| WMP Table # / Category,WMP Initiative #,Initative activity,WMP category,section / initiative # |
| Risk Assessment & Mapping,1,A summarized risk map that shows the overall ignition probability and estimated wildfire consequence along the electric lines and equipment ,5.3.1.,5.3.1.1 |
| Risk Assessment & Mapping,2,Climate-driven risk map and modelling based on various relevant weather scenarios ,5.3.1.,5.3.1.2 |
| Risk Assessment & Mapping,3,Ignition probability mapping showing the probability of ignition along the electric lines and equipment ,5.3.1.,5.3.1.3 |
| Risk Assessment & Mapping,4,Initiative mapping and estimation of wildfire and PSPS risk-reduction impact ,5.3.1.,5.3.1.4 |
| Risk Assessment & Mapping,5,Match drop simulations showing the potential wildfire consequence of ignitions that occur along the electric lines and equipment ,5.3.1.,5.3.1.5 |
| Situational Awareness & Forecasting,1,Advanced weather monitoring and weather stations ,5.3.2.,5.3.2.1 |
| Situational Awareness & Forecasting,2,Continuous monitoring sensors ,5.3.2.,5.3.2.2 |
| Situational Awareness & Forecasting,3,Fault indicators for detecting faults on electric lines and equipment ,5.3.2.,5.3.2.3 |
| Situational Awareness & Forecasting,4,"Forecast of a fire risk index, fire potential index, or similar ",5.3.2.,5.3.2.4 |
| Situational Awareness & Forecasting,5,Personnel monitoring areas of electric lines and equipment in elevated fire risk conditions ,5.3.2.,5.3.2.5 |
| Situational Awareness & Forecasting,6,Weather forecasting and estimating impacts on electric lines and equipment ,5.3.2.,5.3.2.6 |
| Grid Design & System Hardening,1,Capacitor maintenance and replacement program ,5.3.3.,5.3.3.1 |
| Grid Design & System Hardening,2,Circuit breaker maintenance and installation to de-energize lines upon detecting a fault ,5.3.3.,5.3.3.2 |
| Grid Design & System Hardening,3,Covered conductor installation ,5.3.3.,5.3.3.3 |
| Grid Design & System Hardening,4,Covered conductor maintenance ,5.3.3.,5.3.3.4 |
| Grid Design & System Hardening,5,"Crossarm maintenance, repair, and replacement ",5.3.3.,5.3.3.5 |
| Grid Design & System Hardening,6,"Distribution pole replacement and reinforcement, including with composite poles ",5.3.3.,[MISSING] |
| Grid Design & System Hardening,7,Expulsion fuse replacement ,5.3.3.,5.3.3.7 |
| Grid Design & System Hardening,8,Grid topology improvements to mitigate or reduce PSPS events ,5.3.3.,5.3.3.8 |
| Grid Design & System Hardening,9,Installation of system automation equipment ,5.3.3.,5.3.3.9 |
| Grid Design & System Hardening,10,"Maintenance, repair, and replacement of connectors, including hotline clamps ",5.3.3.,5.3.3.10 |
| Grid Design & System Hardening,11,Mitigation of impact on customers and other residents affected during PSPS event ,5.3.3.,5.3.3.11 |
| Grid Design & System Hardening,12,Other corrective action ,5.3.3.,5.3.3.12 |
| Grid Design & System Hardening,13,Pole loading infrastructure hardening and replacement program based on pole loading assessment program ,5.3.3.,5.3.3.13 |
| Grid Design & System Hardening,14,Transformers maintenance and replacement ,5.3.3.,5.3.3.14 |
| Grid Design & System Hardening,15,Transmission tower maintenance and replacement ,5.3.3.,5.3.3.15 |
| Grid Design & System Hardening,16,Undergrounding of electric lines and/or equipment ,5.3.3.,5.3.3.16 |
| Grid Design & System Hardening,17,Updates to grid topology to minimize risk of ignition in HFTDs ,5.3.3.,5.3.3.17 |
| Asset Management & Inspections,1,Detailed inspections of distribution electric lines and equipment ,5.3.4.,5.3.4.1 |
| Asset Management & Inspections,2,Detailed inspections of transmission electric lines and equipment ,5.3.4.,5.3.4.2 |
| Asset Management & Inspections,3,Improvement of inspections ,5.3.4.,5.3.4.3 |
| Asset Management & Inspections,4,Infrared inspections of distribution electric lines and equipment ,5.3.4.,5.3.4.4 |
| Asset Management & Inspections,5,Infrared inspections of transmission electric lines and equipment ,5.3.4.,5.3.4.5 |
| Asset Management & Inspections,6,Intrusive pole inspections ,5.3.4.,5.3.4.6 |
| Asset Management & Inspections,7,LiDAR inspections of distribution electric lines and equipment ,5.3.4.,5.3.4.7 |
| Asset Management & Inspections,8,LiDAR inspections of transmission electric lines and equipment ,5.3.4.,5.3.4.8 |
| Asset Management & Inspections,9,"Other discretionary inspection of distribution electric lines and equipment, beyond inspections mandated by rules and regulations ",5.3.4.,5.3.4.9 |
| Asset Management & Inspections,10,Other discretionary inspection of transmission electric lines and ,5.3.4.,5.3.4.10 |
| Asset Management & Inspections,11,Patrol inspections of distribution electric lines and equipment ,5.3.4.,5.3.4.11 |
| Asset Management & Inspections,12,Patrol inspections of transmission electric lines and equipment ,5.3.4.,5.3.4.12 |
| Asset Management & Inspections,13,Pole loading assessment program to determine safety factor ,5.3.4.,5.3.4.13 |
| Asset Management & Inspections,14,Quality assurance / quality control of inspections ,5.3.4.,5.3.4.14 |
| Asset Management & Inspections,15,Substation inspections ,5.3.4.,5.3.4.15 |
| Vegetation Management & Inspections,1,Additional efforts to manage community and environmental impacts ,5.3.5.,5.3.5.1 |
| Vegetation Management & Inspections,2,Detailed inspections of vegetation around distribution electric lines and equipment ,5.3.5.,5.3.5.2 |
| Vegetation Management & Inspections,3,Detailed inspections of vegetation around transmission electric lines and equipment ,5.3.5.,5.3.5.3 |
| Vegetation Management & Inspections,4,Emergency response vegetation management due to red flag warning or other urgent conditions ,5.3.5.,5.3.5.4 |
| Vegetation Management & Inspections,5,Fuel management and reduction of “slash” from vegetation management activities ,5.3.5.,5.3.5.5 |
| Vegetation Management & Inspections,6,Improvement of inspections ,5.3.5.,5.3.5.6 |
| Vegetation Management & Inspections,7,LiDAR inspections of vegetation around distribution electric lines and equipment ,5.3.5.,5.3.5.7 |
| Vegetation Management & Inspections,8,"LiDAR inspections of vegetation around transmission electric lines and equipment |
| ",5.3.5.,5.3.5.8 |
| Vegetation Management & Inspections,9,Other discretionary inspections of vegetation around distribution electric lines and equipment ,5.3.5.,5.3.5.9 |
| Vegetation Management & Inspections,10,"Other discretionary inspections of vegetation around transmission electric lines and equipment |
| ",5.3.5.,5.3.5.10 |
| Vegetation Management & Inspections,11,Patrol inspections of vegetation around distribution electric lines and equipment ,5.3.5.,5.3.5.11 |
| Vegetation Management & Inspections,12,Patrol inspections of vegetation around transmission electric lines and equipment ,5.3.5.,5.3.5.12 |
| Vegetation Management & Inspections,13,Quality assurance / quality control of vegetation inspections ,5.3.5.,5.3.5.13 |
| Vegetation Management & Inspections,14,Recruiting and training of vegetation management personnel ,5.3.5.,5.3.5.14 |
| Vegetation Management & Inspections,15,Remediation of at-risk species ,5.3.5.,5.3.5.15 |
| Vegetation Management & Inspections,16,Removal and remediation of trees with strike potential to electric lines and equipment ,5.3.5.,5.3.5.16 |
| Vegetation Management & Inspections,17,Substation inspection ,5.3.5.,5.3.5.17 |
| Vegetation Management & Inspections,18,Substation vegetation management ,5.3.5.,5.3.5.18 |
| Vegetation Management & Inspections,19,Vegetation inventory system ,5.3.5.,5.3.5.19 |
| Vegetation Management & Inspections,20,Vegetation management to achieve clearances around electric lines and equipment ,5.3.5.,5.3.5.20 |
| Grid Operations & Operating Protocols,1,Automatic recloser operations ,5.3.6.,5.3.6.1 |
| Grid Operations & Operating Protocols,2,Crew-accompanying ignition prevention and suppression resources and services ,5.3.6.,5.3.6.2 |
| Grid Operations & Operating Protocols,3,Personnel work procedures and training in conditions of elevated fire risk ,5.3.6.,5.3.6.3 |
| Grid Operations & Operating Protocols,4,Protocols for PSPS re-energization ,5.3.6.,5.3.6.4 |
| Grid Operations & Operating Protocols,5,PSPS events and mitigation of PSPS impacts ,5.3.6.,5.3.6.5 |
| Grid Operations & Operating Protocols,6,Stationed and on-call ignition prevention and suppression resources and services ,5.3.6.,5.3.6.6 |
| Data Governance,1,Centralized repository for data ,5.3.7.,5.3.7.1 |
| Data Governance,2,Collaborative research on utility ignition and/or wildfire ,5.3.7.,5.3.7.2 |
| Data Governance,3,Documentation and disclosure of wildfire-related data and algorithms ,5.3.7.,5.3.7.3 |
| Data Governance,4,Tracking and analysis of near miss data ,5.3.7.,5.3.7.4 |
| Resource Allocation Methodology,1,Allocation methodology development and application ,5.3.8.,5.3.8.1 |
| Resource Allocation Methodology,2,Risk reduction scenario development and analysis ,5.3.8.,5.3.8.2 |
| Resource Allocation Methodology,3,Risk spend efficiency analysis,5.3.8.,5.3.8.3 |
| Emergency Planning & Preparedness,1,Adequate and trained workforce for service restoration ,5.3.9.,5.3.9.1 |
| Emergency Planning & Preparedness,2,"Community outreach, public awareness, and communications efforts ",5.3.9.,5.3.9.2 |
| Emergency Planning & Preparedness,3,Customer support in emergencies ,5.3.9.,5.3.9.3 |
| Emergency Planning & Preparedness,4,Disaster and emergency preparedness plan ,5.3.9.,5.3.9.4 |
| Emergency Planning & Preparedness,5,Preparedness and planning for service restoration ,5.3.9.,5.3.9.5 |
| Emergency Planning & Preparedness,6,Protocols in place to learn from wildfire events ,5.3.9.,5.3.9.6 |
| Stakeholder Cooperation & Community Engagement,1,Community engagement ,5.3.10.,5.3.10.1 |
| Stakeholder Cooperation & Community Engagement,2,Cooperation and best practice sharing with agencies outside CA ,5.3.10.,5.3.10.2 |
| Stakeholder Cooperation & Community Engagement,3,Cooperation with suppression agencies ,5.3.10.,5.3.10.3 |
| Stakeholder Cooperation & Community Engagement,4,Forest service and fuel reduction cooperation and joint roadmap ,5.3.10.,5.3.10.4 |
|
|