]).] Neighbouring Cell Handling: If there are UMTS neighbouring cell(s) to the cell in which a Radio Link was established then: - The DRNC shall include the Neighbouring FDD Cell Information IE and/or Neighbouring TDD Cell Information IE in the Neighbouring UMTS Cell Information IE for each neighbouring FDD cell and/or TDD cell respectively. In addition, if the information is available, the DRNC shall include the Frame Offset IE, Primary CPICH Power IE, Cell Individual Offset IE, STTD Support Indicator IE, Closed Loop Mode1 Support Indicator IE and Closed Loop Mode2 Support Indicator IE in the Neighbouring FDD Cell Information IE, and the Frame Offset IE, Cell Individual Offset IE, DPCH Constant Value IE and the PCCPCH Power IE in the Neighbouring TDD Cell Information IE. - If a UMTS neighbouring cell is not controlled by the same DRNC, the DRNC shall also include the CN PS Domain Identifier IE and/or CN CS Domain Identifier IE which are the identifiers of the CN nodes connected to the RNC controlling the UMTS neighbouring cell. - [FDD - The DRNC shall include the DPC Mode Change Support Indicator IE if the DRNC is aware that the neighbouring cell supports DPC mode change.] For the UMTS neighbouring cells which are controlled by the DRNC, the DRNC shall report in the RADIO LINK SETUP RESPONSE message the restriction state of those cells, otherwise Restriction state indicator IE may be absent. The DRNC shall include the Restriction state indicator IE for the neighbouring cells which are controlled by the DRNC in the Neighbouring FDD Cell Information IE, the Neighbouring TDD Cell Information IE and the Neighbouring TDD Cell Information LCR IE. If there are GSM neighbouring cells to the cell(s) where a radio link is established, the DRNC shall include the Neighbouring GSM Cell Information IE in the RADIO LINK SETUP RESPONSE message for each of the GSM neighbouring cells. If available the DRNC shall include the Cell Individual Offset IE in the Neighbouring GSM Cell Information IE. General: [FDD - If the RADIO LINK SETUP REQUEST message includes the SSDT Cell Identity IE and the S-Field Length IE, the DRNS shall activate SSDT, if supported, using the SSDT Cell Identity IE and SSDT Cell Identity Length IE.] [FDD - If the RADIO LINK SETUP REQUEST message includes the SSDT Cell Identity for EDSCHPC IE, the DRNS shall activate enhanced DSCH power control, if supported, using the SSDT Cell Identity for EDSCHPC IE and SSDT Cell Identity Length IE as well as Enhanced DSCH PC IE in accordance with ref. [10] subclause 5.2.2. If the RADIO LINK SETUP REQUEST message includes both SSDT Cell Identity IE and SSDT Cell Identity for EDSCHPC IE, then the DRNS shall ignore the SSDT Cell Identity for EDSCHPC IE.] [FDD - If the DRAC Control IE is set to "requested" in the RADIO LINK SETUP REQUEST message for at least one DCH and if the DRNS supports the DRAC, the DRNC shall indicate in the RADIO LINK SETUP RESPONSE message the Secondary CCPCH Info IE for the FACH where the DRAC information is sent, for each Radio Link established in a cell where DRAC is active. If the DRNS does not support DRAC, the DRNC shall not provide these IEs in the RADIO LINK SETUP RESPONSE message.] If no D-RNTI IE was included in the RADIO LINK SETUP REQUEST message, the DRNC shall include the node identifications of the CN Domain nodes that the RNC is connected to (using LAC and RAC of the current cell), and the D-RNTI IE in the RADIO LINK SETUP RESPONSE message. [FDD - If the D-RNTI IE was included the RADIO LINK SETUP REQUEST message the DRNC shall include the Primary Scrambling Code IE, the UL UARFCN IE and the DL UARFCN IE in the RADIO LINK SETUP RESPONSE message.] [TDD – If the D-RNTI IE was included in the RADIO LINK SETUP REQUEST message the DRNC shall include the UARFCN IE, the Cell Parameter ID IE,[3.84Mcps TDD - the Sync Case IE, the SCH Time Slot IE,] the SCTD Indicator IE, and the PCCPCH Power IE in the RADIO LINK SETUP RESPONSE message.] [TDD - The DRNC shall include the Secondary CCPCH Info TDD IE in the RADIO LINK SETUP RESPONSE message if at least one DSCH Information Response IE or USCH Information Response IE is included in the message and at least one DCH is configured for the radio link. The DRNC shall also include the [3.84Mcps TDD - Secondary CCPCH Info TDD IE] [1.28Mcps TDD – Secondary CCPCH Info TDD LCR IE] in the RADIO LINK SETUP RESPONSE message if at least one DSCH Information Response IE or USCH Information Response IE is included in the message and the SHCCH messages for this radio link will be transmitted over a different secondary CCPCH than selected by the UE from system information.] For each Radio Link established in a cell where at least one URA Identity is being broadcast, the DRNC shall include a URA Identity for this cell in the URA ID IE, the Multiple URAs Indicator IE indicating whether or not multiple URA Identities are being broadcast in the cell, and the RNC Identity of all other RNCs that are having at least one cell within the URA in the cell in the URA Information IE in the RADIO LINK SETUP RESPONSE message. Depending on local configuration in the DRNS, it may include the geographical co-ordinates of the cell, represented either by the Cell GAI IE or by the Cell GA Additional Shapes IE and the UTRAN access point position for each of the established RLs in the RADIO LINK SETUP RESPONSE message. If the DRNS need to limit the user rate in the uplink of a DCH already when starting to utilise a new Radio Link, the DRNC shall include the Allowed UL Rate IE of the Allowed Rate Information IE in the DCH Information Response IE for this DCH in the RADIO LINK SETUP RESPONSE message for this Radio Link. If the DRNS need to limit the user rate in the downlink of a DCH already when starting to utilise a new Radio Link, the DRNC shall include the Allowed DL Rate IE of the Allowed Rate Information IE in the DCH Information Response IE for this DCH in the RADIO LINK SETUP RESPONSE message for this Radio Link. If the Permanent NAS UE Identity IE is included in the RADIO LINK SETUP REQUEST message, the DRNS shall store the information for the considered UE Context for the life-time of the UE Context. If the RADIO LINK SETUP REQUEST message includes the Permanent NAS UE Identity IE and a C-ID IE corresponding to a cell reserved for operator use, the DRNC shall use this information to determine whether it can set up a Radio Link on this cell or not for the considered UE Context. [FDD - If the accessed cell supports TFCI power control, the DRNC shall include the TFCI PC Support Indicator IE in the RADIO LINK SETUP RESPONSE message.] [FDD - Radio Link Set Handling]: [FDD - The First RLS Indicator IE indicates if the concerning RL shall be considered part of the first RLS established towards this UE. The First RLS Indicator IE shall be used by the DRNS to determine the initial TPC pattern in the DL of the concerning RL and all RLs which are part of the same RLS, as described in [10], section 5.1.2.2.1.2. [FDD – For each RL not having a common generation of the TPC commands in the DL with another RL, the DRNS shall assign the RL Set ID IE included in the RADIO LINK SETUP RESPONSE message a value that uniquely identifies the RL Set within the UE Context.] [FDD – For all RLs having a common generation of the TPC commands in the DL with another RL, the DRNS shall assign the RL Set ID IE included in the RADIO LINK SETUP RESPONSE message the same value. This value shall uniquely identify the RL Set within the UE context.] [FDD –The UL Uu synchronisation detection algorithm defined in ref. [10] subclause 4.3 shall for each of the established RL Set(s) use the maximum value of the parameters N_OUTSYNC_IND and T_RLFAILURE, and the minimum value of the parameters N_INSYNC_IND, that are configured in the cells supporting the radio links of the RL Set]. Response Message: At the reception of the RADIO LINK SETUP REQUEST message, DRNS allocates requested type of channelisation codes and other physical channel resources for each RL and assigns a binding identifier and a transport layer address for each DCH or set of co-ordinated DCHs and for each DSCH [TDD – and USCH]. This information shall be sent to the SRNC in the message RADIO LINK SETUP RESPONSE when all the RLs have been successfully established. After sending of the RADIO LINK SETUP RESPONSE message the DRNS shall continuously attempt to obtain UL synchronisation on the Uu interface and start reception on the new RL. [FDD - The DRNS shall start DL transmission on the new RL after synchronisation is achieved in the DL user plane as specified in ref. [4].] [TDD – The DRNS shall start transmission on the new RL immediately as specified in ref. [4].]
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.1.3 Unsuccessful Operation
Figure 6: Radio Link Setup procedure: Unsuccessful Operation In unsuccessful case (i.e. one or more RLs can not be established) the RADIO LINK SETUP FAILURE message shall be sent to the SRNC, indicating the reason for failure. If some radio links were established successfully, the DRNC shall indicate this in the RADIO LINK SETUP FAILURE message in the same way as in the RADIO LINK SETUP RESPONSE message. If the RADIO LINK SETUP REQUEST message includes a C-ID IE corresponding to a cell reserved for operator use and the Permanent NAS UE Identity IE is not present, the DRNC shall consider the procedure as failed and send the RADIO LINK SETUP FAILURE message. [FDD - If the accessed cell supports TFCI power control, the DRNC shall include the TFCI PC Support Indicator IE in the RADIO LINK SETUP FAILURE message.] Typical cause values are: Radio Network Layer Causes: - [FDD - UL Scrambling Code Already in Use]; - DL Radio Resources not Available; - UL Radio Resources not Available; - [FDD - Combining Resources not available]; - Combining not Supported - Requested Configuration not Supported; - Cell not Available; - [FDD - Requested Tx Diversity Mode not Supported]; - Power Level not Supported; - Number of DL codes not supported; - Number of UL codes not supported; - Dedicated Transport Channel Type not Supported; - DL Shared Channel Type not Supported; - [TDD - UL Shared Channel Type not Supported]; - [FDD - UL Spreading Factor not Supported]; - [FDD - DL Spreading Factor not Supported]; - CM not Supported; - [FDD – DPC mode change not Supported]; - Cell reserved for operator use. Transport Layer Causes: - Transport Resource Unavailable. Miscellaneous Causes: - Control Processing Overload; - HW Failure; - Not enough User Plane Processing Resources.       Unaffected parts are omitted      
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.2 Radio Link Addition
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.2.1 General
The Synchronised Radio Link Reconfiguration Preparation procedure is used to prepare a new configuration of Radio Link(s) related to one UE-UTRAN connection within a Node B. The Synchronised Radio Link Reconfiguration Preparation procedure shall not be initiated if a Prepared Reconfiguration exists, as defined in subclause 3.1.
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.2.2 Successful Operation
Figure 30: Synchronised Radio Link Reconfiguration Preparation procedure, Successful Operation The Synchronised Radio Link Reconfiguration Preparation procedure is initiated by the CRNC by sending the message RADIO LINK RECONFIGURATION PREPARE to the Node B. The message shall use the Communication Control Port assigned for this Node B Communication Context. Upon reception, the Node B shall reserve necessary resources for the new configuration of the Radio Link(s) according to the parameters given in the message. Unless specified below, the meaning of parameters is specified in other specifications. The Node B shall prioritise resource allocation for the RL(s) to be modified according to Annex A. DCH Modification: If the RADIO LINK RECONFIGURATION PREPARE message includes any DCHs to Modify IEs then the Node B shall treat them each as follows: • If the DCHs to Modify IE includes the Frame Handling Priority IE, the Node B should store this information for this DCH in the new configuration. The received Frame Handling Priority should be used when prioritising between different frames in the downlink on the radio interface in congestion situations within the Node B once the new configuration has been activated. • If the DCHs to Modify IE includes the Transport Format Set IE for the UL of a DCH, the Node B shall apply the new Transport Format Set in the Uplink of this DCH in the new configuration. • If the DCHs to Modify IE includes the Transport Format Set IE for the DL of a DCH, the Node B shall apply the new Transport Format Set in the Downlink of this DCH in the new configuration. • If the DCHs to Modify IE includes multiple DCH Specific Info IEs then the Node B shall treat the DCHs in the DCHs to Modify IE as a set of co-ordinated DCHs. The Node B shall include these DCHs in the new configuration only if it can include all of them in the new configuration. • If the DCHs to Modify IE includes the UL FP Mode IE for a DCH or a DCH which belongs to a set of co-ordinated DCHs, the Node B shall apply the new FP Mode in the Uplink of the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • If the DCHs to Modify IE includes the ToAWS IE for a DCH or a DCH which belongs to a set of co-ordinated DCHs, the Node B shall apply the new ToAWS in the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • If the DCHs to Modify IE includes the ToAWE IE for a DCH or a DCH which belongs to a set of co-ordinated DCHs, the Node B shall apply the new ToAWE in the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • [TDD – If the DCHs to Modify IE includes the CCTrCH ID IE for the DL of a DCH to be modified, the Node B shall apply the new CCTrCH ID in the Downlink of this DCH in the new configuration.] • [TDD – If the DCHs to Modify IE includes the CCTrCH ID IE for the UL of a DCH to be modified, the Node B shall apply the new CCTrCH ID in the Uplink of this DCH in the new configuration.] DCH Addition: If the RADIO LINK RECONFIGURATION PREPARE message includes any DCHs to Add IEs then the Node B shall treat them each as follows: • If the DCHs to Add IE includes multiple DCH specific Info IEs then, the Node B shall treat the DCHs in the DCHs to Add IE as a set of co-ordinated DCHs. The Node B shall include these DCHs in the new configuration only if it can include all of them in the new configuration. • [FDD – For DCHs which do not belong to a set of co-ordinated DCHs with the QE-Selector IE set to "selected", the Transport channel BER from that DCH shall be the base for the QE in the UL data frames. If no Transport channel BER is available for the selected DCH the Physical channel BER shall be used for the QE, ref. [16]. If the QE-Selector is set to "non-selected", the Physical channel BER shall be used for the QE in the UL data frames, ref. [16].] • For a set of co-ordinated DCHs the Transport channel BER from the DCH with the QE-Selector IE set to "selected" shall be used for the QE in the UL data frames, ref. [16]. [FDD – If no Transport channel BER is available for the selected DCH the Physical channel BER shall be used for the QE, ref. [16]. If all DCHs have QE-Selector IE set to ”non-selected” the Physical channel BER shall be used for the QE, ref. [16].] • The Node B should store the Frame Handling Priority IE received for a DCH to be added in the new configuration The received Frame Handling Priority should be used when prioritising between different frames in the downlink on the radio interface in congestion situations within the Node B once the new configuration has been activated. • The Node B shall use the included UL FP Mode IE for a DCH or a set of co-ordinated DCHs to be added as the new FP Mode in the Uplink of the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • The Node B shall use the included ToAWS IE for a DCH or a set of co-ordinated DCHs to be added as the new Time of Arrival Window Start Point in the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • The Node B shall use the included ToAWE IE for a DCH or a set of co-ordinated DCHs to be added as the new Time of Arrival Window End Point in the user plane for the DCH or the set of co-ordinated DCHs in the new configuration. • [TDD – The Node B shall apply the CCTrCH ID IE (for the DL) in the Downlink of this DCH in the new configuration.] • [TDD – The Node B shall apply the CCTrCH ID IE (for the UL) in the Uplink of this DCH in the new configuration.] DCH Deletion: If the RADIO LINK RECONFIGURATION PREPARE message includes any DCHs to Delete IEs, the Node B shall not include the referenced DCHs in the new configuration. If all of the DCHs belonging to a set of coordinated DCHs are requested to be deleted, the Node B shall not include this set of coordinated DCHs in the new configuration. Physical Channel Modification: [FDD – If the RADIO LINK RECONFIGURATION PREPARE message includes an UL DPCH Information IE then the Node B shall apply the parameters to the new configuration as follows: ] • [FDD – If the UL DPCH Information IE includes the Uplink Scrambling Code IE, the Node B shall apply this Uplink Scrambling Code to the new configuration.] • [FDD – If the UL DPCH Information IE includes the Min UL Channelisation Code Length IE, the Node B shall apply the value in the new configuration. The Node B shall apply the contents of the Max Number of UL DPDCHs IE (if it is included) in the new configuration.] • [FDD – If the UL DPCH Information IE includes the UL SIR Target IE, the Node B shall use the value for the UL inner loop power control when the new configuration is being used.] • [FDD – If the UL DPCH Information IE includes the Puncture Limit IE, the Node B shall apply the value in the uplink of the new configuration.] • [FDD – The Node B shall use the TFCS IE for the UL (if present) when reserving resources for the uplink of the new configuration. The Node B shall apply the new TFCS in the Uplink of the new configuration.] • [FDD – If the UL DPCH Information IE includes the UL DPCCH Slot Format IE, the Node B shall set the new Uplink DPCCH Structure to the new configuration.] • [FDD - If the UL DPCH Information IE includes the Diversity Mode IE, the Node B shall apply diversity according to the given value.] • [FDD – If the UL DPCH Information IE includes an SSDT Cell Identity Length IE and/or an S-Field Length IE, the Node B shall apply the values in the new configuration.] [FDD - If the RADIO LINK RECONFIGURATION PREPARE message includes a DL DPCH Information IE then the Node B shall apply the parameters to the new configuration as follows:] • [FDD – The Node B shall use the TFCS IE for the DL (if it is present) when reserving resources for the downlink of the new configuration. The Node B shall apply the new TFCS in the Downlink of the new configuration.] • [FDD – If the DL DPCH Information IE includes the TFCI Signalling Mode IE or the TFCI Presence IE, the Node B shall use the information when building TFCIs in the new configuration.] • [FDD – If the DL DPCH Information IE includes the DL DPCCH Slot Format IE, group the Node B shall set the new Downlink DPCCH Structure to the new configuration.] • [FDD – If the DL DPCH Information IE includes the Multiplexing Position IE, the Node B shall apply the indicated multiplexing type in the new configuration.] • [FDD – If the DL DPCH Information IE includes the Limited Power Increase IE and the IE is set to 'Used', the Node B shall use Limited Power Increase ref. [10] subclause 5.2.1 for the inner loop DL power control in the new configuration.] • [FDD – If the DL DPCH Information IE includes the Limited Power Increase IE and the IE is set to 'Not Used', the Node B shall not use Limited Power Increase for the inner loop DL power control in the new configuration.] • [FDD – If the DL DPCH Information IE includes the PDSCH code mapping IE then the Node B shall apply the defined mapping between TFCI values and PDSCH channelisation codes.] • [FDD – If the DL DPCH Information IE includes the PDSCH RL ID IE then the Node B shall infer that the PDSCH for the specified user will be transmitted on the defined radio link.] [FDD – If the RADIO LINK RECONFIGURATION PREPARE message includes the Transmission Gap Pattern Sequence Information IE the Node B shall store the new information about the Transmission Gap Pattern Sequences to be used in the new Compressed Mode Configuration. This new Compressed Mode Configuration shall be valid in the Node B until the next Compressed Mode Configuration is configured in the Node B or Node B Communication Context is deleted.] [TDD – UL/DL CCTrCH Modification] [TDD – If the RADIO LINK RECONFIGURATION PREPARE message includes any UL CCTrCH to Modify or DL CCTrCH to Modify IEs, then the Node B shall treat them each as follows:] • [TDD – If the IE includes any of TFCS IE, TFCI coding IE or Puncture Limit IE the Node B shall apply these as the new values, otherwise the old values specified for this CCTrCH are still applicable.] • [TDD – If the IE includes any UL DPCH to add or DL DPCH to add IEs, the Node B shall include this DPCH in the new configuration.] • [TDD – If the IE includes any UL DPCH to delete or DL DPCH to delete IEs, the Node B shall remove this DPCH in the new configuration.] - [TDD – If the IE includes any UL DPCH to modify or DL DPCH to modify IEs, and includes any of Repetition Period IE, Repetition Length IE, or TDD DPCH Offset IE or the message includes UL/DL Timeslot Information and includes any of [3.84Mcps TDD - Midamble shift and Burst Type IE, Time Slot IE], [1.28Mcps TDD - Midamble shift LCR IE, Time Slot LCR IE], or TFCI presence IE or the message includes UL/DL Code information and includes [3.84Mcps TDD - TDD Channelisation Code IE], [1.28Mcps TDD - TDD Channelisation Code LCR IE], the Node B shall apply these specified information elements as the new values, otherwise the old values specified for this DPCH configuration are still applicable.] - [1.28Mcps TDD – If the UL CCTrCH to Modify IE includes the UL SIR Target IE, the Node B shall use the value for the UL inner loop power control according [19] and [21] when the new configuration is being used.] [TDD – UL/DL CCTrCH Addition] [TDD – If the RADIO LINK RECONFIGURATION PREPARE message includes any UL CCTrCH to Add IE or DL CCTrCH to Add IE, the Node B shall include this CCTrCH in the new configuration.] [TDD – If the UL/DL CCTrCH to Add IE includes any UL/DL DPCH Information IE, the Node B shall reserve necessary resources for the new configuration of the UL/DL DPCH(s) according to the parameters given in the message.] [TDD – If the RADIO LINK RECONFIGURATION PREPARE message includes a DL CCTrCH to Add IE, the Node B shall set the TPC step size of that CCTrCH to the same value as the lowest numbered DL CCTrCH in the current configuration.] [1.28Mcps TDD –The Node B shall use the UL SIR Target IE in the UL CCTrCH to Add IE as the UL SIR value for the inner loop power control for this CCTrCH according [19] and [21] in the new configuration.] [TDD – UL/DL CCTrCH Deletion] [TDD – If the RADIO LINK RECONFIGURATION PREPARE message includes any UL or DL CCTrCH to be deleted , the Node B shall remove this CCTrCH in the new configuration.] DSCH Addition/Modification/Deletion: If the RADIO LINK RECONFIGURATION PREPARE message includes any DSCH to modify, DSCH to add or DSCH to delete IEs, then the Node B shall use this information to add/modify/delete the indicated DSCH channels to/from the radio link, in the same way as the DCH info is used to add/modify/release DCHs. The Node B shall include in the RADIO LINK RECONFIGURATION READY message both the Transport Layer Address IE and the Binding ID IE for the transport bearer to be established for each DSCH. [FDD – If the RADIO LINK RECONFIGURATION PREPARE message includes the TFCI2 Bearer Information IE then the Node B shall support the establishment of a transport bearer on which the DSCH TFCI Signaling control frames shall be received if one does not already exist or shall apply the new values if such a bearer does already exist. The Binding ID IE and Transport Layer Address IE of any new bearer to be set up for this purpose shall be returned in the RADIO LINK RECONFIGURATION READY message. If the RADIO LINK RECONFIGURATION PREPARE message specifies that the TFCI2 transport bearer is to be deleted then the Node B shall release the resources associated with that bearer in the new configuration. [FDD – If the TFCI Signalling Mode IE within the RADIO LINK RECONFIGURATION PREPARE message indicates that there shall be a hard split on the TFCI field but a TFCI2 transport bearer has not already been set up and TFCI2 Bearer Information IE is not included in the message then the Node B shall transmit the TFCI2 field with zero power in the new configuration.] [FDD – If the TFCI Signalling Mode IE within the RADIO LINK RECONFIGURATION PREPARE message indicates that there shall be a hard split on the TFCI and the TFCI2 Bearer Information IE is included in the message then the Node B shall transmit the TFCI2 field with zero power until Synchronisation is achieved on the TFCI2 transport bearer and the first valid DSCH TFCI Signalling control frame is received on this bearer in the new configuration (see ref. [24]).] [FDD - If the RADIO LINK RECONFIGURATION PREPARE message includes the DSCH Common Information IE, the Node B shall treat it as follows:] - [FDD - If the Enhanced DSCH PC Indicator IE is included and set to "Enhanced DSCH PC Active in the UE ", the Node B shall activate enhanced DSCH power control in accordance with ref. [10] subclause 5.2.2, if supported, using either:] - [FDD - the SSDT Cell Identity for EDSCHPC IE in the RL Information IE, if the SSDT Cell Identity IE is not included in the RL Information IE or] - [FDD - the SSDT Cell Identity IE in the RL Information IE, if both the SSDT Cell Identity IE and the SSDT Cell Identity for EDSCHPC IE are included in the RL Information IE.] [FDD - together with the SSDT Cell Identity Length IE in UL DPCH Information IE, and Enhanced DSCH PC IE, in the new configuration.] [FDD - If the enhanced DSCH power control is activated and the TFCI power control in DSCH hard split mode is supported, the primary/secondary status determination in the enhanced DSCH power control is also applied to the TFCI power control in DSCH hard split mode.] [FDD - If the RADIO LINK RECONFIGURATION PREPARE message includes the Enhanced DSCH PC Indicator IE set to "Enhanced DSCH PC not Active in the UE", the Node B shall deactivate enhanced DSCH power control in the new configuration.] [TDD – USCH Addition/Modification/Deletion:] • [TDD – If the RADIO LINK RECONFIGURATION PREPARE message includes USCH information for the USCHs to be added/modified/deleted then the Node B shall use this information to add/modify/delete the indicated USCH channels to/from the radio link, in the same way as the DCH info is used to add/modify/release DCHs.] • [TDD – The Node B shall include in the RADIO LINK RECONFIGURATION READY message both the Transport Layer Address IE and the Binding ID IE for the transport bearer to be established for each USCH.] RL Information: If the RADIO LINK RECONFIGURATION PREPARE message includes the RL Information IE, the Node B shall treat it as follows: • [FDD – When more than one DL DPDCH are assigned per RL, the segmented physical channel shall be mapped on to DL DPDCHs according to [8]. When p number of DL DPDCHs are assigned to each RL, the first pair of DL Scrambling Code and FDD DL Channelisation Code Number corresponds to "PhCH number 1", the second to "PhCH number 2", and so on until the pth to "PhCH number p".] • [FDD – If the RL Information IE includes the SSDT Indication IE set to "SSDT Active in the UE", the Node B may activate SSDT using the SSDT Cell Identity IE in the new configuration.] • [FDD – If the RL Information IE includes the SSDT Indication IE set to "SSDT not Active in the UE", the Node B shall deactivate SSDT in the new configuration.] • [FDD – If the RL Information IE includes a DL Code Information IE, the Node B shall apply the values in the new configuration.] • [FDD – If the RL Information IE contains the Transmission Gap Pattern Sequence Code Information IE in the DL Code Information IE for any of the allocated DL Channelisation Codes, the Node B shall apply the alternate scrambling code as indicated whenever the downlink compressed mode method SF/2 is active in the new configuration.] - If the RL Information IE includes the Maximum DL Power and/or the Minimum DL Power IEs, the Node B shall apply the values in the new configuration. [FDD - During compressed mode, the PSIR(k) , as described in ref.[10] subclause 5.2.1.3, shall be added to the maximum DL power in slot k.]. - [TDD – If the RL Information IE includes the Initial DL Transmission Power IE, the Node B shall apply the given power to the transmission on each DPCH of the CCTrCH when starting transmission on a new CCTrCH.until the UL synchronisation on the Uu is achieved for the CCTrCH. If no Initial DL Transmission power IE is included with a new CCTrCH, the Node B shall use any transmission power level currently used on already existing CCTrCH’s when starting transmission for a new CCTrCH. No inner loop power control shall be performed during this period. The DL power shall then vary according to the inner loop power control (see ref.[22], subclause 4.2.3.3).] General If the requested modifications are allowed by the Node B and the Node B has successfully reserved the required resources for the new configuration of the Radio Link(s), it shall respond to the CRNC with the RADIO LINK RECONFIGURATION READY message. When this procedure has been completed successfully there exist a Prepared Reconfiguration, as defined in subclause 3.1. In the RADIO LINK RECONFIGURATION READY message, the Node B shall include the RL Information Response IE for each affected Radio Link. The Node B shall include in the RADIO LINK RECONFIGURATION READY message the Transport Layer Address and the Binding ID for any Transport Channel being added, or any Transport Channel being modified for which a new transport bearer was requested with the Transport Bearer Request Indicator IE. In case of a DCH requiring a new transport bearer on Iub, the Transport Layer Address IE and the Binding ID shall be included in the IE DCH Information Response IE. In case of a set of coordinated DCHs requiring a new transport bearer on Iub, the Transport Layer Address IE and the Binding ID IE in the DCH Information Response IE shall be included only for one of the DCH in the set of coordinated DCHs. In case of a Radio Link being combined with another Radio Link within the Node B,the RL Information Response IE shall be included only for one of the combined RLs. The Transport Layer Address IE and the Binding ID IE in the DCH Information Response IE shall be included only for one of the combined Radio Links. ==================================================================== 5.4.3.3 Impacts on DCH FP (TS 25.427) =========================== TS 25.427 ==============================
83726f0f79dd0b5bad7d922a555d137b
25.870
8.3.2.3 Unsuccessful Operation
Figure 8: Radio Link Addition procedure: Unsuccessful Operation If the establishment of at least one RL is unsuccessful, the DRNC shall send a RADIO LINK ADDITION FAILURE as response. If some RL(s) were established successfully, the DRNC shall indicate this in the RADIO LINK ADDITION FAILURE message in the same way as in the RADIO LINK ADDITION RESPONSE message. [FDD – If the RADIO LINK ADDITION REQUEST message includes the Active Pattern Sequence Information IE and the DRNS cannot provide the requested compressed mode the DRNS shall regard the Radio Link Addition procedure as failed and shall respond with a RADIO LINK ADDITION FAILURE message with the cause value "Invalid CM settings".] [FDD - If the accessed cell supports TFCI power control, the DRNC shall include the TFCI PC Support Indicator IE in the RADIO LINK ADDITION FAILURE message.] Typical cause values are: Radio Network Layer Causes: - DL Radio Resources not Available; - UL Radio Resources not Available; - Combining Resources not Available; - Combining not Supported - Cell not Available; - [FDD - Requested Tx Diversity Mode not Supported]; - Power Level not Supported; - CM not Supported; - Reconfiguration CFN not Elapsed; - Number of DL Codes not Supported; - Number of UL codes not Supported; - [FDD – DPC mode change not Supported]; - Cell reserved for operator use. Transport Layer Causes: - Transport Resource Unavailable. Miscellaneous Causes: - Control Processing Overload; - HW Failure; - Not enough User Plane Processing Resources.       Unaffected parts are omitted      
83726f0f79dd0b5bad7d922a555d137b
25.870
9.1.4 RADIO LINK SETUP RESPONSE
83726f0f79dd0b5bad7d922a555d137b
25.870
9.1.4.1 FDD Message
IE/Group Name Presence Range IE type and reference Semantics description Criticality Assigned Criticality Message Type M 9.2.1.40 YES reject Transaction ID M 9.2.1.59 – D-RNTI O 9.2.1.24 YES ignore CN PS Domain Identifier O 9.2.1.12 YES ignore CN CS Domain Identifier O 9.2.1.11 YES ignore RL Information Response 1..<maxnoofRLs> EACH ignore >RL ID M 9.2.1.49 – >RL Set ID M 9.2.2.35 – >URA Information O 9.2.1.70B – >SAI M 9.2.1.52 – >Cell GAI O 9.2.1.5A – >UTRAN Access Point Position O 9.2.1.70A – >Received Total Wide Band Power M 9.2.2.35A – >Secondary CCPCH Info O 9.2.2.37B – >DL Code Information M FDD DL Code Information 9.2.2.14A – >Diversity Indication C-NotFirstRL 9.2.1.21 – >CHOICE Diversity Indication M – >>Combining – >>>RL ID M 9.2.1.49 Reference RL ID for the combining – >>>DCH Information Response O 9.2.1.16A YES ignore >>Non Combining or First RL – >>>DCH Information Response M 9.2.1.16A – >SSDT Support Indicator M 9.2.2.43 – >Maximum Uplink SIR M Uplink SIR 9.2.1.69 – >Minimum Uplink SIR M Uplink SIR 9.2.1.69 – >Closed Loop Timing Adjustment Mode O 9.2.2.3A – >Maximum Allowed UL Tx Power M 9.2.1.35 – >Maximum DL TX Power M DL Power 9.2.1.21A – >Minimum DL TX Power M DL Power 9.2.1.21A – >Primary Scrambling Code O 9.2.1.45 – >UL UARFCN O UARFCN 9.2.1.66 Corresponds to Nu in ref. [6] – >DL UARFCN O UARFCN 9.2.1.66 Corresponds to Nd in ref. [6] – >Primary CPICH Power M 9.2.1.44 – >DSCH Information Response O DSCH FDD Information Response 9.2.2.13B YES ignore >Neighbouring UMTS Cell Information O 9.2.1.41A – >Neighbouring GSM Cell Information O 9.2.1.41C – >PC Preamble M 9.2.2.27a – >SRB Delay M 9.2.2.39A – >Cell GA Additional Shapes O 9.2.1.5B YES ignore >TFCI PC Support Indicator O 9.2.2.x YES ignore Uplink SIR Target O Uplink SIR 9.2.1.69 YES ignore Criticality Diagnostics O 9.2.1.13 YES ignore Condition Explanation NotFirstRL The IE shall be present if the RL is not the first RL in the RL Information Response IE. Range bound Explanation MaxnoofRLs Maximum number of RLs for one UE.       Unaffected parts are omitted      
83726f0f79dd0b5bad7d922a555d137b
25.870
9.1.5 RADIO LINK SETUP FAILURE